Am analytical Case Study on Measurement of Ground Vibration from Rock Blasting (암 발파 진동 측정 사례 분석)

  • Chung, Chul-Ho;Chung, Sang-Moon;Lee, Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.59-62
    • /
    • 1993
  • In this study, various problems of ground vibration from rock blasting have been discussed, and field tests of rock blasting-ground vibration were carried out to find out the system of evaluation and control method for selecting blast design values and the rationale for the selection. Criterla of estimating structural response and damage caused by ground vibration from rock blasting are also discussed for the safety design of blast.

  • PDF

Determination of equivalent blasting load considering millisecond delay effect

  • Song, Zhan-Ping;Li, Shi-Hao;Wang, Jun-Bao;Sun, Zhi-Yuan;Liu, Jing;Chang, Yu-Zhen
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.745-754
    • /
    • 2018
  • In the analysis of the effects of rock tunnel blasting vibration on adjacent existing buildings, the model of simplified equivalent load produces higher calculation result of vibration, due to the lack of consideration of the millisecond delay effect. This paper, based on the static force equivalence principle of blasting load, proposes a new determination method of equivalent load of blasting vibration. The proposed method, based on the elastic-static force equivalence principle of stress wave, equals the blasting loads of several single blastholes in the same section of millisecond blasting to the triangle blasting load curve of the exploded equivalent elastic boundary surface. According to the attenuation law of stress wave, the attenuated equivalent triangle blasting load curve of the equivalent elastic boundary is applied on the tunnel excavation contour surface, obtaining the final applied equivalent load. Taking the millisecond delay time of different sections into account, the time-history curve of equivalent load of the whole section applied on the tunnel excavation contour surface can be obtained. Based on Sailing Tunnel with small spacing on Sanmenxia-Xichuan Expressway, an analysis on the blasting vibration response of the later and early stages of the tunnel construction is carried out through numerical simulation using the proposed equivalent load model considering millisecond delay effect and the simplified equivalent triangle load curve model respectively. The analysis of the numerical results comparing with the field monitoring ones shows that the calculation results obtained from the proposed equivalent load model are closer to the measured ones and more feasible.

Prediction of Blasting-induced Vibration at Sintanjin Area, Daejeonusing Borehole Test Blasting (시추공 시험발파를 이용한 대전 신탄진 지역의 발파진동 예측)

  • Lee, Chung-Won;Park, Sung-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.55-62
    • /
    • 2018
  • Problems on vibration due to blasting for infrastructure development are getting important because of a civil appeal. Blasting-induced vibration is representative construction pollution, hence, it is possible that a number of environmental damages occur. In this study, borehole test blasting was conducted at Sintanjin area, Daejeon and square root equation with 95% confidence level was proposed for prediction of blasting-induced vibration. The vibration value predicted from this equation was more conservatively evaluated than the values predicted from U.S. Department of Interior, Bureau of Mines (USBM) and Nippon Oil & Fats Co., Ltd. (NOF) equations. Therefore, the proposed equation in this study seems to contribute for safety blast design. However, for optimal blast design, inducing equation for prediction of blasting-induced vibration through the identical test blasting with field construction such as rock slope blasting would be required.

A Study on the Efficiency of Horizontal Direction Deck-charge Blasting Method Using Electronic Detonator (전자뇌관을 이용한 수평방향 데크차지 발파공법의 효율성검토 연구)

  • Yoon, Ji-Sun;Hahn, Suk-Ju;Bae, Sang-Hun
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • In close to downtown construction, the main problem is complaints caused by blasting vibration and noise. To reduce blasting vibration and noise, deck-charge blasting method using electronic detonator can be more secure because there is no cut-off problem. And in this method it is possible to blast in horizontal direction. In this study, the efficiency of horizontal direction deck-charge blasting method using electronic detonator is compared to that of the existing blasting method. And the possibility of applying the construction site is evaluated. As a result, the reduction of blasting vibration, noise and secondary breaking has been determined, as well as large-scale blasting in the vibration criterion can be regulated by the overall increase in blasting efficiency.

Prediction for Measurement Range of Vibration due to Blasting of Underground Tunneling (발파 진동으로 인한 지표면 진동 계측 범위 산정에 대한 연구)

  • Kong, Suk-Min;Byun, Yoseph;Choi, Sang-Il;Kim, Jeong-Heum;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.7-17
    • /
    • 2024
  • Vibrations were measured at the surface of a GTX-A site to assess the impact of blasting on underground tunneling. A numerical analysis was conducted using the same ground and blast conditions as those at the site, accompanied by a comparative analysis of other GTX-A sites. This analysis determined the maximum vibration velocity at regular intervals directly above the blasting point at each site. The results were compared with domestic and international vibration standards to establish the vibration measurement range. The specified vibration measurement locations in domestic regulations—"measuring from the closest part of the structure's foundation to the blasting source, and if conditions make it impossible, measuring from the nearest surface to it"—were evaluated. Furthermore, this study underscores the significance of considering the tunnel drilling depth and soil conditions when selecting a vibration measurement location.

