Commissioning of a micro-MLC (mMLC) for Stereotactic Radiosurgery (방사선수술용 4뱅크 마이크로 다엽콜리메이터의 인수 검사)

  • Jeong, Dong-Hyeok;Shin, Kyo-Chul;Kim, Jeung-Kee;Kim, Soo-Kon;Moon, Sun-Rock;Lee, Kang-Kyoo
    • Progress in Medical Physics
    • /
    • v.20 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • The 4 bank mico-MLC (mMLC; Acculeaf, Direx, Isral) has been commissioned for clinical use of linac based stereotactic radiosurgery. The geometrical parameters to control the leaves were determined and comparisons between measured and calculated by the calculation model were performed in terms of absolute dose (cGy/100 MU). As a result of evaluating calculated dose for various field sizes and depths of 5 and 10 cm in water in the geometric condition of fixed SSD (source to surface distance) and fixed SCD (source to chamber distance), most of differences were within 1% for 6 MV and 15 MV x-rays. The penumbral widths at the isocenter were approximately evaluated to 0.29~0.43 cm depending on the field size for 6 MV and 0.36~0.51 cm for 15 MV x-rays. The average transmission and leakage for 6 MV and 15 MV x-rays were 6.6% and 7.4% respectively in single level of leaves fully closed. In case of dual level of leaves fully closed the measured transmission is approximately 0.5% for both 6 MV and 15 MV x-rays. Through the commissiong procedure we could verify the dose characteristics of mMLC and approximately evaluate the error ranges for treatment planning system.

  • PDF

Analysis of Low MU Characteristics of Siemens Primus Linear Accelerator using Diode Arrays for IMRT QA (다이오드 어레이를 이용한 Siemens사의 Primus 선형가속기의 저 MU 특성 분석)

  • Kim, Ju-Ree;Lee, Re-Na;Lee, Kyung-Ja
    • Progress in Medical Physics
    • /
    • v.19 no.3
    • /
    • pp.164-171
    • /
    • 2008
  • One of the most important task in commissioning intensity modulated radiotherapy (IMRT) into a clinic is the characterization of dosimetry performance under small monitor unit delivery conditions. In this study, method of evaluating dose monitor linearity, beam flatness and symmetry, and MLC positioning accuracy using a diode array is investigated. Siemens Primus linear accelerator (LA) with 6 and 10 MV x-rays was used to deliver radiation and the characteristics were measured using a multi array diodes. Monitor unit stabilities were measured for both x-ray energies. The dose linearity errors for the 6 MV x-ray were 2.1, 3.4, 6.9, 8.6, and 15.4 % when 20 MU, 10 MU, 5 MU, 4 MU, and 2 MU was delivered, respectively. Greater errors were observed for 10 MV x-rays with a maximum of 22% when 2 MU was delivered. These errors were corrected by adjusting D1_C0 values and reduced to less than 2% in all cases. The beam flatness and symmetry were appropriate without any correction. The picket fence test performed using diode array and film measurement showed similar results. The use of diode array is a convenient method in characterizing beam stability, symmetry and flatness, and positioning accuracy of MLC for IMRT commissioning. In addition, adjustment of D1-C0 value must be performed when a Siemens LA is used for IMRT because factory value usually gives unacceptable beam stability error when the MU/segment is smaller than 20.

  • PDF

Efficient Verification of X-ray Target Replacement for the C-series High Energy Linear Accelerator

