• Title/Summary/Keyword: Conceptual Estimation

Search Result 115, Processing Time 0.026 seconds

Conceptual Retrieval of Chinese Frequently Asked Healthcare Questions

  • Liu, Rey-Long;Lin, Shu-Ling
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.5 no.1
    • /
    • pp.49-68
    • /
    • 2015
  • Given a query (a health question), retrieval of relevant frequently asked questions (FAQs) is essential as the FAQs provide both reliable and readable information to healthcare consumers. The retrieval requires the estimation of the semantic similarity between the query and each FAQ. The similarity estimation is challenging as semantic structures of Chinese healthcare FAQs are quite different from those of the FAQs in other domains. In this paper, we propose a conceptual model for Chinese healthcare FAQs, and based on the conceptual model, present a technique ECA that estimates conceptual similarities between FAQs. Empirical evaluation shows that ECA can help various kinds of retrievers to rank relevant FAQs significantly higher. We also make ECA online to provide services for FAQ retrievers.

Wing weight estimation considering constraints of structural strength and stiffness in aircraft conceptual design

  • Bai, Chen;Mingqiang, Luo;Zhong, Shen;Zhe, Wu;Yiming, Man;Lei, Fang
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.15 no.4
    • /
    • pp.383-395
    • /
    • 2014
  • According to the requirement of wing weight estimation and frequent adjustments during aircraft conceptual design, a wing weight estimation method considering the constraints of structural strength and stiffness is proposed to help designers make wing weight estimations rapidly and accurately. This method implements weight predictions on the basis of structure weight optimization with stiffness constraints and strength constraints, which include achievement of wing shape parametric modeling, rapid structure layout, finite element (FE) model automated generation, load calculation, structure analysis, weight optimization, and weight computed based on modeling. A software tool is developed with this wing weight estimation method. This software can realize the whole process of wing weight estimation with the method and the workload of wing weight estimation is reduced because much of the work can be completed by the software. Finally, an example is given to illustrate that this weight estimation method is effective.

Further Improvement in Rotor Aerodynamics Estimation in Helicopter Conceptual Design and Optimization Framework for a Compound Rotorcraft

  • Lim, JaeHoon;Shin, SangJoon;Kee, YoungJung
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.18 no.4
    • /
    • pp.641-650
    • /
    • 2017
  • In order to include the design capability for a compound rotorcraft in a helicopter conceptual design and optimization framework, relevant further improvement was planned and conducted. Previously, a certain conceptual design optimization framework was developed by the present authors to design a modern rotorcraft with single main and tail rotor. The previously developed framework was further improved to expand its capability for a compound rotorcraft. Specifically, its power estimation algorithm was upgraded by using a comprehensive rotorcraft analysis program, CAMRAD II. The presently improved conceptual design and optimization framework was validated using data of the XH-59A aircraft.

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

A simplified algorithm for conceptual estimation of the material quantities of rubble-mound breakwaters

  • Sadeghi, Kabir;Nouban, Fatemeh
    • Ocean Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.111-129
    • /
    • 2020
  • A simplified algorithm is proposed for fast estimation of the material quantities required for the construction of rubble-mound breakwaters. The proposed algorithm is able to employ only the data available at feasibility study phase such as the maximum draught of the design ship selected to transport the cargos to the harbor despite, because at the feasibility phase, information for the planned harbor is likely to be very limited. A linear-constant waterdepth model together with a proposed section configuration for the breakwaters, which is customary for harbors, is considered to calculate the quantity of materials. The numerical simulation of the wave characteristics has been verified using the recorded wave data collected by a buoy installed near the Neka harbor in Caspian Sea waters. A case study has been also applied to four harbors to validate the proposed algorithm. The estimated weights using the proposed linear-constant and multi-linear waterdepth models were compared using the bathymetry maps and layouts of these harbors. A computer program, written in QBasic language, has been developed to simulate the wave characteristics and to estimate the material quantities needed to construct a rubble-mound breakwater. The obtained results show that taking into account the acceptable accuracies normally applied to the feasibility study and conceptual design phases, the proposed algorithm is sufficiently accurate and highly effective for the conceptual estimation of materials' quantities of breakwaters in the feasibility study phase of harbor projects.

Conceptual Design of G/T25,000 Class Cruise Ship for Domestic Coastal Voyage in Korea (국내 연안항해용 25,000톤급 크루즈선의 개념 설계)

  • 김동준;진송한;최경식;현범수
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.3
    • /
    • pp.65-71
    • /
    • 2002
  • From the definition of the cruise ship mission based on the investigation of the customer needs and statistical estimates and to design of the residence area of the cruise ship, in this study a conceptual design of the traditional ship parts (the lower hull) was carried out. for the light weight estimation of the cruise ship, several methods that have been used for commercial ships were evaluated to adapt for the cruise ship, the main particulars of the ship were determined with the light weight estimation and the assumed dead weight. From these main particulars of the ship, the hull form was developed with CFD verification and the general arrangement for the lower hull was achieved. For several loading conditions the intact stability of ship was checked.

A Study on the Total Drag Estimation for the Aircraft Conceptual Design (항공기 개념설계를 위한 전체항력 예측에 관한 연구)

  • 김상진;전권수;이재우
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.70-82
    • /
    • 1999
  • During the aircraft conceptual design stage, rapid aerodynamic analyses over various configurations are required. Hence, empirical and analytical methods play important roles in predicting the aero-dynamic characteristics. In this study, total drag estimation method based on empirical and analytical approaches is developed. By comparing with the results of the wind tunnel experiment and existing prediction methods, it is demonstrated that the developed method is accurate and useful in predicting total drag for the whole Mach number range.

  • PDF

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF