• 제목/요약/키워드: Commissioning

검색결과 270건 처리시간 0.03초

Calibration and Validation Activities for Earth Observation Mission Future Evolution for GMES

  • LECOMTE Pascal
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.237-240
    • /
    • 2005
  • Calibration and Validation are major element of any space borne Earth Observation Mission. These activities are the major objective of the commissioning phases but routine activities shall be maintained during the whole mission in order to maintain the quality of the product delivered to the users or at least to fully characterise the evolution with time of the product quality. With the launch of ERS-l in 1991, the European Space Agency decided to put in place a group dedicated to these activities, along with the daily monitoring of the product quality for anomaly detection and algorithm evolution. These four elements are all strongly linked together. Today this group is fully responsible for the monitoring of two ESA missions, ERS-2 and Envisat, for a total of 12 instruments of various types, preparing itself for the Earth Explorer series of five. other satellites (Cryosat, Goce, SMOS, ADM-Aeolus, Swarm) and at various levels in past and future Third Party Missions such as Landsat, J-ERS, ALOS and KOMPSAT. The Joint proposal by the European Union and the European Space Agency for a 'Global Monitoring for Environment and Security' project (GMES), triggers a review of the scope of these activities in a much wider framework than the handling of single missions with specific tools, methods and activities. Because of the global objective of this proposal, it is necessary to put in place Multi-Mission Calibration and Validation systems and procedures. GMES Calibration and Validation activities will rely on multi source data access, interoperability, long-term data preservation, and definition standards to facilitate the above objectives. The scope of this presentation is to give an overview of the current Calibration and Validation activities at ESA, and the planned evolution in the context of GMES.

  • PDF

Investigations into a Multipurpose Dam in Tasman District-New Zealand

  • Thomas, Joseph Theodore
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.40-48
    • /
    • 2008
  • The Waimea Basin is located on the northern tip of the South Island of New Zealand. It is a highly productive area with intense water use with multi-stakeholder interest in water. Irrigation from the underground aquifers here makes up the largest portion of used water; however the same aquifers are also the key urban and industrial sources of water. The Waimea/Wairoa Rivers are the main sources of recharge to the underlying aquifers and also feed the costal springs that highly valued by the community and iwi. Due to the location of the main rivers and springs close to the urban centre the water resource system here has high community and aesthetic values. Recent enhanced hydrological modelling work has shown the water resources in this area to be over allocated by 22% for a 1:10 year drought security for maintaining a minimalistic flow of 250 l/s in the lower Waimea River. The current irrigated land area is about 3700 hectares with an additional potential for irrigation of 1500 hectares. Further pressures are also coming on-line with significant population growth in the region. Recent droughts have resulted in significant water use cutbacks and the threat of seawater intrusion in the coastal margins. The Waimea Water Augmentation Committee (WWAC) initiated a three year stage 1 feasibility study in 2004/2005 into the viability of water storage in the upper parts of the catchment for enhancing water availability and its security of supply for consumptive, environmental, community and aesthetic benefits downstream. The project also sought to future proof water supply needs for the Waimea Plains and the surrounding areas for a 50 - 100 year planning horizon. The broad range stage 1 investigation programme has identified the Upper Lee Catchment as being suitable for a storage structure to provide the needs identified and also a possibility for some small scale hydro electricity generation as well. The stage 2 detailed feasibility investigations that are underway now (2007/2008), and to be completed in two years is to provide all details for progressing with the next stage of obtaining necessary permits for construction and commissioning a suitable dam.

