• Title/Summary/Keyword: Collaborative Work

Search Result 390, Processing Time 0.028 seconds

Development of a Machine Control Technology and Productivity Evaluation for Excavator (굴착기 머신 콘트롤 기술 개발 및 생산성 향상 평가)

  • Lee, Min Su;Shin, Young Il;Choi, Seung Joon;Kang, Han Byul;Cho, Ki Yong
    • Journal of Drive and Control
    • /
    • v.17 no.1
    • /
    • pp.37-43
    • /
    • 2020
  • An intelligent excavator can be divided into Machine Guidance (MG), semi-automatic, and unmanned by technology. The MG technology excavator is equipped with a tilt sensor on each link of the excavator and a GPS is installed on the excavator body to inform the user of the position of the excavator bucket end. Machine control (MC) technology that assists the user's work can be divided into semi-automatic and fully automatic technology. The semi-automatic MC equipment has already been commercialized by Komatsu and Caterpillar. The MC excavator is equipped with an electro-hydraulic system, sensors and controllers to control the excavator bucket end according to the user's needs. In this study, the semi-automated excavator modified based on manual excavator, is equipped with an electro-hydraulic system, a controller system, multi-sensors and a control algorithm is developed to assist in excavation work such as leveling and grading. By applying the developed technology, it was possible to confirm productivity improvement compared to manual digging and leveling work. In the future, further research to improve the accuracy of the hydraulic precision control and collaborative work with heterogeneous construction equipment such as dump truck and automated collaboration tasks technology could be developed.

Collaboration Among Design Fields With a Focus on the Fashion Industry (패션산업을 중심으로 한 디자인 영역간의 콜레보레이션)

  • Jeong, Hoon-Sil;Kim, Young-In
    • Journal of the Korean Society of Costume
    • /
    • v.58 no.6
    • /
    • pp.110-123
    • /
    • 2008
  • The objectives of this study are to define the fundamental notions of collaboration in design field. The results of this study are summarized as follows: Firstly, collaboration means a cooperative work which are cooperatively done by collabarator and collaboratee on the equal status within a certain period of time, based on core ability of each of them. This cooperative work is presented with a visual image based on the identity of participants, and it creates an added value. Collaboration is different from convergence and hybrid in the methodological aspects and from brand alliance and strategic alliance in the aspects of the subject of project. Secondly, collaboration has been developing through step of using the specific ability, step of sharing each core abilities, and step of fusing their identities, in a view of the sphere of cooperative work and the intimate relations in reciprocity. Thirdly, according to strategic purpose, collaboration can be classified into value ascending collaboration, image changing collaboration, business-field extension collaboration, and event collaboration. Fourthly, production methods of collaboration consist of limited edition method, premium line method, common line method, producing a collaborative product, and so on. Fifthly, differentiation effect, image upgrade effect, production of higher value-added products, sale increase, diversification of business, sharing the targets, and promotion effect are achievable through collaboration. Sixthly, to make progress in collaboration successfully, the compatibility of combination between collaborator and collaboratee, the superiority of collaboratee, definitude of collaboration, the fit method of collaboration, the novelty of collatoration, possibility of issuing of collaboration, and perfection of collabo-product must be the points which deserve our attention.

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

A Study for Establishing the Housing Welfare Delivery System in Incheon (주민자치센터의 주거복지 전달체계 구축 연구 - 인천시를 중심으로 -)

  • Park, Nam-Hee;Choi, Jae-Soon
    • Journal of the Korean housing association
    • /
    • v.20 no.1
    • /
    • pp.123-132
    • /
    • 2009
  • The purpose of this study was to establish the housing welfare delivery system in Incheon. Documentary research and content analysis methods and survey were used in this study. Data drawn from internet homepage of each community center, gu-office and city hall in Incheon. The major results of this study are as follows. 1) Related works of housing welfare are housing welfare facility management, self helf center, support service of housing life, residential environment management 2) Housing welfare delivery system consists of city, gu-office, community center order. There are many problems that the lack of experts and department of housing welfare and inconsistent works. 3) There should be optimize the related works of housing welfare in order to increase of efficiency of works and to prevent overload to public servant. 4) Housing welfare delivery system needs to co-work through collaborative network in order to realize welfare society. And each main groups have to establish their horizontal relationships.

Design and Implementation of an Agent-based Schedule Management System for Collaborative Work on the Web (웹 상에서 동작하는 에이전트 기반 일정 관리 시스템의 설계 및 구현)

  • 유재홍;성미영;채진석
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10b
    • /
    • pp.218-220
    • /
    • 1999
  • 이 논문은 웹 상에서 동작하며 지능을 가지는 에이전트의 도움을 받아 효율적으로 일정을 관리할 수 있도록 도와주는 일정 관리 시스템의 설계 및 구현에 대해 기술한다. 이 시스템은 멀티 에이전트 구조를 가지고 있으며, 에이전트들 간의 통신을 위해서는 KQML(Knowledge Query and Manipulation Language)을 사용하고 있다. 이것은 시스템에 유연성과 적응성을 제공해 주며, 새로운 에이전트를 추가할 때 에이전트들 간의 이형질성을 극복할 수 있도록 해준다. 또한, 웹 환경을 이용함으로써 클라이언트 프로그램을 따로 설치할 필요없이 어느 곳에서나 웹 브라우저를 이용하여 협동작업을 수행할 수 있다.

