• 제목/요약/키워드: Complex Construction Method

검색결과 586건 처리시간 0.03초

삼척발전단지 건설계획에 따른 철도수송력 강화 방안 연구 (A Study on Rail Transport Method by the Construction Plan of Samcheok Electric Power Complex)

  • 조지현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1327-1334
    • /
    • 2009
  • According to the construction plan of Samcheok electric power complex from year 2009 to year 2020, many people are interested in this area. This national project which invests about 8.6 trillion won will have great influence to rail transport considering current depression days. Samcheok electric power complex will be the largest plan in Korea, and it is necessary to have railroad construction plan as soon as possible considering the route change of domestic coal transport and the possibility of coal transport by rail from North Korea, Russia and China after reunification of Korean peninsula. Also, Samcheok electric power complex will be located in the east area railroad route and it is important to study about this area. This study will mention about the railroad route of east sea north line and Pohang $\sim$ Samcheok line, and review the prospect and strengthening method of coal transport by railroad according to the construction of Samcheok electric power complex.

  • PDF

고주파 접착기를 사용한 복합석재판의 콘크리트 벽체 부착 시공 (The Construction Method which attached Complex Stone Panel to Concrete Wall using High-Frequency Holt-Melt Machine)

  • 오창원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.45-49
    • /
    • 2010
  • The contamination(stain phenomenon) of natural marble(sipeol, bianko) of art wall of on-site interior finishing system and wall of elevator hall has occurred. The bottom of the art wall of stone junction tile has defects as cracks. To solve these problems, our research team developed eco-friendly complex stone panel(stone 4T + cement board 6T) and high-frequency hot-melt construction method that can construct in winter.

  • PDF

The coupling of complex variable-reproducing kernel particle method and finite element method for two-dimensional potential problems

  • Chen, Li;Liew, K.M.;Cheng, Yumin
    • Interaction and multiscale mechanics
    • /
    • 제3권3호
    • /
    • pp.277-298
    • /
    • 2010
  • The complex variable reproducing kernel particle method (CVRKPM) and the FEM are coupled in this paper to analyze the two-dimensional potential problems. The coupled method not only conveniently imposes the essential boundary conditions, but also exploits the advantages of the individual methods while avoiding their disadvantages, resulting in improved computational efficiency. A hybrid approximation function is applied to combine the CVRKPM with the FEM. Formulations of the coupled method are presented in detail. Three numerical examples of the two-dimensional potential problems are presented to demonstrate the effectiveness of the new method.

초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 - (The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project -)

  • 박희도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

대심도 해저 쉴드터널 안전시공을 위한 계측관리 (Monitoring management for safely construction of deep shield tunnel)

  • 유길환;김영수;황대영;곽정민;정성교
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.319-326
    • /
    • 2002
  • During the construction period of submarine shield tunnel, which is built firstly in very soft marine clay layer 40m deep in Korea, wide range problems were encountered such as safe launching against high earth pressure at shield entrance, technique of shield face pressure control when passing through complex multi-layered soils This paper introduces successful construction practice through development of state-of-the-art construction method and field monitoring.

  • PDF

접합부 수밀성 향상 시트를 이용한 복합방수 공법에 관한 연구 (A Study on complex waterproofing Method Using Part of Joint Watertightness Improved Sheet)

  • 서우일;김수련;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.1-6
    • /
    • 2004
  • We ensure a flat and regular basic surface by using part of joint waterproofing improved sheet method applying the upper slab of a concrete structure. We solve the problem of getting loose scale the general sheet by waterproofing of the sheet and improving adhesive strength of the basic concrete. Also, waterproofing sheet union to problem of joint have solved using of insertion type method so that, it improved a watertightness. It has improved in resist impact, resist abrasion and it is the effect of shortened construction period and cutting down on construction expenses. Here are the special quality and superiority of this waterproofing research. (1) Level material has the super adhesive strength so that it makes the basic surface without the gab of waterproofing sheet and waterproofing layer with the string adhesive strength. (2) We unite the sheet with the joining part between sheets by waterproofing sheet joint using of method. (3) There is the effect of shortened construction period and cutting down on construction expenses without waterproofing of protection.

  • PDF

가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area)

  • 박창욱;문승윤;윤석현
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구 (Subcontractor Evaluation Model for construction Industry Using AHP)

  • 김성수;이영훈
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF

지하 콘크리트 구조물의 거동에 대한 방수층의 대응성 평가에 관한 실험적 연구 (Performance Test Method on the Influence Waterproofing as Behavior of Concrete Structure)

  • 노종수;권시원;곽규성;권기주;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.77-81
    • /
    • 2004
  • The massive structures are not free to move with vibration, differential settlement, thermal stresses because, construction and expansion joint, crack etc., can be large enough to cause leakage as deformation of waterproofing. It has been depended on the test method of tensile/tear strength which is waterproofing performance as behavior of concrete structure crack. However, not to practically confirm the creep applied to concrete surface, even waterproofing membrane have more performance than definite strength and elasticity. Therefore, in this study will focus on the test method to consider a resistance performance about loose adhesion and deformation of waterproofing and behavior of concrete structure as construction/expansion joint, crack. Performance test method on the influence as behavior of concrete structure crack is to choose waterproofing materials and construction method which possible to confront with behavior of 50mm crack in the atmosphere and low temperature. Examine the deformation of waterproofing membrane and loose adhesion which can occur to structure in general job site, suggest standard testing method to analyze correlation waterproofing membrane and structure with 5-types of materials used in this study, such as Adhesion membrane and sheet complex, sheet and urethane complex, self-adhesive sheet, spray poly-urea, spray membrane of rubberized Asphalt.

  • PDF

돌기 시스템을 이용한 입체보강형시트의 옥상노출복합방수공법 적용에 관한 재료 및 공법적 연구 (Study on the Application of Site for Exposure Type of Complex Waterproofing Method with Liquefied Waterproof using of Vertical Type Reinforcing Sheet Material Reinforced Sheet Rising System in the Roof Tops)

  • 오상근;손문세;김진성;여인수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.17-20
    • /
    • 2006
  • It often happen water leakage that roof membrane have a poor condition such as direct exposed to rain, ultraviolet lays, temperature change compare with other part of waterproofing. There are difficult to maintain the quality of waterproofing and durability due to use only few waterproofing materials in practical in spite of development and use the various waterproofing material as solution of these poor condition. Therefore, in this thesis, I would like to know the property to apply field and suggest other method to develop for this waterproofing method to adopt various field condition for roof tops, as searching exposed and complex waterproofing technology for roof tops which is reinforced sheet using rising system have a regular pitch, depth, space.

  • PDF