This study primarily concerns the Model Contract for International Sale of Manufactured Goods recently published by International Chamber of Commerce in 2020. To this end, this study examines the importance of the ICC model contract and its main characteristics, and considers in what form the contract is composed of and the scope of its application by classifying it according to the object of the contract, the subject and type of the transaction. In addition, this study divides the main contents of the ICC model contract into special conditions and general conditions, and attempts to scrutinize details of each condition in connection with the United Nations Convention on Contracts for International Sale of Goods(1980) as a governing law taken by the ICC model contract. Furthermore, this study puts forward, on the basis of the detailed examination of main conditions of ICC Model Contract, practical implications on what the parties to the contract should be aware of when using the ICC model contract.
The purpose of this paper is to examine the several points at issue in international technology transfer contract from licensor's and licensee's perspectives, and to refer them when the licensor and the licensee draw up the contract. This author analyzed the critical points of the related provisions of ICC Model International Technology Transfer Contract(2009) by citing the explanations of the Introduction of the Model Contract. The provisions of the Model Contract are generally divided into two categolies; specific conditions and general conditions. This author selected four topics in the specific conditions; Contents of the Contract, Royalty, Modification and/or Improvements of Products, and Territory and Competition. Likewise this author selected three topics in the general conditions; Resolutions of Disputes, Applicable Law and Taxes. Both parties need to be mindful of the following points in the above topics, when they draw up the contract. First, both parties should make the definitions of special terminologies clear, which are included in the Contract. Second, before the parties sign the Contract, they should check any approvals to be necessary by the both countries' governments. Third, for the calculation of the royalty, they should clear the criteria, the scope, and the object. Fourth, as the local laws or regional laws regarding the territory limitation and taxation are mandatory, any provisions of the Contract should not be inconsistent with them. Therefore, both parties should check before-hand the local laws or rules related with the provisions of the Contract. Fifth, when the parties draw up the Contract, they should examine the Provisions of Dispute Resolution in consideration of the Governing Law. Thus both parties decide to make the technology transfer contract, the three aspects namely profitability, legal conflict with mandatory rules, and sustainability of the business resulting from the Contract should be examined in advance, and then proceed the business using the technology transfer.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.177-185
/
2005
Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.3
/
pp.497-503
/
2018
Most of the conditions of contract applied in international construction contracts, including various conditions of contract published by FIDIC, include the provision for Retention Money which inevitably result in negative impact on cash-flow or financial burden to the contractors. In this study, fundamental reasons behind the application of Retention Money provisions are analysed and contractual mechanisms included in the FIDIC conditions of contract are searched, which include provisions for Performance Security and Defects as well as Termination, so that proper judgement can be derived on the application of Retention Money. In conclusion, considering the various contract provisions, performance security, termination of the contract by the Employer etc. included in the FIDIC conditions of contract, it is not necessary to include the provision for Retention Money.
Few studies have specifically focused on the uncertainty of demand forecasting despite the fact that uncertainty is the one of greatest risks for governments and private partners in PPP projects. This study presents a methodology for finding robust contract conditions considering uncertainty in travel demand forecasting in a PPP project. Through a case study of an urban railway PPP project in Korea, this study uncovered the risk of excessive government payments to private partners due to the uncertainty in contracted forecast ridership levels. The results allow the suggestion that robust contract conditions could reduce the expected total level of government payments and lower user fees while maintaining profitability of the project. This study offers a framework that assists contract negotiators and gives them more information regarding financial risks and vulnerabilities and helps them to quantify the likelihood of these vulnerabilities coming into play during PPP projects.
This paper analyzes how franchise contract conditions are influenced by business structures as well as how contract conditions affect producer surplus by utilizing Korean franchise Information Disclosure Documents for the years 2014-2016. We find that franchise fees tend to increase in line with increases in the numbers of direct stores or the business period. Accordingly, it would be reasonable to check whether the franchise fee is excessive compared to the amount of reputation capital rather than to criticize the absolute level of the franchise fee. Regarding royalty contracts, the larger the discount in the raw materials purchase is, the higher the initial royalty is. Although this appears to be a royalty discount, it can be a means of inducing a raw materials purchase contract by initially setting a high royalty rate and then lowering it after the purchase contract is signed. Concerning the effect on producer surplus, the results show that an increase in franchise fees and royalties negatively affects the franchisee's operating profits but positively affects those of the franchisor's, leading to conflicts over the distribution of economic value added. Based on the findings here, we propose various policy recommendations, specifically reinforcing the contents in the Information Disclosure Document, further activating fixed-rate royalties, and strengthening the qualifications of franchisors when recruiting franchisees.
Journal of the Korea Institute of Building Construction
/
v.20
no.6
/
pp.527-535
/
2020
This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.
The EPC/Turnkey Contract goes to the extreme in allocating risks to the contractor and depending on the types of project, this may be regarded as unacceptable. It has also gone to the extreme in the extent to which the contractor is responsible for the specification and design of the Works. The employer is not responsible for correctness of any information provided by him nor for correctness of any specification or other matter included in the Employer's Requirements, except the definition of the intended purpose and criteria for testing and performance. With such conditions it is surprising that the employer is entitled to interfere in the contractors performance to an extent that is close to what is norm for a construction contract with employer design and with normal risk allocation. The combination of risk allocation and inappropriate administrative provisions makes the EPC/Turnkey Contract a document that will meet severe resistance from contractors. It is also likely that employers will see the risks and difficulties from their own perspective. It is a fiction that the EPC/Turnkey Contract will give the employer a contact with a certainty of final price and completion date. It is not a fiction that the EPC/Turnkey Contract carries many seeds for disputes between the parties. The Orange Book has become an accepted document even if it clearly contains some weaknesses. Some of these have been corrected in the Plant Contract. In my opinion FIDIC should let users become more familiar with the Plant Contract as a follow up to the Orange Book.
Journal of Korean Institute of Industrial Engineers
/
v.34
no.3
/
pp.355-361
/
2008
Technology developers in academia tend to be short of professional knowledge and recognition of technology transfer strategies. It is even severe in Korea where the concept of employee's invention has just started to effect in academia. Wasteful contract negotiation disputes cannot only be painful but also can hamper better invention. The main purpose of this paper is to design guidelines for an optimal contract strategy for technology transfer from the perspective of the technology developer in academia, the intermediary and the receiver. Applying conjoint analysis, this study shows not only the relative importance of the attributes related to the technology transfer contract but also the most important conditions of the contract. It is expected that this study may improve the efficiency of technology transfer activities in academia in Korea.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.239-242
/
2007
Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.