Korean Journal of Construction Engineering and Management
/
v.21
no.4
/
pp.21-29
/
2020
This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.
Journal of the Korea Society of Computer and Information
/
v.25
no.6
/
pp.231-237
/
2020
The purpose of this study is to present theoretical and policy implications based on the results of the empirical analysis of job stress in consideration of insufficient prior research on the level of job stress by public officials in charge of social welfare and public officials in general administration. For this purpose, social welfare and general administrative positions working at the City Hall of G Metropolitan City and five autonomous districts(including the Dong community service center) were selected as subjects for research. The data analysis used the SPSS statistical program to obtain technical statistics based on the average of the lower variables of the job stress. According to the analysis, there is a difference in the subjective perception level of public officials in charge of social welfare and public officials in general administration in both internal factors of job, such as job demands and job autonomy and external factors of job, such as job insecurity, organizational system, conflict of relations, inadequate compensation, and job culture. Based on this, it presented policy measures that require the granting of self-esteem of public officials in charge of social welfare, improvement of their duties, and adjustment of their workload to an appropriate level.
The Cadastral Renovation is a National project to investigate and survey the registration of Cadastral Record and replace the existing Cadastral Record with a new Cadastral Record by digital, and to correct the registration of Cadastral Record if the registration of Cadastral Record does not match the actual status of the land. The Business Period generally takes about one year and six months to two years. The time required is getting longer due to problems that occur in the course of the Adjustment amount after the cadastral resurvey survey due to complex structure and internal conflict due to the interest between landowners. After Boundary Decision of the real boundary, the land area is confirmed by the landowners, and the cadastral office is to settle the Cadastral Renovation by calculating the Adjustment amount according to the confirmed area and the increase and decrease of the cadastral area. Therefore, the solution plan was suggested so that reasonable Adjustment amount can be applied through empirical research applied to the time of calculation of Adjustment amount and the method of calculation of Adjustment amount. The improvement method showed the expected effect that can lead the agreement with the landowner to the shortest period, and it was also possible to set the real boundary that meets the purpose of the Cadastral Renovation. This study suggests improvements in the method of calculating standard Adjustment amount, the method of imposing Adjustment amount, and the method of boundary adjustment that does not impose adjustment amount through the cadastral Renovation and parallel studies, and it is expected that the Cadastral Renovation will be completed by 2030.
This study analyzes how workers become impoverished and have their jobs less stabilized after they suffer from non-job-related sickness. Given that South Korea lacks sickness benefits, which most of OECD member states legislate and implement except US and Switzerland, this study examines its impact on laborers' job stability and povertization in Korea. The researchers have conducted in-depth interviews with nine former or present laborers who have the experiences and four experts on the issue in July-September, 2017 for the qualitative analysis. It is found that laborers, after becoming aware of their sickness, at first endure their pain without informing their employers not to lose their jobs. The attititude is observed especially among non-standard laborers, because sickness more often leads to job loss for them than for standard laborers. After workers have to leave their jobs due to their sickness in the end, they have no choice but to keep working in less stable jobs to compensate for income losses. They become gradually impoverished with their social capital like family bond declining. We observe laborers who are eligible for industrial accident insurance compensation could not benefit from the system because some employers refrain from the legal reporting duty. Due to this illegal practices, some industrial accident victims unduly lose their jobs due to "non-job-related sickness". Second, some employers report to the authority that their sick laborers have left their jobs 'voluntarily' even when they have quitted it without their volition, in which case the newly unemployed are not eligible for unemployment benefits. Large holes in Korea's safety nets for those suffering from multiple risks of sickness and unemployment.
Even though there have been so much practical interests in industry, the relevant empirical researches are not sufficient. In this study, we try to identify the problems of matrix organization structure in the semiconductor industry and make suggestions for improvements. Also, we try to find out whether there are differences in the perceptions of the problems among ranks and teams. This study was conducted to the researchers in the matrix organization structure of the H-corp. research institute. The problems we found are as follows. The researchers agreed that the matrix organization structure is appropriate when highly professional members for the development of next-generation semiconductors are participated in the projects. They showed strong wills to participate and succeed in projects. However, the researchers felt that the equipments and manpowers were not enough and too much tasks and workloads were assigned to both the managers and members Also, in an open ended question, the researchers pointed out the problems of the matrix organization structure such as 'weak project manager's authority', 'communication and teamwork issues', 'non-obvious work priorities', 'compensation and benefit system', 'lack of research manpower and equipment'. From the strengths and weaknesses of the matrix organization structure of the semiconductor industry, we provide some suggestions for improvements.