  • PDF

Acceptance Test and Clinical Commissioning of CT Simulator

  • An, Hyun Joon;Son, Jaeman;Jin, Hyeongmin;Sung, Jiwon;Chun, Minsoo
    • 한국의학물리학회지:의학물리
    • /
    • 제30권4호
    • /
    • pp.160-166
    • /
    • 2019
  • This study examined the clinical use of two newly installed computed tomography (CT) simulators in the Department of Radiation Oncology. The accreditation procedure was performed by the Korean Institute for Accreditation of Medical Imaging. An Xi R/F dosimeter was used to measure the CT dose index for each plug of the CT dose index phantom. Image qualities such as the Hounsfield unit (HU) value of water, noise level, homogeneity, existence of artifacts, spatial resolution, contrast, and slice thickness were evaluated by scanning a CT performance phantom. All test items were evaluated as to whether they were within the required tolerance level. CT calibration curves-the relationship between CT number and relative electron density-were obtained for dose calculations in the treatment planning system. The positional accuracy of the lasers was also evaluated. The volume CT dose indices for the head phantom were 22.26 mGy and 23.70 mGy, and those for body phantom were 12.30 mGy and 12.99 mGy for the first and second CT simulators, respectively. HU accuracy, noise, and homogeneity for the first CT simulator were -0.2 HU, 4.9 HU, and 0.69 HU, respectively, while those for second CT simulator were 1.9 HU, 4.9 HU, and 0.70 HU, respectively. Five air-filled holes with a diameter of 1.00 mm were used for assessment of spatial resolution and a low contrast object with a diameter of 6.4 mm was clearly discernible by both CT scanners. Both CT simulators exhibited comparable performance and are acceptable for clinical use.

High Mass X-ray Binary and IGOS with IGRINS

  • Chun, Moo-Young;Moon, Dae-Sik;Jeong, Ueejeong;Yu, Young Sam
    • 천문학회보
    • /
    • 제39권2호
    • /
    • pp.95-95
    • /
    • 2014
  • The mass measurement of neutron stars or black holes is of fundamental importance in our understanding of the evolution of massive stars and core-collapse supernova explosions as well as some exotic physics of the extreme conditions. Despite the importance, however, it's very difficult to measure mass of these objects directly. One way to do this, if they are in binary systems, to measure their binary motions (i.e., Doppler shifts) which can give us direct information on their mass. Recently many new highly-obscured massive X-ray binaries have been discovered by new hard X-ray satellites such as INTEGRAL and NuSTAR. The new highly-obscured massive X-ray binaries are faint in the optical, but bright in the infrared with many emission lines. Based on the near-infrared spectroscopy, one can first understand the nature of stellar companions to the compact objects, determining its spectral types and luminosity classes as well as mass losses and conditions of (potential) circumstellar material. Next, spectroscopic monitoring of these objects can be used to estimate the mass of compact objects via measuring the Doppler shifts of the lines. For the former, broad-band spectroscopy is essential; for the latter, high-resolution spectroscopy is critical. Therefore, IGRINS appears to be an ideal instrument to study them. An IGRINS survey of these new highly-obscured massive X-ray binaries can give us a rare opportunity to carry out population analyses for understanding the evolution of massive binary systems and formation of compact objects and their mass ranges. In this talk, we will present a sample near-infrared high resolution spectra of HMXB, IGR J19140+0951 and discuss about its spectral feature. These spectra are obtained on 13th July, 2014 from IGRINS commissioning run at McDonald 2.7m telescope. And at final, we will introduce the upgrade plan of IGRINS Operation Software (IGOS), to gather the input from IGRINS observer.

  • PDF

Auto-guiding Performance from IGRINS Test Observations (Immersion GRating INfrared Spectrograph)

  • Lee, Hye-In;Pak, Soojong;Le, Huynh Anh N.;Kang, Wonseok;Mace, Gregory;Pavel, Michael;Jaffe, Daniel T.;Lee, Jae-Joon;Kim, Hwihyun;Jeong, Ueejeong;Chun, Moo-Young;Park, Chan;Yuk, In-Soo;Kim, Kangmin
    • 천문학회보
    • /
    • 제39권2호
    • /
    • pp.92.1-92.1
    • /
    • 2014
  • In astronomical spectroscopy, stable auto-guiding and accurate target centering capabilities are critical to increase the achievement of high observation efficiency and sensitivity. We developed an instrument control software for the Immersion GRating INfrared Spectrograph (IGRINS), a high spectral resolution near-infrared slit spectrograph with (R=40,000). IGRINS is currently installed on the McDonald 2.7 m telescope in Texas, USA. We had successful commissioning observations in March, May, and July of 2014. The role of the IGRINS slit-viewing camera (SVC) is to move the target onto the slit, and to provide feedback about the tracking offsets for the auto-guiding. For a point source, we guide the telescope with the target on the slit. While for an extended source, we use another a guide star in the field offset from the slit. Since the slit blocks the center of the point spread function, it is challenging to fit the Gaussian function to guide and center the target on slit. We developed several center finding algorithms, e.g., 2D-Gaussian Fitting, 1D-Gaussian Fitting, and Center Balancing methods. In this presentation, we show the results of auto-guiding performances with these algorithms.

