• Title/Summary/Keyword: Compaction grouting system

Search Result 18, Processing Time 0.02 seconds

Case Study for Improvement of Marine Clay and Dredgedfill Ground by CGS Method (CGS공법에 의한 해성점토 및 준설매립지반의 기초보강 사례)

  • Shin, Eun-Chul;Chung, Duek-Kyo;Seo, Kui-Chang;Lee, Myung-Shin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.480-488
    • /
    • 2010
  • The CGS method is non-discharge replacement method improving ground stiffness by the effect of static compaction with injecting very low slump mortar into ground, and is applied for increasing bearing capacity and filling ground cavity by lifting or restoring differential settled structures and preventing differential settlement. This paper suggests design of ground improvement and construction case history for civil engineering structures by CGS method. This method can be used for reinforcing soft ground and liquefaction of loose sandy soil. This method was used in SongDo area in Incheon Economic Free Zone due to its low vibration of ground while it can improve the soft soil where underground structures(subway and box culvert) are already existed.

  • PDF

Applicability of CGS for Remediation and Reinforcement of Damaged Earth Dam Core (손상된 흙댐 코어의 보수.보강을 위한 CGS 공법의 적용성)

  • 천병식;최중근
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.325-334
    • /
    • 2003
  • It is very difficult to rehabilitate the damaged earth dam core to manage it stably against development of flow path and increase of leakage by hydraulic fracture. In this study, application of CGS (Compaction Grouting System) to damaged earth dam core was noticed by analyzing and comparing the results of the in-situ data and FEM. Results of in-situ data showed that according as progress of rehabilitation works tip pressures increased and volume of injection decreased, voids of damaged dam core were filled with materials similar to origin dam core. Rehabilitations caused turbidity and volume of leakage to decrease at the same water level. Also, results of FEM analysis indicated that permeability decreased by rehabilitation. Through this study, it is proved that CGS is able to decrease permeability coefficient, volume of leakage and turbidity on damaged earth dam core.

A Case Study of Ground Improvement on Railroad Station Foundation by the Application of CGS Method. (역사기초 보강 공법으로써 CGS 공법 적용사례 연구)

  • Yeoh Yoo-Hyeon;Chun Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1065-1070
    • /
    • 2004
  • Recenlty, there are many cases that structures are constructed on soft ground in domestic. Generally in those cases, appropriate geotechnical techniques for the ground are needed. In this study, an example for ground improvement of OO railroad station construction site is introduced and analyzed. The ground conditions of this site which is soft ground are that N value is under 6, average depth and ground water table is 24.4m, GL-1.7. So, as a countermeasure technique for bearing reinforcement, Compaction Grouting System (CGS) method was applied on construction site. To estimate the application of CGS method, piezo cone penetration test and static pile loading test were carried out during the construction. Results of analysis show that CGS method for improving the bearing capacity of soft ground is applicable for the ground well.

  • PDF

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (1) (필댐의 안정성 해석 연구 (1))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.165-177
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys were conducted. In this paper, especially many geophysical methods were adopted to configure out the subsurface situation of dam. Applied geophysical methods were: 1) electric resistivity survey, 2) high frequency magnetotelluric (HFMT) survey, 3) ground penetrating radar (GPR) survey, 4) seismic refraction survey, 5) seismic cross-hole tomography survey, and 6) high frequency impedance (ZHF) survey. Each of geophysical surveys were analyzed and joint analyses between geophysical surveys were also performed to deduce the more reliable subsurface information of Dam by using the features and characteristics of each geophysical survey. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geophysical data and data of geotechnical gauges were also used to confirm the effects of reinforcement. Electric resistivity, EM, GPR, ZHF, seismic refraction and seismic tomography surveys show that left side of dam is weak, which means the possibility of existence of gravel, rock block, water and cavities in the core of dam. This result coincides with the boring data. Especially, electric survey after reinforcement shows that even the right side of the dam has been deformed by the strong pressure during the reinforcement itself. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

Study on Applicability of CGS Method based on Field Experiments and Cavity Expansion Theory (현장시험과 공동팽창이론을 통한 CGS 공법의 적용성 평가)