A Case Study to Minimize Effect of Blasting Vibration and Noise on Animal Casualties (발파진동과 소음이 가축에 미치는 영향에 관한 사례연구)

  • 안명석;김종대;황소중
    • Journal of KSNVE
    • /
    • v.11 no.1
    • /
    • pp.104-110
    • /
    • 2001
  • The demand of blasting work in civil engineering work is increasing because of the increasing social infra-structural construction work. The blasting method creates large benefit in regard to the economic aspect and shortening construction period. This method, however, has problems to be solved in respect to the blasting vibration and noise. Blasting vibration and noise have been studied by many workers, regarding to the impact on the structure and human body. This investigation is concerned on the affect of blasting vibration and noise on the animals which is relatively new. In general, animals have inferior mental capacity than human in hearing but have higher sensitivity on the vibration and noise due to blasting. The object of this study is to investigate an appropriate measurement of lessening damage on the animals by vibration and noise due to blasting.

  • PDF

A Study of a Pilot Test for a Blasting Performance Evaluation Using a Dry Hole Charged with ANFO (건공화 공법의 발파 성능 평가를 위한 현장 시험에 관한 연구)

  • Lee, Seung Hun;Chong, Song-Hun;Choi, Hyung Bin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.197-208
    • /
    • 2022
  • The existence of shallow bedrock and the desire to use underground space necessitate the use of blasting methods. The standard blasting method under water after drilling is associated with certain technical difficulties, including reduced detonation power, the use of a fixed charge per delay, and decoupling. However, there is no blasting method to replace the existing blasting method. In this paper, a dry hole charged with ANFO blasting is assessed while employing a dry hole pumping system to remove water from the drill borehole. Additional standard blasting is also utilized to compare the blasting performances of the two methods. The least-squares linear regression method is adopted to analyze the blasting vibration velocity quantitatively using the measured vibration velocity for each blasting method and the vibration velocity model as a function of the scaled distance. The results show that the dry hole charged with ANFO blasting will lead to greater damping of the blasting vibration, more energy dissipation to crush the surrounding rock, and closer distances for the allowable velocity of the blasting vibration. Also, standard blasting shows much longer influencing distances and a wider range of the blasting pattern. The pilot test confirms the blasting efficiency of dry hole charged with ANFO blasting.

Effects of free surface using waterjet cutting for rock blasting excavation (워터젯 자유면을 이용한 암반발파 굴착공법의 효과)

  • Oh, Tae-Min;Cho, Gye-Chun;Ji, In-Taeg
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.49-57
    • /
    • 2013
  • The conventional blasting method generates serious blasting vibration and underbreak/overbreak in spite of its high efficiency for rock excavation. To overcome these disadvantages, this paper introduces an alternative excavation method that combines the conventional blasting process with the free surface on the perimeter of the tunnel face using waterjet cutting technology. This proposed excavation method has advantages of (1) reducing vibration and noise level; (2) minimizing underbreak and overbreak; and (3) maximizing excavation efficiency. To verify the effects of the proposed excavation method, field tests were performed with a smooth blasting method at the same excavation conditions. Test results show that the vibration is reduced by up to 55% and little underbreak/overbreak is generated compared with the smooth blasting method. In addition, the excavation efficiency of the proposed method is greater than that of the smooth blasting method. The proposed blasting method with a free surface using waterjet cutting can be applied to urban excavation construction as well as to underground structure construction.

Water Wave Propagation Caused by Underwater Blasting in a 3D Numerical Wave Tank (3차원 수치파동수조에서 수중발파에 의한 수면파의 전파해석)

  • Lee, Woo-Dong;Jeong, Yeon-Myeong;Choi, Kyu-Nam;Hur, Dong-Soo
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.4
    • /
    • pp.364-376
    • /
    • 2019
  • When underwater blasting is conducted, both shock waves and water waves have an effect on adjacent coastal areas. In this study, an empirical formula for estimating the details of water waves caused by underwater blasting was applied to a non-reflected wave generation system, and a 3D numerical wave tank (NWT) was improved to reproduce the generation and propagation of such water waves. The maximum elevations of the propagated water waves were comparatively analyzed to determine the validity and effectiveness of the NWT. Good agreement was demonstrated between the empirical and simulation results. The generation and propagation of water waves were also simulated under each underwater blasting scenario for the removal of the Todo islet at the Busan Newport International Terminal (PNIT). It was determined that the water waves generated by the underwater blasting scenario examined in this study did not have a significant impact on the PNIT. In addition, multiple-charge blasting caused higher wave heights than single-charge blasting. As the amount of firing charge increased, the wave height also increased. Finally, larger water waves were generated during the later blasting conducted at a deeper depth as compared with an earlier blasting conducted at a relatively shallow depth.