Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

The Application of 122kg/$\textrm{cm}^2$ Ultra High Strength Concrete on Tall Building (1200kg/$\textrm{cm}^2$ 초고강도 콘크리트의 고층 주상복합구조물에의 시공 및 특성화 연구)

  • 신성우;안종문;유석형;윤영수;이승훈;백승준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.10a
    • /
    • pp.262-266
    • /
    • 1995
  • This paper present the application and construction characteristics of Ultra-High Strength Concrete on Samsung Sin Dae-Bang Housing-Commercial Combined building with 28 story including 8 story basement in seoul. 1200kg/ $\textrm{cm}^2$compressive strength has been placed for paraphet at lst floor for experimental purposes. 420kg/$\textrm{cm}^2$ design strength concrete was used for other basement and frame up to 10th floor which is used for commercial purposes.

  • PDF

The Method to Build Knowledge-Base for User's Preference Retrieval (감성정보검색을 위한 지식베이스 구축방법)

  • Kim, Don-Han
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2008.10a
    • /
    • pp.5-8
    • /
    • 2008
  • This study proposed the Knowledge Base Building method reflecting the user's preferences based on the fuzzy set theory to develop information contents which support pedestrian's navigation. This research evaluated subject's preferences on the commercial spaces set to the hypothetical destination. Also it surveyed the causal relationship between the visual characteristics and the emotional characteristics to propose the methods of Navigation Knowledge Base (NKB). The NKB was composed by three elements; 1.the correlation model between emotional characteristics, 2.the causal relationship between visual characteristics and emotional characteristics, 3.the transformation model between visual characteristics and the physical characteristics.

  • PDF

A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings (Commercial Office의 Facility Management(FM) 업무 현황 분석을 통한 성과 평가체계 구축 방안)

  • Yoon, Jong-Han;Cha, Hee-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.89-90
    • /
    • 2016
  • Despite the rise of importance of Facility Management(FM), relatively little attention was paid to evaluate FM efficiency and drive for greater FM efficiency. The purpose of the present paper is to offer a quantitative analysis of 14 Key Success Factors(KSF) and 22 detailed maintenance practices in order to develop FM evaluation system. In addition, from survey with Owner/Property Manager group and Facility Manager group, the present paper measures both importance of detailed maintenance practices and performance satisfaction. It is expected that by using the result of this survey, this paper helps increase efficiency in FM. Moreover, It is expected that this paper will be used as base line data in developing FM practice evaluation system.

  • PDF

A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects (도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰)

  • Moon, Myung-Yeol;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Study for Improvement of Domestic System through Regulation based on Comparison of Green Building Certification System Analysis - Focused on the G-SEED, BREEAM

  • Hyun, Eun-Mi;Kim, Yong-Sik
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.13-20
    • /
    • 2015
  • The main purpose of the green buildings by reducing energy consumption and carbon footprint of the building society, global as to ensure the sustainability of the building and the environment. These regulations and schemes are used to activate the green buildings were made on the basis of the relevant laws and regulations. Mainly in the research for the improvement of the domestic institutional assessment items, the analysis of the legislation was fundamentally focused on Scoring the incomplete state. The analysis based on the laws and regulations of the institution is the way to know the purpose and direction of the respective certification. This study was performed in the following order to target the new commercial buildings. First, the analysis of the geungeobeop G-SEED and BREEAM. Second, we analyze the content and method of building energy performance in the certification system. As a result, Green Building Act is broad in relation to the composition of the contents are building for the activation energy green building and EPI is dealt with in an abstract and presented the applicability of such documentary content of insulation and airtightness, efficient machine. In contrast, the UK has been directly limit the carbon footprint of buildings in the Building Regulations Part L and evaluate them in BREEAM. This analysis of the ways to reduce substantially the energy for domestic green building regulations should be addressed through the feed.

Efficient Analysis of Building Structures with a Rigid Floor System (주상복합건물의 효율적인 지진해석)

  • 황현식;이동근
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.1 no.1
    • /
    • pp.79-88
    • /
    • 1997
  • Very stiff floor system in a residential-commercial building causes some problems in the numerical analysis procedure due to significant difference in stiffness with adjacent elements. Static analysis of structure with a stiff transfer-floor can be performed approximately in two steps for upper and lower parts for the structure. However, it is impossible to perform dynamic analysis in two steps with separate models. An efficient method for dynamic analysis of a structure with a right floor system is proposd in this study. The matrix condensation technique is employed to reduce the degree of freedom for upper and lower parts of the structure and a beam elements with rigid bodies at both ends are introduce to model the rigid floor system. Efficiency and accuracy of the proposed method are verified through analysis of several example structures.

  • PDF

A Study on the resident preference of location type for community spaces within super high-rise apartment building (초고층아파트 주동 내 커뮤니티 공간의 거주자 위치 선호에 관한 연구)

  • Kim, Da-Hae;Lee, Yeun-Sook;Ahn, Chang-Houn
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.11a
    • /
    • pp.33-36
    • /
    • 2009
  • Korea is the 3rd highest country in population density of the world,furthermore, 1/5 of Korean lives in Seoul with only 0.0% tiny area size. It explains the high-rise apartment has diffused so fast. Regardless of its height, almost all apartments have been planned in a very uniform way, ignoring the possibilities of vertical community and commercial culture. Since considerable number of residents have within building, ways to improve the community and commercial culture need to be explored. One major way to do is providing community space where residents are expected to use in a natural way. The purpose of this research is to identify preferred location of community space in each apartment building. Web guesting survey was used as main methodology. 83 data were collected during mid October, 2009. As results, lobby at the first floor was most favorably selected by super high-rise apartment residents due to convenience, accessibility.

  • PDF

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.