  • PDF

CoSpace : A Web-based Collaborative Environment Supporting Shared Workspaces (CoSpace : 공유작업공간을 지원하는 웹 기반 공동작업환경)

  • 정수권;김규완;김인호;한천용;이명준
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10b
    • /
    • pp.227-229
    • /
    • 1999
  • 과거 대부분의 CSCW(Computer-Supported Cooperative Work) 시스템은 특정 플랫폼에 의존하여 개발되었기 때문에 일반적으로 해당 플랫폼 환경이 구축되어진 조직 내에서만 사용이 가능하였다. 최근 어디서나 접근 가능할 수 있도록 플렛폼에 독립적인 환경을 지원하는 웹의 급속하고도 지속적인 성장에 따라 많은 CSCW 시스템들이 웹 환경을 통하여 사용할 수 있도록 구축되었고 또한 현재 개발중에 있다. 본 논문에서는 그러한 웹 기반 CSCW 시스템인 CoSpace 시스템의 설계와 구현에 대해 기술한다. CoSpace 시스템은 작업 그룹의 구성원들이 공동작업을 위해 웹 브라우저를 사용하여 정보를 쉽게 공유할 수 있는 공유 작업공간을 지원한다.

  • PDF

A Design and Implementation of the Messenger System Supporting Effective Collaborative Work on CoDocs. (CoDocs 시스템의 효과적인 공동작업 지원을 위한 메신저 시스템의 설계 및 구현)

  • 김인호;정수권;한천용;박양수;이명준
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10b
    • /
    • pp.295-297
    • /
    • 1999
  • 인터넷에 대한 사용자의 관심이 증가하면서 WWW에 관련된 기술이 급격히 증가하고 있다. 이러한 웹을 기반으로 하는 작업은 분산되어 있는 작업그룹의 여러 사용자들이 공동의 프로젝트에 관하여 효율적으로 공동작업을 하기에 충분한 기반환경을 제공할 수 있다. CoDocs 시스템은 웹에서 공동작업을 하는 작업그룹의 사용자들이 서로의 정보를 공유하고 교환함으로써 효율적으로 공동작업을 할 수 있는 기반 환경을 제공한다. 그러나, 이러한 CoDocs 시스템에서는 각 작업그룹 사용자들이 서로간의 의사전달을 위해 다지 비동기적인 통신 방법을 제공하고 있을 뿐 실시간적인 통신 방법을 갖추고 있지 않다. 하지만 보다 효과적인 공동작업을 위해서는 각 작업그룹의 사용자들간에 실시간으로 의사전달을 하고 서로의 정보를 교환하여 공유할 수 있는 통신 수단을 필요로 한다. 본 논문에서는 CoDocs 시스템에서 각 작업그룹 사용자들간에 이루어질 수 있는 실시간 의사전달 및 정보 교환을 가능하게 함으로써 공동작업을 효율적으로 지원할 수 있는 메신저 시스템을 설계하고 구현하였다.

  • PDF

Engineering Change of Products Using Workflow Management Based on the Parameters Network (파라미터 네트워크 기반의 워크플로를 적용한 제품의 설계 변경)

  • Yang, Jeongsam;Goltz, Michael;Han, Soonhung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.29 no.2
    • /
    • pp.157-164
    • /
    • 2003
  • The amount of information increases rapidly when working in a distributed environment where multiple collaborative partners work together on a complex product. Today's PDM (product data management) systems provide good capabilities regarding the management of product data within a single company. However, taking into account the variety of systems used at partner sites in an engineering environment one can easily imagine problems regarding the interoperability and the data consistency. This paper presents a concept to improve the workflow management using the parameters network. It shows a parameter driven engineering workflow that is able to manage engineering task across company boarders. We introduce a mechanism of workflow management based on the engineering parameters and an architecture of the distributed workspace to apply it within a PDM system. For a parameter mapping between CAD and PDM system we developed an XML-based CATIA data interface module using CAA.

A Method for Local Collision-free Motion Coordination of Multiple Mobile Robots

  • Ko, Nak-Yong;Seo, Dong-Jin;Kim, Koung-Suk
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1609-1614
    • /
    • 2003
  • This paper presents a new method driving multiple robots to their goal position without collision. To consider the movement of the robots in a work area, we adopt the concept of avoidability measure. To implement the concept in collision avoidance of multiple robots, relative distance between the robots is proposed. The relative distance is a virtual distance between robots indicating the threat of collision between the robots. Based on the relative distance, the method calculates repulsive force against a robot from the other robots. Also, attractive force toward the goal position is calculated in terms of the relative distance. The proposed method is simulated for several cases. The results show that the proposed method steers robots to open space anticipating the approach of other robots. The proposed method works as a local collision-free motion coordination method in conjunction with higher level of task planning and path planning method for multiple robots to do a collaborative job.

  • PDF

Internet Based Managing Design and Production Processes in a Distributed Global Environment (인터넷 기반 디자인 및 생산지원 분산환경 프로세스관리 기법 연구)

  • 박화규
    • The Journal of Information Systems
    • /
    • v.9 no.1
    • /
    • pp.217-234
    • /
    • 2000
  • This paper is to develop an information infrastructure to support managing process in design, planning, production, and quality control. Multi-media data set of design, product, and management information flow between organizational units of a virtual enterprise. The process is the logical organization of people, technology and practices incorporated into work activities to make an end product. The core of the infrastructure is the enterprise framework which coordinates activities and controls the process. The proposed framework manages collaborative activities across space and time, and between users and computers who share information in virtual community. It utilizes knowledge distributed through virtual community and fosters cooperation between organizations. The framework provides the following facilities; coordinating activities, sharing data and processes, visualizing multi-media data, customizing and updating processes, reusing data and processes. This paper covers design and manufacturing activities but our focus is initially targeted at design area.

  • PDF