• 제목/요약/키워드: Commissioning

검색결과 270건 처리시간 0.021초

해양플랜트인력양성을 위한 교육과정개발에 대한 연구 (A Study on Education Curriculum for Human Resource of Offshore Plant)

  • 이창희;이지웅;채종주
    • 수산해양교육연구
    • /
    • 제26권3호
    • /
    • pp.498-509
    • /
    • 2014
  • Offshore plants is an intensive industry where real value is able to be created when EPCIC(Engineering, Procurement, Construction, Installation, Commissioning) is combined. Many universities and educational institutions have established major fields and graduate schools related in offshore construction and engineering as well as safety training and occupational courses. Most of the personnel who have graduated and passed those educational institutions have been working in domestic shipbuilding companies and marine equipment manufacturers. Therefore, customized education and training should be developed according to the educational demands required and then skilled personnel are needed to be supplied at proper times. This study, therefore, has found personnel demands inside and outside the country and occupational sections of offshore plants. Consequently, this study suggests making up a council comprised of shipbuilding companies, marine equipment manufacturers and educational institutions with government organization, and also researches the necessity of getting a job of personnel trained by the customized education. These results are expected to contribute to the development of education curriculum of domestic offshore plant as well as ODC(Offshore Development Center).

고속전철용 트랙제동 및 와전류제동장치 기술동향 (Technology development trend of the track brake and eddy current brake for high speed train)

  • 최권희;장대성;김철근;한동인;전영욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.264-268
    • /
    • 2005
  • Most of the train brakes depends on friction between wheels and tracks. This requires braking force reduced in order not to cause wheel slides since the friction decreases as the train speed increases and consequently results in extension of braking distance. The braking system called 'Linear eddy current brake' or simply' Eddy current brake' is a braking system for making a brake independent from friction, which consists in creating electromagnet by coiling around shoes attached. to bogies; having the shoes above the tracks approached to the tracks upon acknowledgement of a braking command; and authorizing braking force that is irrelevant to friction through magnetic repulsion between electromagnet attached to the tracks and train set by the use of the electromagnet's magnet field characteristics. An electromagnetic attraction braking system that consists in pressing pole shoes attached to bogies against the tracks by using electromagnet's attraction force is called 'Electromagnetic track brake' or simply 'Track brake'. This paper has been prepared in purpose of studying technological tendencies of the eddy current brake and the track brake so that it can be utilized as fundamental data for commissioning Korean high-speed trains with the eddy current brake hereafter.

  • PDF

100 kW급 용융탄산염 연료전지 시스템 개발 IV(MCFC 시스템 시운전) (System Development of a 100 kW Molten Carbonate Fuel Cell IV(System commisioning for operation)

  • 임희천;안교상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 B
    • /
    • pp.1681-1683
    • /
    • 2005
  • The molten carbonate fuel tell(MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO(KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre-commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, $CO_2$ recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system will be operated under 3 atm pressure condition and expected to last over 5,000 hours by the end of this year.

  • PDF

Comparison of first criticality prediction and experiment of the Jordan research and training reactor (JRTR)

  • Kim, Kyung-O.;Jun, Byung Jin;Lee, Byungchul;Park, Sang-Jun;Roh, Gyuhong
    • Nuclear Engineering and Technology
    • /
    • 제52권1호
    • /
    • pp.14-18
    • /
    • 2020
  • Korea Atomic Energy Research Institute (KAERI) has carried out various neutronics experiments in the commissioning stage of the Jordan Research and Training Reactor (JRTR), and this paper introduces the results of first criticality prediction and experiment for the JRTR. The Monte Carlo Code for Advanced Reactor Design and analysis (McCARD) with the ENDF/B-VII.0 nuclear library was used for prediction calculations in the process of the first criticality approach, which was performed to provide reference for the first criticality experiment. In the experiment, fuel loading was carried out by measuring the inverse multiplication factor (1/M) to predict the number of fuel assemblies at the first criticality, and the first critical was reached on April 25, 2016. Comparing the first criticality prediction and experiment, the calculated and measured CAR (Control Absorber Rod) heights for the first criticality were 575 mm and 570.5 mm, respectively, that is, the difference between the two results was approximately 5 mm. From this result, it was confirmed that JRTR manufacturing and various experiments had successfully progressed as designed.

