• Title/Summary/Keyword: Computation problem

Search Result 1,290, Processing Time 0.028 seconds

The Development of Algorithm Method for 0-1 Knapsack Problem (0 - 1 배낭문제의 Algorithm 개발에 관한 연구)

  • 신현재
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.7 no.10
    • /
    • pp.29-33
    • /
    • 1984
  • Many methods have been developed to get a good Computation steps. I think that almost methods of them have been solved by using a theory of [Vj]. But I have thought that it Can be solved by an other method. This method is a way to get a Computations steps by using [Aj] instead of [Vj]. It requires less Computation time than [Vj]. So I think that method is an efficient Algorithm about "the Development of Algorithm method for the 0 - 1 Knapsack problem."

  • PDF

Evaluations of Representations for the Derivative of Rational $B\{e}zier$ Curve (유리 $B\{e}zier$ 곡선의 미분계산방법의 평가)

  • 김덕수;장태범
    • Korean Journal of Computational Design and Engineering
    • /
    • v.4 no.4
    • /
    • pp.350-354
    • /
    • 1999
  • The problem of the computation of derivatives arises in various applications of rational Bezier curves. These applications sometimes require the computation of derivative on numerous points. Therefore, many researches have dealt with the representation for the computation of derivatives with the small computation error. This paper compares the performances of the representations for the derivative of rational Bezier curves in the performances. The performance is measured as computation requirements at the pre-processing stage and at the computation stage based on the theoretical derivation of computational bound as well as the experimental verification. Based on this measurement, this paper discusses which representation is preferable in different situations.

  • PDF

Boltzmann machine using Stochastic Computation (확률 연산을 이용한 볼츠만 머신)

  • 이일완;채수익
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.31A no.6
    • /
    • pp.159-168
    • /
    • 1994
  • Stochastic computation is adopted to reduce the silicon area of the multipliers in implementing neural network in VLSI. In addition to this advantage, the stochastic computation has inherent random errors which is required for implementing Boltzmann machine. This random noise is useful for the simulated annealing which is employed to achieve the global minimum for the Boltzmann Machine. In this paper, we propose a method to implement the Boltzmann machine with stochastic computation and discuss the addition problem in stochastic computation and its simulated annealing in detail. According to this analysis Boltzmann machine using stochastic computation is suitable for the pattern recognition/completion problems. We have verified these results through the simulations for XOR, full adder and digit recognition problems, which are typical of the pattern recognition/completion problems.

  • PDF

Algorithm for Efficient D-Class Computation (효율적인 D-클래스 계산을 위한 알고리즘)

  • Han, Jae-Il
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.151-158
    • /
    • 2007
  • D-class computation requires multiplication of three Boolean matrices for each of all possible triples of $n{\times}n$ Boolean matrices and search for equivalent $n{\times}n$ Boolean matrices according to a specific equivalence relation. It is easy to see that even multiplying all $n{\times}n$ Boolean matrices with themselves shows exponential time complexity and D-Class computation was left an unsolved problem due to its computational complexity. The vector-based multiplication theory shows that the multiplication of three Boolean matrices for each of all possible triples of $n{\times}n$ Boolean matrices can be done much more efficiently. However, D-Class computation requires computation of equivalent classes in addition to the efficient multiplication. The paper discusses a theory and an algorithm for efficient D-class computation, and shows execution results of the algorithm.

Certificate-Based Encryption Scheme without Pairing

  • Yao, Ji;Li, Jiguo;Zhang, Yichen
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.6
    • /
    • pp.1480-1491
    • /
    • 2013
  • Certificate-based cryptography is a new cryptographic primitive which eliminates the necessity of certificates in the traditional public key cryptography and simultaneously overcomes the inherent key escrow problem suffered in identity-based cryptography. However, to the best of our knowledge, all existed constructions of certificate-based encryption so far have to be based on the bilinear pairings. The pairing calculation is perceived to be expensive compared with normal operations such as modular exponentiations in finite fields. The costly pairing computation prevents it from wide application, especially for the computation limited wireless sensor networks. In order to improve efficiency, we propose a new certificate-based encryption scheme that does not depend on the pairing computation. Based on the decision Diffie-Hellman problem assumption, the scheme's security is proved to be against the chosen ciphertext attack in the random oracle. Performance comparisons show that our scheme outperforms the existing schemes.

