This paper proposes a fuzzy dual method for analyzing long-term transmission system expansion planning problem considering ambiguities of the power system using fuzzy lineal programming. Transmission expansion planning problem can be formulated integer programming or linear programming with minimization total cost subject to reliability (load balance). A long-term expansion planning problem of a grid is very complex, which have uncertainties fur budget, reliability criteria and construction time. Too much computation time is asked for actual system. Fuzzy set theory can be used efficiently in order to consider ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system in this paper. This paper presents formulation of fuzzy dual method as first step for developing a fuzzy Ford-Fulkerson algorithm in future and demonstrates sample study. In application study, firstly, a case study using fuzzy integer programming with branch and bound method is presented for practical system. Secondly, the other case study with crisp Ford Fulkerson is presented.
The KIER's Korean historical earthquake catalog was revised for MMI${\geq}$VI events recorded from the years 27 A.D. to 1904. the magnitude of each event was directly determined from the criteria suggested by Seo. The criteria incorporated the damage phenomena of the Japanese historical earthquake catalog, recent seismological studies, and the results of tests performed on ancient structures in Korea. Thus, the uncertainty of the magnitudes of the Korean historical earthquakes can be reduced. Also, the Gutenberg-Richter parameter values were estimated based on the revised catalog of this study. It was determined that the magnitudes of a maximum inland and minimum offshore event were approximately 6.3 and 6.5, respectively. The Gutenberg-Richter parameter pairs of the historical earthquake catalog were estimated to be a=5.32${\pm}$0.21, b=0.95${\pm}$0.19, which were somewhat lower than those obtained from recent complete instrumental earthquakes. No apparent change in the Gutenberg-Richter parameter is observed for the $16^{th}-17^{th}$ centuries of the seismically active period.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
2009.04a
/
pp.218-228
/
2009
The basic law about disaster and safety management and the fire fighting law state that the central government and the local governments are responsible for protecting the life and assets of the people. The well-fare developed nations have developed and are implementing diverse safety programs with making safe cities as their prime objective. Our nation has not yet practiced such actions. However, it is in demand to evaluate what safety policies are practiced by local governments for the people and to inform the people of those. Therefore, this research developed and suggests the assessment criteria and the assessment method to evaluate the safety level of a city by assessing the safety of buildings and facilities.
Seismic safety evaluation of weir structure is significant considering the catastrophic economical consequence of operational disruption. In recent years, the seismic probabilistic risk assessment (SPRA) has been issued as a key area of research for the hydraulic system to mitigate and manage the risk. The aim of this paper is to assess the seismic probabilistic risk of weir structures employing the seismic hazard and the structural fragility in Korea. At the first stage, probabilistic seismic hazard analysis (PSHA) approach is performed to extract the hazard curve at the weir site using the seismic and geological data. Thereafter, the seismic fragility that defines the probability of structural collapse is evaluated by using the incremental dynamic analysis (IDA) method in accordance with the four different design limit states as failure identification criteria. Consequently, by combining the seismic hazard and fragility results, the seismic risk curves are developed that contain helpful information for risk management of hydraulic structures. The tensile stress of the mass concrete is found to be more vulnerable than other design criteria. The hazard deaggregation illustrates that moderate size and far source earthquakes are the most likely scenario for the site. In addition, the annual loss curves for two different hazard source models corresponding to design limit states are extracted.
The purpose of this study is to propose a methodology for estimating greenhouse gas emission reduction through HFCs used in the foam industry. This study investigated characteristics of HFCs and greenhouse gas emissions from production processes in the foam industry, which uses HFCs as a blowing agent. Also, we investigated fluorinated gas removal technology to determine a proper technology for the foam industry. And we confirmed the criteria and characteristics of External Project for methodology development. According to criteria of External Project and foam industrial process emission, a methodology for calculating the amount of greenhouse gas emission reduction in foam industry was developed. Lastly, we analyzed the amount of greenhouse gas emission reduction and KOC (Korea Of Offset) in the foam industry based on the domestic government's plan to reduce HCFCs and imported amount of HFCs used as a blowing agent. The results of this study demonstrate that linking greenhouse gas reduction in the foam industry and the domestic greenhouse gas reduction system can contribute to achieve the domestic greenhouse gas reduction goal.
