The 8th International Conference on Construction Engineering and Project Management
/
pp.41-49
/
2020
Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.
The 3th International Conference on Construction Engineering and Project Management
/
pp.440-448
/
2009
Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.
This paper deals with manufacturing process design of a simplified gun tube applying CE principle. A concept and characteristics of CE, mathematical model for understanding interaction between design and manufacturing, basic elements and related equations for process planning and cost estimating are introduced. A Knowledge-based Computer-Aided Process Planning System(KCAPPS) is constructed, yielding optimal production cost/time for the shape input and selection of appropriate machines and tools.
To ensure competitiveness in the modern automotive market, material arrangements and information managements should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflow and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete material arrangements for a whole general assembly system is a huge and complex job, several planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. Digital automotive general assembly factory is useful the performing concurrent and collaborative engineering and is essential for material arrangements and information managements systems. In this research, we constructed a sophisticated digital factory of an automotive general assembly shop by measuring and modeling through the parametric 3-D CAD, and a web-based system for concurrent and collaborative material arrangements for automotive general assembly via 3D mock-up is developed. By the digital general assembly shop and developed web-based system, savings in time and colt of manufacturing preparation activities are possible, and the reliability of the planning result Is greatly improved.
To ensure competitiveness in the modem automotive market, process and material planning should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflows and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete material planning for a whole general assembly system is a huge and complex job, several planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. In this research, a web-based system for concurrent and collaborative process and material planning for automotive general assembly via 3D digital mock-up S/W is developed. By using this system, savings in time and cost of process and material planning are possible, and the reliability of the planning result is improved.
The extent and depth of the event plan determines the scope of pedagogical experience in situations and consequently the quality of immersive learning based on our simulated world. In contrast to planning in conventional narrative-based systems mainly pursuing dramatic interests, planning in virtual world-based pedagogical systems strive to provide realistic experiences in immersed situations. Instead of story plot comprising predetermined situations, our inter-event planning method aims at simulating diverse situations that each involve multiple events coupled via their associated agents' conditions and meaningful associations between events occurring in a background world. The specific techniques to realize our planning method include, two-phase planning based on inter-event search and intra-event decomposition (down to the animated action level); autonomous and independent agents to behave proactively with their own belief and planning capability; full-blown background world to be used as the comprehensive stage for all events to occur in; coupling events via realistic association types including deontic associations as well as conventional causality; separation of agents from event roles; temporal scheduling; and parallel and concurrent event progression mechanism. Combining all these techniques, diverse exogenous events can be derived and seamlessly (i.e., semantically meaningfully) integrated with the original event to form a wide scope of situations providing chances of abundant pedagogical experiences. For effective implementation of plan execution, we devise an execution scheme based on multiple priority queues, particularly to realize concurrent progression of many simultaneous events to simulate its corresponding reality. Specific execution mechanisms include modeling an action in terms of its component motions, adjustability of priority for agent across different events, and concurrent and parallel execution method for multiple actions and its expansion for multiple events.
To ensure competitiveness in the modern automotive market, process planning should be performed concurrently with new car developments. In automotive general assembly shops, thus, new business workflows and supporting environments are inevitable to reduce the manufacturing preparation time in developing a new car in the manner of concurrent and collaborative engineering. Since complete process planning for a whole general assembly system is a huge and complex job, several process planners should execute their planning jobs and share information. Therefore, each planner should provide others with his/her results with continuous on-line communication and cooperation. In this research, a web-based system for concurrent and collaborative process planning for automotive general assembly is developed. By using this system, savings in time and cost of assembly process planning are possible, and the reliability of the planning result is improved.
This study describes process and method to establish concurrent and/or sequential schedule planning for the system design process of the EIA632 standard. For this purpose, the study suggest Process and method that are context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrent and/or sequential work flow. The proposed process and method will contribute to minimize time loss that is emerged from activities iteration.
Manufacturing companies should perform process planning and its evaluation concurrently with new product developments so that they can be highly competitive in the modern market. Process planners should make decisions in the manner of concurrent and collaborative engineering in order to reduce the manufacturing preparation time and cost when developing new products. Automated generation of analysis models from the integrated database, which contains process and material information, reduces time to prepare analyses and makes the models reliable. In this research, we developed a web-based system for concurrent and collaborative system for production flow analysis, using web, database, and simulation technology. An integrated database is designed to automatically generate analysis models from process and material plans without reworking the data. This system enables process planners to evaluate their decision fast and share their opinions with others easily. With this system, it is possible to save time and cost for assembly process and material planning, and reliability of process plans can be improved
The industrial environment for shipbuilding in 21st century requires increase in few type of ships and marine structures, international cooperation and globalization, while virtual enterprise environment is rapidly establishing. On the other hand, more and more efforts will be spent on internet based distributed and collaborative environment rather than being spent on unit level automations such as CAD, CAM and CAE, and the link between them. Recent internet technology and information technology in heterogeneous environment are being applied in shipbuilding industry as well as in other industries. While these technology are rapidly adopted in major shipyards, many small and medium-sized shipyards does not have enough resources to introduce system designed for large enterprise. In this paper, a prototype of Internet technology based basic planning system is implemented for the small and medium sized shipyards based on the internet technology and concurrent engineering concept. First, the system is designed from the user requirements. Then standardized development environment and tools are selected. These tools are used for defining and evaluating core application technologies for the system development. This can guarantee the survival of small and medium-sized shipyards in 21st century industrial environment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.