• Title/Summary/Keyword: Complex Construction Method

Search Result 588, Processing Time 0.028 seconds

Realization of Point-Listening Characteristics by Enclosed Microphone Array System with Optimal Complex Weighting

  • Ohyama, Shinji;Sasagawa, Yukifumi;Cao, Li;Kobayashi, Akira
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.266-269
    • /
    • 1999
  • An electronically Scannable microphone system is in the Planning stage. For this Purpose, a multiple microphone array with controllable delay is available. To achieve effective point-listening characteristics, we proposed an enclosed microphone array system with a complex weighting method. In this system, both the microphone arrangement and the value of the complex weighting are important. In this report, the construction of microphone array system and the signal-processing method are explained, and the calculation method for optimal complex weighting is also presented. A prototype experimental setup is designed and fabricated to verify the expected characteristics.

  • PDF

Study on Improvement of Air Quality through Analysis of Ventilation Efficiency in Complex Enclosures of a Ship (선박 복합 밀폐공간 내 환기효율 분석을 통한 공기환경 개선에 관한 연구)

  • Jeong, Jae-Hoon;Song, Doosam
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.8
    • /
    • pp.440-447
    • /
    • 2015
  • In the shipbuilding process, the confined work spaces of the ship are formed continuously; the ventilation method can therefore be limited to dilution ventilation due to the complex structure and limited opening of the confined space. Also, it is difficult to evaluate air-quality using measurement and an adequate ventilation method. CFD simulation methods are typically used in analyzing ventilation efficiency in these cases. In this study, a method is suggested to analyze the air quality of the complex enclosures in shipbuilding using CFD. Especially, among the conventional indices, the ventilation efficiency scales or indices, the supply air contribution (SVE4), and the age of the air (SVE3) (fit for the confined and complex enclosure) were applied.

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

A study on the improvement for performance of floor finishing materials using poly urethane with water reacting urethane (수반응 우레탄과 바닥용 경질 폴리우레탄을 이용한 바닥마감재의 성능향상에 관한 실험적 연구)

  • Park Jin-Sang;Kang Hyo-Jin;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.43-46
    • /
    • 2006
  • In this study on the appliable Asphalt sheet of monolithic and inorganic matter waterproofing material using of field because of problem of complex waterproofing sheet. Before this cement polymer modified waterproof coating and appliable asphalt sheet of monolithic whether have stability by method of construction about all style waterproofing that evaluate to new method of construction development naturally big emphasis put and try to approach. Did performance test item first at, as a result, drew by suitable thing in all KS items. This is considered to have more effective spot construction work because if means that have stability by material as well as method of construction.

  • PDF

Improvement Plan for Connecting Form of PC Member -Focused on Apartment Buildings- (PC부재의 접합부 거푸집의 개선방안 연구 -공동주택을 중심으로-)

  • Kim, Seon-Hyung;Choi, Jae-Hwi;Kim, Sun-Kuk;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.9-12
    • /
    • 2010
  • Conventional apartment building projects have favored wall slab structure for the ease of construction and economic viability. However, wall slab structure, consisting of bearing walls, makes remodeling a difficult challenge. In addition, as the amendment to the Building Act in November, 2005 incentivized easy-to-remodel Rahmen structure design for apartment building in terms of floor area ratio and the number of stories, were are seeing more use of PC construct method in apartment building projects gradually. However, PC construction method requires complex connections between beams and columns, making it difficult to install and remove formwork. Furthermore, it is not possible to reuse forms after removal, generating lots of construction wastes, and it is necessary to install new forms again when the size of connection changes in line with modification of column cross-section. Researchers in Korea and elsewhere in the world have focused on structural performance of connection in PC construction method, with little attention to alternative approaches to improving connection forms for PC construction method. Accordingly, this research aims to study an approach to improving connection forms for PC construction method.

  • PDF

Study to Suggest Improvement Method for Increasing Efficiency of Multi-complex Design Work (복합단지 설계 업무의 효율성 향상을 위한 개선방안 연구)

  • Koo, Ja Kyung;Park, Eun Soo;Jun, Young Joon;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.505-512
    • /
    • 2008
  • Over the past years, complex project which has the object to accomplish housing complex, commercial complex etc, recently is changing to multi-complex projects because of development in IT sector. Improvement in the quality of life, life pattern has been and is being changed, these modernized and improved version of life brings the concept of U-city. Department of urban planning and engineering, civil engineering and architecture engineering in every university educate students according to the changing world in order to handle these complex projects in real world. In most cases department of urban planning and engineering teach project planning and department of civil and architecture engineering teach project design and construction. In most of the projects planning followed by design and construction need to be accomplished, but current observation in the present curriculum shows that it is difficult to expect the continuity. The present curriculum of civil engineering has to change as complex projects deal with various different structures during the design and construction phase of these projects. This study examined curriculums from the department of urban and civil engineering related to structural design and construction and survey importance of design works which overlap urban and civil engineering targeted on design engineers. After understanding design works and results obtained from survey we propose for an advanced efficiency method.

Review of Freeform Buildings using the Digital Fabrication (디지털 패브리케이션을 활용한 비정형 건축물의 시공공법 고찰)

  • Kim, Sung-Jin;Park, Young-Mi;Park, Sung-Jin;Park, Ki-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.175-176
    • /
    • 2015
  • Starting from Guggenheim Bilbao Museum in 1997, it has been increased steadily that complex geometry buildings using digital designs and construction process. Since 2010, the domestic Freeform design has been widely used for buildings such as Dongdaemoon Design Plaza, Seoul City Hall, Tri-Bowl, and etc. But there are many defects such as the increased cost and period of construction, and the declined quality of construction because of the lack of optimized method and engineering experiences. Therefore, this study has an effort to review case study of the recent freeform buildings and construction methods using digital fabrications. And this study proposed the improve method for the construction quality for freeform buildings.

  • PDF