• Title/Summary/Keyword: Charge simulation method

Search Result 244, Processing Time 0.032 seconds

A Study on the Energy Efficiency of a Geothermal Heat Pump System in use the Outdoor Reset Control Application (외기보상제어 적용에 따른 지열 히트펌프 시스템의 에너지 효율 향상에 관한 연구)

  • Jung, Young-Ju;Kim, Hyo-Jun;Lee, Yong-Ho;Hwang, Jung-Ha;Cho, Young-Hum
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.1
    • /
    • pp.45-52
    • /
    • 2015
  • The government is fostering a renewable energy industry as an alternative to handle the energy crisis. Among the renewable energy systems available, geothermal energy is being highlighted as being highly efficient and safely operable without the effect of outdoor air. Accordingly, a study on the geothermal heat pump is in progress in various worldwide perspective. However, Geothermal energy is only in charge of part load of the building due to the high initial installation cost in korea. Moreover, its efficiency is reduced due to the use of independent existing heat sources. In this study, after selecting the building containing the actual installed geothermal heat pump, the use of excellent geothermal heat pump systems was maximized in terms of the energy efficiency. The objective of this study is to show the operation method of geothermal heat pump system to improve energy efficiency through the TRNSYS simulation. This paper proposed operation methods of geothermal heat pump control according to outdoor air temperature. The result of this study is that existing operation method had some problems and if offered improvement is applied to real condition, energy consumption would be decreased.

A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation (몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구)

  • Kim, Jong-Rok;Jung, Young-Han;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.

Simulation and Evaluation of the KOMPSAT/OSMI Radiance Imagery (다목적 실용위성 해색센서 (OSMI)의 복사영상에 대한 모의 및 평가)

  • 반덕로;김용승
    • Korean Journal of Remote Sensing
    • /
    • v.15 no.2
    • /
    • pp.131-146
    • /
    • 1999
  • The satellite visible data have been successfully applied to study the ocean color. Another ocean color sensor, the Ocean Scanning Multi-spectral Imager (OSMI) on the Korea Multi-Purpose Satellite (KOMPSAT) will be launched in 1999. In order to understand the characteristics of future OSMI images, we have first discussed the simulation models and procedures in detail, and produced typical patterns of radiances at visible bands by using radiative transfer models. The various simulated images of full satellite passes and Korean local areas for different seasons, water types, and the satellite crossing equator time (CET) are presented to illustrate the distribution of each component of radiance (i.e., aerosol scattering, Rayleigh scattering, sun glitter, water-leaving radiance, and total radiance). A method to evaluate the image quality and availability is then developed by using the characteristics of image defined as the Complex Signal Noise Ratio (CSNR). Meanwhile, a series of CSNR images are generated from the simulated radiance components for different cases, which can be used to evaluate the quality and availability of OSMI images before the KOMPSAT will be placed in orbit. Finally, the quality and availability of OSMI images are quantitatively analyzed by the simulated CSNR image. It is hoped that the results would be useful to all scientists who are in charge of OSMI mission and to those who plan to use the data from OSMI.

Analysis of Distributed Computational Loads in Large-scale AC/DC Power System using Real-Time EMT Simulation (대규모 AC/DC 전력 시스템 실시간 EMP 시뮬레이션의 부하 분산 연구)

  • In Kwon, Park;Yi, Zhong Hu;Yi, Zhang;Hyun Keun, Ku;Yong Han, Kwon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.159-179
    • /
    • 2022
  • Often a network becomes complex, and multiple entities would get in charge of managing part of the whole network. An example is a utility grid. While the entire grid would go under a single utility company's responsibility, the network is often split into multiple subsections. Subsequently, each subsection would be given as the responsibility area to the corresponding sub-organization in the utility company. The issue of how to make subsystems of adequate size and minimum number of interconnections between subsystems becomes more critical, especially in real-time simulations. Because the computation capability limit of a single computation unit, regardless of whether it is a high-speed conventional CPU core or an FPGA computational engine, it comes with a maximum limit that can be completed within a given amount of execution time. The issue becomes worsened in real time simulation, in which the computation needs to be in precise synchronization with the real-world clock. When the subject of the computation allows for a longer execution time, i.e., a larger time step size, a larger portion of the network can be put on a computation unit. This translates into a larger margin of the difference between the worst and the best. In other words, even though the worst (or the largest) computational burden is orders of magnitude larger than the best (or the smallest) computational burden, all the necessary computation can still be completed within the given amount of time. However, the requirement of real-time makes the margin much smaller. In other words, the difference between the worst and the best should be as small as possible in order to ensure the even distribution of the computational load. Besides, data exchange/communication is essential in parallel computation, affecting the overall performance. However, the exchange of data takes time. Therefore, the corresponding consideration needs to be with the computational load distribution among multiple calculation units. If it turns out in a satisfactory way, such distribution will raise the possibility of completing the necessary computation in a given amount of time, which might come down in the level of microsecond order. This paper presents an effective way to split a given electrical network, according to multiple criteria, for the purpose of distributing the entire computational load into a set of even (or close to even) sized computational loads. Based on the proposed system splitting method, heavy computation burdens of large-scale electrical networks can be distributed to multiple calculation units, such as an RTDS real time simulator, achieving either more efficient usage of the calculation units, a reduction of the necessary size of the simulation time step, or both.