  • PDF

120kV/70A MOSFETs Switch의 구동회로 개발 (Development of the 120kV/70A High Voltage Switching Circuit with MOSFETs Operated by Simple Gate Drive Unit)

  • 송인호;최창호
    • 전력전자학회논문지
    • /
    • 제8권1호
    • /
    • pp.24-29
    • /
    • 2003
  • 현재 120kV/70A 고압 스위치가 KSTAR의 NBI 시스템에 사용되기 위하여 대전의 원자력 연구소에 설치되어 있다. NBI 시스템은 아크 발생시 이온 소스를 보호하기 위하여 전압의 빠른 차단 및 빔 전류의 유시를 위하여 전압의 빠른 턴온이 요구된다. 따라서 고압 스위치와 아크 검출회로는 NBI 시스템에서 중요한 부분을 차지하고 있다. 고압의 반도체 스위치는 NBI 시스템 뿐만 아니라 산업전반에서 요구되고 있다. NBI 시스템에 적용된 120kV/70A 고압 스위치는 100개의 MOSFET 소자를 직렬연결하였으며 본 논문에서 제안한 바이어스 전원이 없는 간단한 구동회고를 사용하였다. 실험식에서의 시험 및 현장에서 100kW의 모의 저항부하와 NBI 이온 소스에 적용한 실험결과를 제시하였다. 본 논문은 120kV/70A 고압 MOSFET 스위치와 간단한 게이트 구동회로의 설계를 제시하였으며, 제작 및 시험기간 동안의 문제점 및 해결방안에 대해서도 제시하였다.

200MW 석탄화력 순환 유동층 보일러 이차공기송풍기용 H-브릿지 멀티레벨 인버터 현장적용 (Field Application of H-Bridge Multi-level Inverter for Fluidized Bed Combustion Boiler Secondary Air Fan)

  • 김봉석;류호선
    • 전력전자학회논문지
    • /
    • 제12권5호
    • /
    • pp.424-431
    • /
    • 2007
  • 본 논문은 발전소의 이차공기송풍기를 가변 회전수 제어하여 소내 소비 전력을 절감하고 전동기의 직입기동에 의한 스트레스를 줄이기 위하여 실증 적용된 200MW 석탄화력 발전소 순환 유동층 보일러 이차 공기 송풍기 구동용 H-브릿지 멀티레벨 인버터에 관한 것이다. H-브릿지 멀티레벨 인버터는 독립적으로 절연된 직류 부를 갖는 저전압의 단상 인버터(셀 인버터)를 다수 직렬 접속하여 고전압 3상 전압을 출력하는 Cascaded H-브릿지 전압형 인버터이다. 전력연구원은 6.6kV, 1MVA급 인버터 개발, 발전소에 설치, 보일러 점화 전/후 시험 및 계통 병입 후 부하 시험 등을 국내 최초로 성공적으로 완료하였다. 현재 200MW 석탄화력 발전소 이차 공기 송풍기 구동용 인버터는 상업 운전 중에 있다. 본 논문에서는 개발된 H-브릿지 멀티레벨 인버터, 기존 발전 설비와 신규 인버터 시스템의 인터페이스 부분에 해당하는 보일러 DCS(Distributed Control System : 분산 제어 시스템) 로직, 계통 병입 후 시운전 결과에 대하여 상세히 기술하였다.