  • Cho, Jin Dong;Chun, Minsoo;Son, Jaeman;An, Hyun Joon;Yoon, Jeongmin;Choi, Chang Heon;Kim, Jung-in;Park, Jong Min;Kim, Jin Sung
    • Progress in Medical Physics
    • /
    • v.29 no.3
    • /
    • pp.92-100
    • /
    • 2018
  • The manufacturer of a linear accelerator (LINAC) has reported that the target melting phenomenon could be caused by a non-recommended output setting and the excessive use of monitor unit (MU) with intensity-modulated radiation therapy (IMRT). Due to these reasons, we observed an unexpected beam interruption during the treatment of a patient in our institution. The target status was inspected and a replacement of the target was determined. After the target replacement, the beam profile was adjusted to the machine commissioning beam data, and the absolute doses-to-water for 6 MV and 10 MV photon beams were calibrated according to American Association of Physicists in Medicine (AAPM) Task Group (TG)-51 protocol. To verify the beam data after target replacement, the beam flatness, symmetry, output factor, and percent depth dose (PDD) were measured and compared with the commissioning data. The difference between the referenced and measured data for flatness and symmetry exhibited a coincidence within 0.3% for both 6 MV and 10 MV, and the difference of the PDD at 10 cm depth ($PDD_{10}$) was also within 0.3% for both photon energies. Also, patient-specific quality assurances (QAs) were performed with gamma analysis using a 2-D diode and ion chamber array detector for eight patients. The average gamma passing rates for all patients for the relative dose distribution was $99.1%{\pm}1.0%$, and those for absolute dose distribution was $97.2%{\pm}2.7%$, which means the gamma analysis results were all clinically acceptable. In this study, we recommend that the beam characteristics, such as beam profile, depth dose, and output factors, should be examined. Further, patient-specific QAs should be performed to verify the changes in the overall beam delivery system when a target replacement is inevitable; although it is more important to check the beam output in a daily routine.

KLYSTRON-MODULATOR SYSTEM PERFORMANCES FOR PLS 2-GeV LINAC (포항 20억 전자볼트 선형가속기 클라이스트론-모듈레이터 시스템의 성능)

  • Park, S.W.;Park, S.S.;Lee, K.T.;Oh, J.S.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07c
    • /
    • pp.1365-1367
    • /
    • 1995
  • The PLS 2-GeV linac employs 11 units of high-power pulsed klystrons(80MW) as the main RF sources. The matching modulators of 200 MW(400kV, 500 A) can provide a flat-top pulse width of 4.4 ${\mu}s$ with a maximum pulse repetition rate of 120 Hz at the full power level. For a good stability of electron beams, the pulse-to-pulse flat-top voltage variation of a modulator requires less than 0.5%. In order to achieve this goal, we stabilized high voltage charging power supplies within 1% by a phase controlled SCR voltage regulator. In addition, we employed ac/dc feedback together with a resistive De-Q'ing system to achieve far less than 0.5% variation of the PFN charging voltage. This paper presents the main feature of the klystron-modulator system and the characteristics of the pulsed high-power RF system performance during the beam injection operation for the Pohang Light Source commissioning.

  • PDF

The Analysis on the Assessment Categories of Korea Green Building Certification Criteria by the Case Studies of Educational Facilities (국내 학교시설의 친환경건축물 인증 평가항목 및 사례 분석)

  • Kim, Chang-Sung
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.20 no.2
    • /
    • pp.15-24
    • /
    • 2013
  • Concerns about green building construction were quite increasing around the world. Therefore, Korea Government has executed the Green Building Certification Criteria(GBCC) in 2002. The GBCC of educational facilities was executed in 2005 and was revised in 2010. The aim of this paper is to check the reliability of weighting factors in all assessment categories of GBCC and to suggest the future revision direction of GBCC. For the study, the old and current version of GBCC were examined and the 5 cases certificated by the old version were analyzed and reassessed by current version to compare with the differences of the two in obtaining the green building certification. According to the results of the study, the GBCC requires additional amendments about the assessment categories of the energy consumption monitoring and building commissioning as required subjects in order to secure the stable performances of building. In addition, the categories of building management need to be assessed more intensively and the certification criteria for existing building should be enacted as soon as possible.

A Method for Generating a Plant Model Based on Log Data for Control Level Simulation (제어시뮬레이션을 위한 생산시스템 로그데이터 기반 플랜트 모델 생성 방법)

  • Ko, Minsuk;Cheon, Sang Uk;Park, Sang Chul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.1
    • /
    • pp.21-27
    • /
    • 2013
  • Presented in the paper is a log data based modeling method for effective construction of a virtual plant model which can be used for the virtual PLC (Programmable Logic Controller) simulation. For the PLC simulation, the corresponding virtual plant, consisting of virtual devices, is required to interact with the input and output symbols of a PLC. In other words, the behavior of a virtual device should be the same as that of the real device. Conventionally, the DEVS (Discrete Event Systems Specifications) formalism has been used to represent the behavior a virtual device. The modeling using DEVS formalism, however, requires in-depth knowledge in the simulation area, as well as the significant amount of time and efforts. One of the key ideas of the proposed method is to generate a plant model based on the log data obtained from the production system. The proposed method is very intuitive, and it can be used to generate the full behavior model of a virtual device. The proposed approach was applied to an AGV (Automated Guided Vehicle).

