A Study on the FIDIC's Conditions of Contract for EPC/Turnkey Projects

FIDIC의 EPC/Turnkey 프로젝트용 표준약관(標準約款)에 관한 연구(硏究)

  • 최명국 (경일대학교 인터넷국제통상학과)
  • Published : 2002.08.30

Abstract

The EPC/Turnkey Contract goes to the extreme in allocating risks to the contractor and depending on the types of project, this may be regarded as unacceptable. It has also gone to the extreme in the extent to which the contractor is responsible for the specification and design of the Works. The employer is not responsible for correctness of any information provided by him nor for correctness of any specification or other matter included in the Employer's Requirements, except the definition of the intended purpose and criteria for testing and performance. With such conditions it is surprising that the employer is entitled to interfere in the contractors performance to an extent that is close to what is norm for a construction contract with employer design and with normal risk allocation. The combination of risk allocation and inappropriate administrative provisions makes the EPC/Turnkey Contract a document that will meet severe resistance from contractors. It is also likely that employers will see the risks and difficulties from their own perspective. It is a fiction that the EPC/Turnkey Contract will give the employer a contact with a certainty of final price and completion date. It is not a fiction that the EPC/Turnkey Contract carries many seeds for disputes between the parties. The Orange Book has become an accepted document even if it clearly contains some weaknesses. Some of these have been corrected in the Plant Contract. In my opinion FIDIC should let users become more familiar with the Plant Contract as a follow up to the Orange Book.

Keywords