  • Jung, Hyun-Seok;Seo, Seok-Hyun;Choi, Hangseok;Lee, Hyobum
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.2
    • /
    • pp.19-28
    • /
    • 2019
  • Grounds of the western coast of the Korean Peninsular are mostly composed of soft and cohesive soils, and it is necessary to carry out soil improvement before construction. The CGS (Compaction Grouting System) method has been commonly applied for the purpose of not only improving soft ground but also serving as the pile foundation of a bridge. In this paper, the CGS method was applied to the Incheon International Airport facility site, which consists of reclaimed landfill and soft clay soil, so as to evaluate the applicability of this soil improvement method to soft clay ground formations. Futhermore, results of construction were intensively studied along with a series of field experiments and theoretical consideration. The cone penetration tests were performed to assess the ground improvement effect of the CGS method. Consequently, the application of CGS method led to an increase in soil strength enough to be used as the pile foundation to support the bridge at the site. In addition, the size of the upper grout-bulb was estimated by adopting the cavity expansion theory and compared with that of actual grout bulb exhumed in the field. Therefore, it is proved that the cavity expansion theory can be utilized to predict and evaluate the improvement of soft ground.

A Study on the Behaviour of Diaphragm Wall by the installation of CGS (CGS 시공으로 인한 지중연속벽체 거동에 관한 연구)

  • Kim, Dong-Hee;Hong, Sung-Jin;Min, Ki-Hoon;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1206-1215
    • /
    • 2008
  • In this study, the equivalent pressure acting on the face of drilled hole was determined by back analysis. This analysis was continued until the difference between the displacement directly measured during field test construction of CGS and the displacement evaluated by numerical analysis was below 10 percent, and the affect of diaphragm wall adjacent to grout bulb was evaluated by numerical analysis using the equivalent pressure. From the analysis results, it was observed that the increase of the pressure acting on the diaphragm wall was greater at reclaimed sandfill layer than silty clay layer during the installation of CGS. Two methods were adopted to reduce the pressure acting on the diaphragm wall. One is installing of trench between diaphragm wall and grout bulb, the other is pre-installing of CGS before construction of diaphragm wall. From the numerical analysis results, above two methods can be considered as an effective method to reduce the pressure. It was analyzed that the amount of reduction of the pressure and the displacement are 689.8% and 564.6%, respectively, in the case of adopting the trench method, and 463.7% and 214.0%, respectively, in the case of adopting pre-installing of 3 columns CGS.

  • PDF

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (2) (필댐의 안정성 해석 연구 (II))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.189-207
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys and monitoring the buried geotechnical gauges, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, leakage flow-meter, were conducted. In addition to these data, numerical analyses of behavior of dam were performed to predict and to compare the data which were obtained from the above methods. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geotechnical gauge data were also used to confirm the effects of reinforcement. Analyses of monitoring the data of geotechnical gauges buried in the dam, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, and leakage flow-meter shows the load transfer of dam and the possibility of hydraulic fracturing. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

A Study on the Behavior Characteristics of Soft Clay Ground by C.G.S Method (C.G.S공법을 적용한 연약점토지반에서의 거동특성에 관한 연구)

  • 천병식;여유현
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.307-323
    • /
    • 2003
  • In this study the pilot test of C.G.S (Compaction Grouting System) as injection method by low slump mortar was performed and the results were analyzed in order to find out the application of this method to the soft ground and the effect of settlement restraint. The site for pilot test is adjacent to apartments supported by pile foundations. Sand drain method was performed previously as countermeasures against settlement, but settlement occurs continuously because this ground is very soft. Site investigations such as SPT, CPT and vane shear test were performed to determine the characteristics of ground improvement after the installation of C.G.S. Field measurements were performed on purpose to find out the displacement of ground during the installation of C.G.S. From the results of this study, C.G.S method can be optimized by the control of radius, space, depth, injection material and injection pressure. C.G.S improves soft ground with radial consolidation of adjacent soft ground. Considering that increase of N value to about 3, C.G.S can be considered as an effective method to increase the bearing capacity as well as constrain the settlement of soft ground. It is also expected to be economic and effective in the improvement of ground when it is used in applicable sites.