Development of Standard Activity Model for Small and Medium sized Plant: Focused on Detailed Design Phase (중소형 플랜트의 표준화된 플랜트 엔지니어링 활동 모델 개발: 상세설계를 중심으로)

  • Shin, Jung Uk;Yeom, Choong Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.1
    • /
    • pp.13-18
    • /
    • 2018
  • Plant Engineering is a series of activities going through following life cycle phases: planning, basic design, detailed design, procurement and construction, commissioning, operation and maintenance, to produce a target product. From among these phases of plant engineering life cycle, a detailed design phase is an important phase producing final design deliveries. Luckily, through technical co-operation and experiences of constructing plants, large Korean engineering companies have accumulated know-hows of efficient detailed designs. However, smaller engineering companies have less experience of performing detailed designs so there is always a risk of causing design errors in the detailed design phase. To mitigate the risk of design errors in the detailed design phase, it is necessary to systematize a concrete activity model of a detailed design phase. In this paper, we have developed a prototype of a detailed design activity model through a widely used function modeling methodology called IDEF0.

Dose Calculation of Photon Beam with Wedge Filter for Radiation Therapy Planning System

  • Cheong, Kwang-Ho;Suh, Tae-Suk;Lee, Hyoung-Koo;Choe, Bo-Young
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2003.09a
    • /
    • pp.41-41
    • /
    • 2003
  • Purpose: Even if the wedge filter is widely used for the radiation therapy to modify the photon beam intensity, the wedged photon beam dose calculation is not so easy. Radiation therapy planning systems (RTPS) have been used the empirical or semi-analytical methods such as attenuation method using wedge filter parameters or wedge filter factor obtained from measurement. However, these methods can cause serious error in penumbra region as well as in edge region. In this study, we propose the dose calculation algorithm for wedged field to minimize the error especially in the outer beam region. Materials and Method: Modified intensity by wedge filter was calculated using tissue-maximum ratio (TMR) and scatter-maximum ratio (SMR) of wedged field. Profiles of wedged and non-wedged direction was also used. The result of new dose calculation was compared with measurement and the result from attenuation method. Results: Proposed algorithm showed the good agreement with measurement in the high dose-gradient region as well as in the inner beam region. The error was decreased comparing to attenuation method. Conclusion: Although necessary beam data for the RTPS commissioning was increased, new algorithm would guarantee the improved dose calculation accuracy for wedged field. In future, this algorithm could be adopted in RTPS.

  • PDF

100 kW급 용융탄산염 연료전지 발전시스템 개발

  • Im, Hui-Cheon;Kim, Do-Hyeong;Seo, Hye-Gyeong;Park, Seong-Yeon;An, Gyo-Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.140-148
    • /
    • 2005
  • The molten carbonate fuel cell (MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO (KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre - commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, CO2 recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system has been operated from 13th of September on this year and produced 50 kW AC under atmospheric pressure condition and expected to operate by the end of this year.

  • PDF

Development of Remote Valve Control System with Power Line Communication (전력선 통신 및 제어기능을 구비한 원격 밸브 제어시스템 개발)

  • Moon, Hyeong-Soon;Kim, Jong-Cheol;Lee, Byeong-Yeol;Kim, Yong-Baek;Kim, Jee-On
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.71-79
    • /
    • 2009
  • The world-wide ship construction market is forecast that the considerable portion of shipbuilding and oceanic plant industry will be transferred consequently in China after 5 or 10 years. This point of view where the Korean ship construction industry seizes the initiative from the world-wide ship construction/oceanic field, we must cultivate technical power of base technology, and focus our interests on the development of core parts. In this study, our proprietary remotely operated valve actuator system with power line technology was developed to enhance the installation and commissioning process by our own technology. This paper describes the new design and functions of the remotely operated valve system for shipbuilding and offshore market especially for FPSO.

  • PDF