International Journal of Aerospace System Engineering
/
v.2
no.1
/
pp.18-23
/
2015
Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.
International journal of advanced smart convergence
/
v.10
no.3
/
pp.257-278
/
2021
As the definition of the vendor-oriented implementation method, which was utilized in adopting an ERP system, has been centered around the project construction business, it was difficult for the EPR adopting organization to systematically prepare ERP projects and have enough deliberative opportunities to change-related policies. Furthermore, this method does not have a fully standardized construction process. Accordingly, by defining an organization that wants to adopt an ERP system as a customer, this paper develops the customer-based ERP construction process framework that assists both customers and developers who construct the system. For this purpose, this paper reviews the previous research and collects the construction processes of the commercial ERP SW vendor and ERP construction cases while proposing the three-layer process framework to construct ERP through the KJ method. The ERP process framework consists of 7 processes, 32 activities, 141 tasks while providing definitions for concepts of each component. Furthermore, the proposed processes and phases were set in order of the recommended execution, while the activities were suggested as an open-ended type so that the application and usability can be increased and polished by reflecting experts' opinions. The contribution of this study is to standardize the ERP project process by transforming the previous supplier-based ERP construction method into the customer-based one while providing important procedure and activity frameworks that apply to diverse ERP solutions per vendor. At the same time, this study provides an theoretical foundation to develop the construction process for the customer -based Cloud ERP. In practice, At the beginning of the ERP system construction project, it provides communication or process tailoring tools for the stakeholder.
Lee, Dong-Jun;Hyun, Jin-Oh;Min, Sung Gyu;Lim, Ji-Yong;Shin, Min Cheol;Kwon, Suk Hyun
KSCE Journal of Civil and Environmental Engineering Research
/
v.44
no.2
/
pp.223-229
/
2024
The Ministry of Land, Infrastructure and Transport presented the "Construction Industry BIM Enforcement Guidelines Constructors Edition" to reflect the design BIM data in the construction stage. The enforcement guidelines were prepared with the aim of providing guidelines for detailed common implementation plans such as minimum BIM business methods and procedures necessary for ordering, designing, and construction stages for the full-scale BIM application in all fields of the construction industry. In this study, interference and design errors were examined based on the enforcement guidelines, and the application effects were grasped for various sites where equipment placement and operation plans were established. As a result, intuitive examination was possible by comparing the digital field 3D model and the planned model in one space, and the optimum equipment arrangement and operation plan were derived through simulation examination according to the execution stage.
Journal of the Korea Institute of Information and Communication Engineering
/
v.18
no.11
/
pp.2670-2677
/
2014
The technique of virtual machine construction using hypervisor such as Xen and KVM is mainly used for implementation of cloud computing infrastructure. This technique is efficient in allocating and managing resources compared to the existing operation methods. However it requires high resource usage when constructing virtual machines and results in wasting of resources when not using the allocated resources. Docker is a technique based on the container method to resolve such a problem. This paper shows the container method such as Docker is efficient as a web construction technique by comparing virtual machine method to container method. It is shown to be especially useful when storing data into DB or storage devices in such environments of web server or program development. In the upcoming cloud computing environment the container method such as Docker is expected to improve the resource efficiency and the convenience of management.
Recently, the cloud technology has made dynamical network changes by enabling the construction of a logical network without building a physical network. Despite recent research on the cloud, it is necessary to study security functions for the identification of fake virtual network functions and the encryption of communication between entities. Because the VNFs are open to subscribers and able to implement service directly, which can make them an attack target. In this paper, we propose a virtual public key infrastructure mechanism that detects a fake VNFs and guarantees data security through mutual authentication between VNFs. To evaluate the virtual PKI, we built a management and orchestration environment to test the performance of authentication and key generation for data security. And we test the detection of a distributed denial of service by using several AI algorithms to enhance the security in NFV.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.12
no.4
/
pp.153-159
/
2012
For the construction of safe and clear urban environment, it is necessary that we identify the rubbish waste volume and we know the accuracy volume. In this paper, we proposed the algorithm computes the waste volume periodically for the way of waste repository standard. After stereo camera calibration, we obtained the point cloud on the surface of the object and took this as the input of the calculation algorithm of the object volume. We proposed the volume calculation algorithms based on the non-uniform triangular meshing methods and verified the validity of the algorithm through simulation and real experiments. The proposed algorithm can be used not only as the volume calculation of the waste repository but also as the general volume calculation of a three dimensional object.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.2
/
pp.239-245
/
2020
Recently, BIM (Building Information Modeling) are widely being utilized in Construction industry. However, most structures that have been constructed in the past do not have BIM. For structures without BIM, the use of SfM (Structure from Motion) techniques in the 2D image obtained from the camera allows the generation of 3D model point cloud data and BIM to be established. However, since these generated point cloud data do not contain semantic information, it is necessary to manually classify what elements of the structure. Therefore, in this study, deep learning was applied to automate the process of classifying structural components. In the establishment of deep learning network, Inception-ResNet-v2 of CNN (Convolutional Neural Network) structure was used, and the components of bridge structure were learned through transfer learning. As a result of classifying components using the data collected to verify the developed system, the components of the bridge were classified with an accuracy of 96.13 %.
Due to the recent increasement of user created contents like SNS, blog posts, and so on, broadcast contents are actively re-construction by its users. Especially, on some genres like drama, movie, various information from cars and film sites to clothes and watches in a content is spreaded out to other users through blog postings. Since such information can be an additional information for the content, they can be used for providing high-quality broadcast services. For this purpose, in this paper, we propose timeline tag cloud generation method for broadcasting contents. In the proposed method, blog postings on the target contents are first gathered and then, images and words around images are extracted from a blog post as a tag set. An extracted tag set is tagged on a specific timeline of the target content. In experiments, to prove the efficiency of the proposed method, we evaluated the performances of the proposed image matching and tag cloud generation methods.
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.4
/
pp.559-569
/
2022
Infrastructure engineering is a field that supports construction (assembly) as a representative industry that creates high added value and jobs by combining science and technology with knowledge, though its importance is underestimated. According to a report from the Ministry of Land, Infrastructure and Transport (Korea), the value-added rate (65.3%) of the engineering industry and the employment inducement coefficient (14 employees per billion won) are three times higher than in manufacturing. In particular,the forward value chain (such as project management and basic design) accounts for less than 10~15% of the total project cost but determines the overall price and quality of the infrastructure facilities. In this study, a work break-down system, design support module and database development method for road design projects for design platform development is presented. Based on the presented development method, a cloud-based infrastructure design platform's prototype is developed. The developed infrastructure engineering platform is expected to provide a web-based design work environment without time/space restrictions and greatly contribute to winning overseas business orders and securing competitiveness.
Recently, as the amount of digital data increases exponentially, the importance of data processing systems is being emphasized. In this situation, the selection and construction of data processing systems are becoming more important. In this study, the performance of cloud computing (CC), edge computing (EC), and UAV-based intelligent edge computing (UEC) was compared as a way to solve this problem. The characteristics, strengths, and weaknesses of each method were analyzed. In particular, this study focused on real-time large-capacity data processing situations such as corridor monitoring. When conducting the experiment, a specific scenario was assumed and a penalty was given to the infrastructure. In this way, it was possible to evaluate performance in real situations more accurately. In addition, the effectiveness and limitations of each computing method were more clearly understood, and through this, the help was provided to enable more effective system selection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.