• Title/Summary/Keyword: Concrete floor slab

Search Result 174, Processing Time 0.028 seconds

A Study on the Development of Rolled Dry Floor Heating System for Improving Workability (현장 시공성 개선을 위한 롤타입 건식바닥난방시스템 개발)

  • Lee, Gyu-Dong;Kim, Jun-Ho;Jeong, Chang-Ho;Kim, Dong-Woo;Ogawa, Keiichiro
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.177-180
    • /
    • 2012
  • Korea residential housing generally use wet floor heating system 'Ondol' which consist of insulation cushioning, lightweight foamed concrete, hot water pipe and mortar on top of reinforced concrete slab. Wet floor heating system's installation process is too complicate and difficult to supervise field for continuing assurance quality. Also, this method has a huge impact on the progress of construction because it take a long time to cure finishing mortar and lightweight foamed concrete. Therefore, it is considered a disturbance factor of reduction of construction duration for enhancing competitiveness. In this study, we conducted an experiment about the radiant heat performance and temperature difference on upper panel of rolled dry floor heating systems which is jointly developed by Kolon global and Sumisho Metalex for remodeling housing, studio apartment and the urban-life housing.

  • PDF

Numerical assessment of post-tensioned slab-edge column connection systems with and without shear cap

  • Janghorban, Farshad;Hoseini, Abdollah
    • Computers and Concrete
    • /
    • v.22 no.1
    • /
    • pp.71-81
    • /
    • 2018
  • Introduction of prestressed concrete slabs based on post-tensioned (PT) method aids in constructing larger spans, more useful floor height, and reduces the total weight of the building. In the present paper, for the first time, simulation of 32 two-way PT slab-edge column connections is performed and verified by some existing experimental results which show good consistency. Finite element method is used to assess the performance of bonded and unbonded slab-column connections and the impact of different parameters on these connections. Parameters such as strand bonding conditions, presence or absence of a shear cap in the area of slab-column connection and the changes of concrete compressive strength are implied in the modeling. The results indicate that the addition of a shear cap increases the flexural capacity, further increases the shear strength and converts the failure mode of connections from shear rigidity to flexural ductility. Besides, the reduction of concrete compressive strength decreases the flexural capacity, further reduces the shear strength of connections and converts the failure mode of connections from flexural ductility to shear rigidity. Comparing the effect of high concrete compressive strengths versus the addition of a shear cap, shows that the latter increases the shear capacity more significantly.

Reduction Method for Floor Impact Noise on APT Remodeling (공동주택 리모델링 현장의 바닥충격음 저감대책)

  • Park, Cheol-Yong;Hong, Goo-Pyo;Lee, Jong-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.524-525
    • /
    • 2009
  • Heavy-weight impact noise(HN) is the most irritating noise in Korean apartment houses. It has been proclaimed standard floor system of 210mm thick slab with isolation material in the wall type structure. But this regulation is applied only new construction field and is not considered remodeling field. In general, the LN can be reduced by using isolation material but HN is known as relating with stiffness, strength & boundary condition of slab. Therefore it is difficulty in improving the HN on remodeling field. In this study, We conducted the reinforcement of concrete slab using C.F.S.(carbon fiber sheet), steel plate and steel beam after on-dol with isolation material on the remodeling field. As the test results, It appeared using C.F.S was no improved but using steel plate & steel beam were a little improved on HN.

  • PDF

Improvement In the Serviceability of Floor Slab of Remodeled Building and the Performance of Floor Impact Noise (리모델링 건축물의 바닥슬래브 사용성 및 바닥충격음 성능개선)

  • Lee, Byung-Kwon;Bae, Sang-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1243-1246
    • /
    • 2006
  • As remodeling market is growing and peoples' concern on health and well-being is getting high, there is a need to apply environmentally friendly approach to remodeling an apartment houses. But, in point of the impact noise concerned, the thickness of the concrete slab and the limited ceiling height of the remodelling houses are the main constraints to improve the impact noise performance. In order to investigate the effect of the impact noise isolation as structural treatments for the structural elements, heavy-weight impact noise and tapping noise were measured in an remodeling building. As a result, structural strengthening method by H-beam was successful to enhance the impact noise level at about 3 or 4 class by the sound classification system.