Jung, Soonjae;Kim, Jung Young;Han, Sang Jin;Seo, Youngbeom;Lee, Kyo Chul;Ryu, Young Hoon;Choi, Jae Yong
Journal of Radiopharmaceuticals and Molecular Probes
/
v.5
no.1
/
pp.48-53
/
2019
A bone metastasis is an important factor for prognosis and treatment of breast or prostate cancer patients. [$^{18}F$]Sodium fluoride ([$^{18}F$]NaF) is a PET radiopharmaceutical that can detect bone metastasis. Conventional [$^{18}F$]NaF production process included radioactive metal impurities because the product was prepared by adding saline after beam irradiation to $[^{18}O]H_2O$. In this study, we apply the method of removing radionuclidic impurities. To meet the criteria prescribed by GMP in quality control, we designed the custom-made [$^{18}F$]NaF automatic module. The mean radiochemical yield was $82.1{\pm}4.4%$ (n = 32) productions for 3 years) and the total preparation time was 4 min. The final produced [$^{18}F$]NaF solution meets the USP criteria for quality control. Thus, this fully automated system is validated for clinical use.
As the prefabricated shoring system structure, which is a temporary structure, is often collapsed due to various reasons during concrete pouring, and directly affects not only the safety of the workers but also the quality of the final building, it is necessary to ensure the safety. It is considered that the pipe supports which are widely used as the prefabricated shoring materials in the construction site do not satisfy the performance criteria in many cases. Therefore, this study investigated the detailed conditions for satisfying the performance criteria and suggested the factors for improving the quality control level in order to prevent collapse accidents due to pipe supports reused at the construction site, As the results of test in order to understand the effect of the pipe supports (V2), which are being reused in the field, on the performance by factor, the performance was evaluated to be high in case of the small female screw clearance and the supporting pin with 12mm in diameter or larger.
Journal of The Korea Institute of Healthcare Architecture
/
v.27
no.2
/
pp.7-14
/
2021
Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.
In this paper we attempt to read a film by Haejoon LEE entitled 'Castaway on the moon' from the Bauman's modernity perspective that draws our attention to uncomfortable problems relative to wastes and wasted lifes in the global consumer society we all live in. The so-called consumer society is a post-modern society designed according to the following two criteria: on the one hand, beauty and ugliness and on the other hand, competence and incompetence. Classified as ugly as well as incompetent in this society, the two heros in this film are condemned to live their lifes isolated. Miss Kim is confined to her small room while Mr. Kim is exiled to an uninhabited island called 'Bamsum' in the Han River. In these spaces, neither inside nor outside, they perform what we would like to call 'surplus act', using wastes at their disposal. In this paper we ask ourselves whether or not this act is able to challenge the two criteria and the solidarity of the two wasted lifes can bring about change in the consumer oriented society. As well as Bauman, Agamben will help us approach this question from a theoretical point of view.
As the technology of Smart City and Digital Twin is developing, techniques to integrate BIM data of infrastructure facilities into GIS are becoming more critical. Hence, this study aims to manage BIM data representing bridge and tunnel structures through the Industry Foundation Classes (IFC) standard and to develop a method to link these IFC-compliant files to the GIS standard CityGML without loss of information. We analyze the criteria for creating BIM data for bridges and tunnels by reviewing the BIM guidelines set by each client. We use these criteria to suggest methods for data management based on InfraBIM as a specific IFC class standard. Furthermore, we perform model analysis to determine the necessary design and construction field-appropriate model process and Level of Detail (LOD). From the model analysis, we conclude that the classified BIM models can be used as base data to generate BIM models of bridges and tunnels for facility management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.