COMPARISON OF NUMERICAL SCHEMES ON MULTI-DIMENSIONAL BLACK-SCHOLES EQUATIONS

  • Jo, Joonglee;Kim, Yongsik
    • Bulletin of the Korean Mathematical Society
    • /
    • v.50 no.6
    • /
    • pp.2035-2051
    • /
    • 2013
  • In this paper, we study numerical schemes for solving multi-dimensional option pricing problem. We compare the direct solving method and the Operator Splitting Method(OSM) by using finite difference approximations. By varying parameters of the Black-Scholes equations for the maximum on the call option problem, we observed that there is no significant difference between the two methods on the convergence criterion except a huge difference in computation cost. Therefore, the two methods are compatible in practice and one can improve the time efficiency by combining the OSM with parallel computation technique. We show numerical examples including the Equity-Linked Security(ELS) pricing based on either two assets or three assets by using the OSM with the Monte-Carlo Simulation as the benchmark.

Automated Control Gain Determination Using PSO/SQP Algorithm (PSO/SQP를 이용한 제어기 이득 자동 추출)

  • Lee, Jang-Ho;Ryu, Hyeok;Min, Byoung-Moom
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.61-67
    • /
    • 2008
  • To design flight control law of an unmanned aerial vehicle, automated control gain determination program was developed. The procedure for determination of control gain was formulated as the control gains were designed from the optimal solutions of the optimization problem. PSO algorithm, which is one of the evolutionary computation method, and SQP algorithm, which is one of the nonlinear programming method, are used as optimization problem solver. Thru this technique, computation time required for finding the optimal solution is decreased to 1/5 of that of PSO algorithm and more accurate optimal solution is obtained.

  • PDF

Current Trend and Direction of Deep Learning Method to Railroad Defect Detection and Inspection

  • Han, Seokmin
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.14 no.3
    • /
    • pp.149-154
    • /
    • 2022
  • In recent years, the application of deep learning method to computer vision has shown to achieve great performances. Thus, many research projects have also applied deep learning technology to railroad defect detection. In this paper, we have reviewed the researches that applied computer vision based deep learning method to railroad defect detection and inspection, and have discussed the current trend and the direction of those researches. Many research projects were targeted to operate automatically without visual inspection of human and to work in real-time. Therefore, methods to speed up the computation were also investigated. The reduction of the number of learning parameters was considered important to improve computation efficiency. In addition to computation speed issue, the problem of annotation was also discussed in some research projects. To alleviate the problem of time consuming annotation, some kinds of automatic segmentation of the railroad defect or self-supervised methods have been suggested.

Optimal O/D Sample Size Computation using link Volume Estimates (구간 교통량의 표준오차를 이용한 최적 O/D 표본수 산출)

  • 윤성순;김원규
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.75-84
    • /
    • 1994
  • In this paper we address the issue of how an optimal sample size computation relates the level of precision required for travel demand estimations and transportation planning. We approach the problem by 1) deriving a theoretical solution, 2) developing a computational procedure (algorithm) to implement the theoretical solution, and 3) demonstrating a practical application. Ultimately, we construct a formal scheme of optimal sample size computation for use in travel data collection processe.

  • PDF

Computation-Communication Overlapping in AES-CCM Using Thread-Level Parallelism on a Multi-Core Processor (멀티코어 프로세서의 쓰레드-수준 병렬성을 활용한 AES-CCM 계산-통신 중첩화)

  • Lee, Eun-Ji;Lee, Sung-Ju;Chung, Yong-Wha;Lee, Myung-Ho;Min, Byoung-Ki
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.16 no.8
    • /
    • pp.863-867
    • /
    • 2010
  • Multi-core processors are becoming increasingly popular. As they are widely adopted in embedded systems as well as desktop PC's, many multimedia applications are being parallelized on multi-core platforms. However, it is difficult to parallelize applications with inherent data dependencies such as encryption algorithms for multimedia data. In order to overcome this limit, we propose a technique to overlap computation and communication using an otherwise idle core in this paper. In particular, we interpret the problem of multimedia computation and communication as a pipeline design problem at the application program level, and derive an optimal number of stages in the pipeline.