  • PDF

Floor Impact Noise Reduction Performance of Double-Floor System in Apartments (공동주택 이중바닥구조의 바닥충격음 저감성능)

  • Baek, Gil-Ok;Park, Hong-Gun;Mun, Dae-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.197-202
    • /
    • 2014
  • Floor Impact Noise is a structure-borne noise which is mainly caused by vibration of concrete slabs. The majority of previous studies have focused on investigating performance of absorbing sheets on the reduction of floor impact noise. But absorbing sheets do not efficiently reduce heavy-weight floor impact noise level because it cannot absorb slab vibration, which is the fundamental noise source. In this study, double-floor system was developed in order to reduce floor impact noise level in residual buildings. This floor system reduces heavy-weight impact noise level by reducing vibration response at the center of slab, which has maximum amplitude in the 1st vibration mode. In order to identify the performance of the double-floor system, experiments were planned. Primary test parameters are span of double floor, arrangement and types of absorbing sheets.

  • PDF

Strength Measurements of Slim Floor Composite Beams used Perforated Square Shape Steel Pipe (천공된 각형강관을 이용한 슬림플로어 합성보의 내력실험)

  • Kim, Dong-Yeon;Rhim, Hong-Chul;Park, Sung-Woon;Kim, Do-Kyun;Lyum, Seung-Il;Park, Dae-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.189-190
    • /
    • 2015
  • Slim Floor construction method has to increase the available surface area thereby reducing the depth beams and slab. In addition, In this study compostie beam assembly of plates, square-shape steel pipe and deck plate. So workabiltiy is superior to the upper concrete possible without formwork. In the present study is strength test in progress in development slim floor composite beam used plate and perforated square shape steel pipe and obtained anlysis and conclustion of the experimental results.

  • PDF

Flexural Capacity of the Encased(Slim Floor) Composite Beam with Deep Deck Plate (매입형(슬림플로어) 합성보의 휨성능 평가 -춤이 깊은 데크플레이트와 비대칭 H형강 철골보-)

  • Heo, Byung Wook;Bae, Kyu Woong;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.2 s.69
    • /
    • pp.235-245
    • /
    • 2004
  • The advantages of composite construction are now well understood in terms of structural economy, good performance in service, and ease of construction. However, these conventional composite construction systems have some problems in application to steel framed buildings due to their large depth. So, in this study we executed an experimental test with the "Slim Floor"system which could reduce the overall depth of composite beam. Slim Floor system is a method of steel frame multi-story building construction in which the structural depth of each floor is minimized by incorporating the steel floor beams within the depth of the concrete floor slab. Presented herein is an experimental study that focuses on the flexural behaviour of the partially connected slim floor system with asymmetric steel beams encased in composite concrete slabs. Eight full-scale specimens were constructed and tested in this study with different steel beam height, slab width, with or without shear connection and concrete topping thickness. Observations from experiments indicated that the degree of shear connection without additional shear connection was $0.53{\sim}0.95$ times that of the full shear connection due to inherent mechnical and chemical bond stress.

Experimental Verification on the Structural Performance of Reinforced Concrete Slabs Rigidly Connected by Steel Bar Injection (삽입철근을 사용한 강접합 철근콘크리트 슬래브의 구조 성능에 대한 실험 검증)

  • Kim Sang Sik;Choi Kwang Ho;Lee Jung-Yoon;Choi Ik Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.465-468
    • /
    • 2004
  • The first thing in remodelling of an apartment is the enlargement of living area, which is usually attained through extending balcony or corridor to the outside of the building. As a reasonable solution to the extension of floor a method of rigid connection in which steel bars are injected into the existing slab and concrete of newly building slab is installed with proper reinforcement is proposed in this research. To verify the structural performance of the method bending tests have been carried out for seven slab specimens.

  • PDF

Steady and Transient Solution of heat Conduction from hurried Pipes of panel heating Slab (상-파넬 히-팅의 해석법)

  • Lee Kun
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.3 no.3
    • /
    • pp.185-190
    • /
    • 1974
  • Floor panel heating system is popular in Korea as dwelling house heating system. There are two methods for keeping floor surface warm. One method is delivering warm air under the floor such as Roman Hypocaust and Korean traditional Ondol. The other method is imbedding hot water pipes into the concrete floor slab. This paper gives basic equations for steady and transient solutions of heat conduction from hurried pipes. For steady-state solution, fin Efficiency Method and Sink and Source Method were introduced. Sink and Source Method is applied to transient state and basic solution is given in the form of Exponential Integral Function. Numerical solutions can be solved easily by digital computer from these equations.

  • PDF