인천국제공항건설 사업관리 경험 (Introduction to CM Experience from Incheon International Airport (IIA) Construction Project)

  • 박대원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.20-25
    • /
    • 2004
  • 2003년 7월 18일 인칠공항공사는 동북아의 중추공항(Hub-Airport)건설을 목표로 단계적으로 추진되는 인천국제공항 2단계건석사업에 필요한 전문적인 사업관리 기술을 지원 받기 위하여 KIDS 컨소시엄(건원, ITM, 도화, 공간으로 구성된 컨소시엄)과 2단계 건설사업관리 기술지원용역계약을 체결하였다. 2단계 건설사업은 250만 평의 부지조성, 제3활주로, 계류장,원격탑승동, 무인자동열차, 고속수하물처리시설, 화물터미널. 등과 필요한 시설물을 2008년 말까지 완료하는 것으로 계획되어 있으며 CM계약자는 기 구축된 공항공사의 각종 사업관리 Tool을 이용하여 공정관리를 포함한 종합사업관리, 건축/전럭시설의 설계감리. IAT/BHS 등의 설계관리. 품질 및 시운전관리 등의 업무에 국내외 전문인력을 공항공사의 사업관리 조직에 투입하여 공사직원들과 함께 사업목표 달성을 위해 매진하고 있다. 본 고에서는 인천공항공사에서 수행하고 있는 건설사업관리사례를 주요업무 중심으로 소개해 보고자 한다.

  • PDF

Wide-Field Imaging Telescope-0(WIT0): A New Wide-Field 0.25 m Telescope at McDonald Observatory

  • Lee, Sang-Yun;Im, Myungshin;Pak, Soojong;Ji, Tae-Geun;Lee, Hye-In;Hwang, Seong Yong;Marshall, Jennifer;Prochaska, Travis;Gibson, Coyne A.
    • 천문학회보
    • /
    • 제42권1호
    • /
    • pp.34.2-34.2
    • /
    • 2017
  • A small wide-field imaging telescope is a powerful instrument to survey the Universe: wide-field image can monitor the variability of many sources at a time, e.g. young stellar objects and active galactic nuclei, and it can be an effective way to locate transient sources without precise positional information such as gravitational wave sources or some gamma-ray bursts. In February 2017, we installed a 0.25 m f/3.6 telescope on the McDonald 0.8 m telescope as a piggyback system. With a $4k{\times}4k$ CCD camera, the telescope has a $2.35{\times}2.35deg$ field-of-view. Currently, it is equipped with Johnson UBVRI filters and 3 narrow-band filters: $H{\alpha}$, OIII and SII. We will present the installation process, and the telescope performance such as detection limit and image quality based on the data from commissioning observations. We will also discuss possible scientific projects with this system.

  • PDF

경상남도 교원정보활용능력 인증제 시행의 실태조사 및 개선방안 (A Survey of Actual Conditions and Improvement of Enforcement on ICT-ACCST in Gyeongsangnam-do)

  • 이재욱;남영호
    • 컴퓨터교육학회논문지
    • /
    • 제8권6호
    • /
    • pp.65-74
    • /
    • 2005
  • 각 시 도교육청에서는 교사의 ICT 활용능력을 신장시키기 위해 교원정보활용능력 인증제(ICT-ACCST)를 시행하고 있다. 그러나 인증제를 시행한지 3년이 지났지만, 인증 자격을 받은 교사의 비율은 매우 낮으며, 최근에는 인증자의 수가 급격히 감소하고 있다. 본 연구의 목적은 경상남도 교육청에서 시행하고 있는 교원정보활용능력 인증제의 문제점을 개선하기 위한 방안을 마련하는 것이다. 이를 위해 먼저 인증제와 관련된 참고문헌들을 조사 분석하여 인증제를 개선할 수 있는 시사점을 도출하였다. 다음으로 시사점을 바탕으로 설문 문항들을 개발하였다. 연구 자료는 547명의 경상남도내 초 중 고등학교 교사들을 대상으로 수집되었다. 본 연구로 부터 얻을 수 있는 인증제의 개선점은 인센티브의 적절성, 개별과목 인증방식 도입, 인증의 유효기간 도입, 인증을 공신력 있는 외부기관에 위탁 등을 고려하는 것이다.

  • PDF