This study explains about a phenomenon where the structure of the compensation plan for a single salesperson may vary as he/she gains experience. Unlike past studies that implicitly assume the limited effect on salesperson's experience, our result predicts that a salesperson will make an effort at every period early in his/her career without any commissions in order to gain experience. However, if one cannot expect any marginal returns of accumulated efforts, the sales manager must provide commissions on the high volume of sales at each period, to facilitate a high effort of a salesforce at earlier periods. Our paper provides important implications about dynamics in the compensation plan, which has not been addressed in the past studies but has frequently been witnessed in practice.
This study tried to suggest a systematic improvement plan to prepare a civil safety insurance operation and management system by reviewing the operation and management status of civil safety insurance, which is operated and managed by each local government autonomously. In this study, the problems of the current civil safety insurance were analyzed by dividing them into the lack of systematic management of insurance items, overlapping coverage between insurance items, and deviations in compensation limits. As a systematic improvement plan, it was suggested to secure the systemic management of guarantee items, standardize compensation standards, prepare an integrated operation and management system, and provide financial support for local governments with poor financial independence. Since the problems and improvement plans for the civil safety insurance analyzed as described above are formed by exchanging and receiving a complex mutual influence, the institutional improvement plan for the operation and management system of the civil safety insurance is not only a specific part of the study, but also comprehensively current citizens. Based on the results derived from the analysis of safety insurance, it is concluded that alternatives must be found.
Journal of Korean Society of Industrial and Systems Engineering
/
v.41
no.4
/
pp.196-202
/
2018
There have been more than 40,000 cases of fires in Korea in the last three years. However, as 'Accidental Fire Liability Act' was judged to be non-conform to the Constitution in 2007, the damages by light mistakes should be compensated. Accordingly, disputes such as compensation claims, litigations and indemnification cases of the victims of fire increased. However, it is so difficult for victims of fire cases to take proper action. So, this study is to help victims of fire cases in the disputes and compensation claims of the victims, and to find actual and practical support system based on the analysis of compensation status. To help victims of fire cases, we need to survey about victims of fire cases with multiple victims. That survey is analyzed to find support plan for victims. Furthermore, to find support plan the current law is needed to be analyzed and reviewed to revision. It is also tried to identify problems in the operation of the Center for victims of Fire currently operated by fire stations and to find countermeasures. In addition, the status of subscription and problem of fire insurance for the compensation for the victims and the method to increase fire insurance subscription rate will be studied.
In this study, we collected and analyzed the current status of licenses for the limited fishery business and divided the problems related to licenses for the limited fishery business into partial damage compensation and cancellation compensation areas. In the case of partial damage compensation areas due to existing public water use projects, it is suggested that the issuance of licenses for limited fishery businesses should be reconsidered. In the case of cancellation compensation areas, it is recommended that the disposition of communal fishery businesses that do not require capital investment should be the principle. If capital such as facilities are invested, compensation should be made by Article 52 of the Enforcement Decree of the Land Compensation Act if the licenses for limited fishery business are closed due to other development projects. In addition, we proposed an improvement plan to establish a rational management system for licenses for limited fishery businesses. In addition to these improvement measures, we hope that further investigation and research on licenses for limited fishery business, which have been insufficient so far, will be conducted to promote the comprehensive use of fisheries resources and waters and the sustainable development of fisheries that are the objectives of the Fisheries Act, and contribute to the improvement of the quality of life of the people and the balanced development of the national economy.
The purpose of this study is to investigate the effects of extrinsic and intrinsic compensation on organizational commitment. It is also analyzed whether the compensation selection may play a moderating role between the types of compensation and organizational commitment. A total of 295 questionnaires from 12 Chinese companies are used for data analysis. The empirical results show that the types of compensation have a positive effect on organizational commitment. It is found a moderating effect of compensation selection only between extrinsic compensation and organizational commitment. The results reveal that more focus on external compensation and adopting a flexible benefit plan are necessary to improve organizational commitment.
Jeju coastal landscape has been changed from 1980's. Construction of coastal road, rearing fm, restaurant and condominium are main reasons of destroying the Jeju coastal area. Recently, the law for preserving coastal landscape is effective to prevent diverse construction activities, the land is comparatively restricted in the coastal landscape preservation districts. The resident's attitude toward restricted landlord has been carried out in Jeju province and compensation program has been developed for landlord in the coastal landscape preservation district. To speak compensation programs, First, land compensation as if cash compensation and right of purchase claim, Second, incentive as if tax reducement or regional support, Third, assignment of development right.
Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.
Fishing losses require a practical rather than an academic theoretical approach. As of the end of 2023, in accordance with the construction plan for the Gadeokdo New Airport, we are in a situation where we must realistically deal with losses not only to land and other obstacles in the area, but also to the fishing industry. However, in order for such compensation to be properly made, the legal realization procedures, ranging from the Land Compensation Act a general law, to the Fisheries Act, a special law, and even the Gadeokdo New Airport Special Act, must be identified and practically implemented. We will look into special cases in a special way and ultimately make efforts to resolve social conflicts in advance, and then, if unavoidable, take care to ensure that appropriate compensation for losses is provided in spite of ex-ante and ex-post rights relief. We would like to present a feasible plan. Going further from the concept and implementation method of compensation so far, shares of so-called 'post-asset' are distributed to fishermen so that other benefits can be provided to fishermen for the development of nearby areas at the same time as the construction of Gadeokdo New Airport. Effective plans will also have to be devised. In order to execute above targets, research and implementation concerning the compensation should be conducted according to the following procedures: 1) Resident and Status survey, 2) Reviewing measures for preparing a resettlement area and land for their livelihoods, 3) Selecting the candidate site for the resettlement area and land, 4) Establishment of Basic concept, and 5) Feasibility review.
This study explores the outcome of the current Land Compensation Act for the indigenous residents of DAEIM Public Development Project Zone in Gyeongsan City. The purpose of the law is to return part of the development gains to the native residents and to support the re-settlement of the native residents. As the Land Compensation Act applies to each area with different standards, the monetary terms of land compensation which the native residents eventually receive varies across the region and development sites. That means the development gain is not fairly shared with the native residents of the redevelopment area and it does not necessarily support the settlement of the existing residents. It is supposed that the actual compensation for the native residents should be in full cash value but it is not in reality. The study demonstrates the outcomes of the land compensation that the residents received are far from the original purpose of the Compensation Act using the case example of DAEIM Public Development Zone in Gyeongsan, Gyeongsangbukdo. Only a small proportion of the natives managed to achieve the development gains. Accordingly the majority of the native residents has lost re-settlement opportunity. It suggests that the Compensation Act and the implementation procedure should be reviewed and revised accordingly. The details of compensation plan should be tested and set up in line with the characteristics of the project area. In particular, the compensation details in terms of the size and types of land, average value of land for indigenous residents receive, and the amount of compensation per household should be clearly demonstrated to the resident.
Kim, Jong-Hwa;Choi, Young-Sung;Han, Seong-Min;Lee, Duck-Jae
Proceedings of the KIEE Conference
/
2008.07a
/
pp.34-35
/
2008
KEPCO conducted a third project in Myanmar regarding system operation and protection scheme. This paper deals with blackout reduction plan, reactive power compensation plan and system restoration procedures in operations parts. Moreover protection system improvement plan and standard protection schemes were suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.