Objective: The aim of this study was to investigate 1) the difference in static lower extremity alignment (SLEA) according to a history of lateral ankle sprain (LAS), 2) to identify SLEA factors affecting LAS, and 3) to present the cut-off value and 4) the usefulness and limitations of the SLEA measurement. Method: This case-control study recruited 88 men (age: 27.78±4.69 yrs) and 39 women (age: 24.62±4.20 yrs) subjects with and without LAS. SLEA measurement protocol included Q angle, tibiofemoral angle, genu recurvatum, rear foot (RF) angle, tibal varum and torsion, navicular drop, ankle dorsiflexion range of motion (DF ROM). Independent t-test, logistic regression and receiver operating characteristic (ROC) curve were used for statistical analysis. Results: Men with a history of LAS had significantly smaller Q angles both in standing and in supine position, while women with a history of LAS had significantly greater DF ROM in non-weight bearing (NWB; p < 0.05). Logistic regression model suggests tibial varum (OR = 0.779, p = 0.021) and WB DF ROM (OR = 1.067, p = 0.045) were associated with LAS in men. In case of women, there were no significant SLEA factors for LAS, however, ROC curve analysis revealed standing RF angle (AUC = 0.647, p = 0.028) and NWB DF ROM (AUC = 0.648, p = 0.026) could be affecting factors for LAS. Conclusion: There are differences in SLEA according to the history of LAS, furthermore, the identified items were different by sex. In case of men, tibial varum and WB DF ROM affect LAS occurrence. Standing RF angle and NWB DF ROM of women could be a predictor for LAS. However, since the sensitivity and specificity in most of the SLEA measurements are low, kinematic in dynamic tasks should be considered together for a more accurate evaluation of LAS risk.
Park, Nohmin;Jeong, Heyseung;Park, Taeshin;Yoo, Hyunjung;Lee, Jeongmin;Cho, Woosun
The Korean Society of Law and Medicine
/
v.22
no.2
/
pp.3-48
/
2021
Among the major rulings handed down in 2020, there were cases involving anaphylaxis, which is timely as a side effect of coronavirus and flu vaccine. And as a rare case, a ruling was handed down that if medical treatment was done so unfaithfully beyond the limit of patience of ordinary people, it can be an independent illegal act and a cause of compensation for emotional distress. Also, there was a ruling in the appellate court that evaluated disability rate applying the Korean Academy of Medical Sciences Guides for the Evaluation of Permanent Impairment, not McBride system. And the supreme court made it clear that telemedicine is illegitimate. In relation to duty of explanation, it is in the process of adding detail criterion on the firm principles in the individual cases. In regard of medical records, there was a case that even when a medical record is strongly suspected to be tampered with, it is not considered to be an obstruction of proof. There were cases that resulted in different conclusion between the court of first instance and the appellate court rulings. Lastly, in the face of a growing number of cases in which doctors are sentenced to prison for malpractice, we reviewed a ruling that sentenced a doctor to prison.
This study intends to verify the effectiveness of incentive schemes at Busan Port' aimed at promoting transshipment cargo. The current incentive schemes of Busan port intended to increase the T/S cargo volume have been disputed constantly. It is imperative, therefore, to restructure the system in accordance with the planned strategy. In this study, in order to ensure objectivity of the incentive schemes, all the parties (carriers, terminal operators and Port Authority) with a direct interest are answered and analyzed using the AHP methodology. Effectiveness is the top priority in the analysis of beneficiary validity of incentive schemes, when incentives are provided to Global overseas carriers compared with Global national carriers, IntraAsia carriers and Terminal operators. In the analysis of incentive schemes, direct cash support corresponding to the quantity of the T/S cargo had the highest effectiveness compared with exemption of port dues, cost compensation, port infrastructure support and subsidy for the service opening. The study results, therefore, reference the Port Authority when restructuring the schemes. This study has been conducted only focusing on the Busan port; however, the findings may have significant implications for overseas Port Authorities intending to implement incentive systems to promote cargo volumes similar to those at Busan port.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.15
no.2
/
pp.178-188
/
2022
The introduction of virtual power plants is actively being discussed to solve the problem of grid acceptability caused by the spread of distributed renewable energy, which is the key to achieving carbon neutrality. However, a new business such as virtual power plants is difficult to secure economic feasibility at the initial stage of introduction because it is common that there is no compensation mechanism. Therefore, appropriate support including subsidy is required at the early stage. But, it is generally difficult to obtain the cost model to determine the subsidy level because of the lack of enough data for the new business model. In this study, a survey of domestic experts on the requirements, appropriate scale, and cost required for the introduction of virtual power plants is conducted. First, resource composition scenarios are designed from the survey results to consider the impact of the resource composition on the cost. Then, the cost estimation model is obtained using the individual cost estimation data for their resource compositions using logistic regression analysis. In the case study, appropriate initial subsidy levels are analyzed and compared for the virtual power plants on the scale of 20-500MW. The results show that mid-to-large resource composition cases show 29-51% lower cost than small-to-large resource composition cases.
The avoidance of enemy's radar detection is very important issue in the modem electronic weapon system. Researchers have studied to minimize reflected signals of radar. In this research, two types of radar absorbing structure (RAS), 'C'-type shell and 'U'-type shell, were fabricated using fiber-reinforced composite materials and their radar cross section (RCS) were evaluated. The absorption layer was composed of glass fiber reinforced epoxy and nano size carbon-black, and the reflection layer was fabricated with carbon fiber reinforced epoxy. During their manufacturing process, undesired thermal deformation (so called spring-back) was observed. In order to reduce spring-back, the bending angle of mold was controlled by a series of experiments. The spring-back of parts fabricated by using compensated mold was predicted by finite element analysis (ANSYS). The RCS of RAS shells were measured by compact range and predicted by physical optics method. The measured RCS data was well matched with the predicted data.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.