경량전철 전문가 양성을 통한 PM/SE 사업 활성화 방안 연구 (A Study on the Activation of PM/SE Business by Training LRT system Specialists)

  • 최성환;이종성;이대원;이기수;정수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.458-464
    • /
    • 2008
  • The objective of this paper is to seek an alternative to figure out appropriate ways since difficulties lie in the introduction of LRT system to be operated by governments and self-governing local governments in the country. This situation can act as a main cause of breakdown in domestic railway industry by deepening of outflow of national wealth and technological dependency. Policy makers are required to get awareness of justification and necessity of Project management such as project strategy, goals, operating budgets, risks, investment revenue prior to preparing the outline of the introduction of LRT system shall consider securing budget in light of performance, reliability, and safety withe the help of system engineering activities during the entire project cycle such as design, construction, quality management, and commissioning before mapping out the basic plans for LRT project. In view of the current domestic conditions, the first time within the country, Seoulmetro is training professional as trust education of specialist training about LRT system, SE and PM education. This study leads to participating in PM/SE business by human power who finished from education of domestic specialist for LRT introduction corporation and businesses, it is published for introduction of specialist education and business revitalization.

  • PDF

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

e-PSM 시스템의 사용실태와 이행률 향상방안 (A Study on the Use of the e-PSM system and Improvement of Fulfillment Rate)

  • 안윤지;조송희;현유진;신예진;갈원모
    • 대한설비관리학회지
    • /
    • 제23권4호
    • /
    • pp.85-92
    • /
    • 2018
  • With the increasing use of chemicals in domestic businesses, the possibility of fire explosion and poisonous material leakage accidents is also increasing. Accordingly, the Korea Occupational Safety and Health Agency(KOSHA) has implemented the process safety management (PSM) system for a long time. However, process safety report submission has been providing and operating e-PSM since 2016 to address these problems as it is difficult to increase budget spending due to the need for professional capabilities and commissioning the report to consulting institutions. Therefore, this study conducts questionnaires on whether e-PSM system that is well utilized in the field, focusing on existing PSM business sites. In order to find out the activation method that can solve the deficiency factors by analyzing various inconveniences and problems accurately, we propose three improvement methods as educational aspect, promotional direction of e-PSM system, and institutional aspect.

Development and strengthening of the nuclear and radiation safety infrastructure for nuclear power program of Bangladesh

  • Islam, Md. Shafiqul;Faisal, Shafiqul Islam;Khan, Sadia
    • Nuclear Engineering and Technology
    • /
    • 제53권5호
    • /
    • pp.1705-1716
    • /
    • 2021
  • Bangladesh, as a newcomer country, is expecting to start her nuclear power journey by 2022. Due to evident reasons, newcomer nuclear countries face several key challenges concerning the development of national nuclear safety infrastructure. The paper investigates the status of the 7 key safety infrastructure issues out of the 19 and readiness of the supportive organizations, laboratories, and workforces following the International Atomic energy Agency's status evaluation guide at milestone 3 and foreign countries' practice. Much progress has been achieved at phase 3 regarding the establishments of a few Acts, a regulator, and an operator. However, comprehensive regulatory frameworks, skilled workforces, establishments of a few supportive organizations, and laboratories for managing environmental radioactivity, radiological accidents, and radioactive wastes are yet to ready. Several suggestions are made for establishing and expediting radiation monitoring laboratories, a radiological emergency management center, a radioactive waste management company, and technical support organizations for the safety infrastructure. To avoid perceived risks, policymakers and competent authorities need to emphasize creating an optimized safety infrastructure before commissioning and operating the 1st nuclear power plant safely, securely, and cost-sustainably.

전문건설업 안전문화 평가에 관한 연구 (A Study on the Evaluation of Safety Culture in Specialty Contractor)

  • 신상연;백신원;정성룡
    • 한국안전학회지
    • /
    • 제36권2호
    • /
    • pp.18-25
    • /
    • 2021
  • Specialty contractor facilities, which involve a combination of welding and commissioning, face a high risk of serious accidents such as fire, explosion, and suffocation associated with welding work, nitrogen, and argon use. In such facilities, the organizational safety culture has considerable impact on the frequency of accidents. In this study, a safety culture evaluation was conducted on specialty contractors. NOSACQ-50, a standardized survey method on safety culture, was selected as an assessment tool to evaluate the safety culture in specialized construction companies that could not afford to invest heavily in safety. The self-administered questionnaire survey was conducted with 201 workers of four construction companies and the results were analyzed. It was found that in companies with low safety culture, the occurrence of irrationality was 66.0%, while in companies with high safety culture, the occurrence of irrationality was 42.6%. Thus, the difference in the occurrence of irrationality by safety culture was statistically significant. The difference in safety culture level according to the experience of occurrence of irrationality was also significant. It was also found that the higher the belief in safety management authorization, safety responsibilities of managers, worker safety priorities, and safety system effects, the lower the probability of irrationality.

Human resource development and needs analysis for nuclear power plant deployment in Nigeria

  • Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
    • Nuclear Engineering and Technology
    • /
    • 제54권2호
    • /
    • pp.749-763
    • /
    • 2022
  • The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.