Numerical Analysis of Intense Electric Current Pulse to Disperse Shaped Charge Metal Jet (성형작약탄 금속제트 산란을 위한 대전류 펄스의 수치해석적 연구)

  • Park, Hyeong Gyu;Kim, Dong Kyu;Kim, Si Woo;Joo, Jae Hyun;Song, Woo Jin;Kim, Jeong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.1
    • /
    • pp.55-62
    • /
    • 2015
  • The electromagnetic force induced by an intense electric current pulse, which generates an electromagnetic field around the metal jet originating from a shaped charge, can disperse and scatter the high-speed metal jet. An electric device consisting of an RLC circuit applies an intense electric current pulse that flows in the circuit while the metal jet passes between two electrodes. In this study, the metal jet formation was simulated using the ALE technique in 2-D, and a 3-D finite element model was mapped using 2-D simulation results to induce the electric current directly. The deformed shapes of the metal jet and the electromagnetic force were calculated using a finite element analysis by inducing the electric current directly, and the major parameters of the intense electric current pulse for breaking up the metal jet were examined.

Operation Method of Power Supply System for Eco-friendly Movable-weir Based on Natural Energy Sources (자연에너지를 이용한 친환경 가동보용 전원공급시스템의 운용방안)

  • Kwon, Pil-June;Lee, Hu-Dong;Tae, Dong-Hyun;Park, Ji-Hyun;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.601-610
    • /
    • 2020
  • Recently, damage caused by drought is becoming worse and worse due to the global climate change. To overcome these problems, movable-weir to control the water level has been installed instead of a fixed-weir made from concrete. On the other hand, it is difficult to operate an existing moveable-weir because of the high cost of facility management and manpower consumption. In addition, because most moveable-weirs are installed in power systems, the operating cost and the cost of connection for power systems increase when they are located in remote areas. Therefore, this paper proposes an optimal design algorithm and the evaluation algorithm of the SOC (state of charge) of a lithium-ion battery to replace an existing power supply with eco-friendly movable-power with a power supply system using PV modules and lithium-ion batteries. In addition, this study modeled a 50kW power supply system of a movable-weir using PSCAD/EMTDC S/W. The simulation results confirmed that the proposed algorithm has stable operation characteristics in an independent operation mode and interconnection operation mode and that there is the possibility of commercialization with a benefits evaluation of the eco-friendly power supply system of a movable-weir.

Efficient Content Sharing using the Selection of Minimum Forwarding Peers in an Ad Hoc Network (최소의 Forwarding Peer 선택을 통한 애드 혹 네트워크에서의 효율적 콘텐츠 분배 방법)

  • Kang, Seung-Seok
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.4
    • /
    • pp.165-173
    • /
    • 2009
  • Recent portable devices are so versatile that they have multiple communication channels and play several multimedia formats. Especially, many services are under development for users who connect Internet or nearby devices via WWAN (Wireless Wide Area Network) and/or WLAN (Wireless LAN). In case of paying the telecommunication cost proportional to the amount of data downloaded, it is necessary to reduce the cost by constructing a special ad hoc network in which each participating peer downloads a specific portion of the want-to-be-shared content over the payable WWAN channel and exchanges the remaining portion with other peers using the cost-free WLAN channel. If all peers participate in forwarding packets, some transmissions are redundant which results in the unnecessary consumption of bandwidth as well as the delayed content distribution time. In order to reduce the redundant transmission, this paper proposes both the excluding method which discourages some peers not to forward redundant packets, and the minimum cover set method in which only the minimum number of peers are in charge of forwarding packets. These two methods obviate redundant packet forwarding, and result in reduction of content distribution time by up to around 29%.

Sparkover Voltage Estimation of Standard Sphere Gaps for Negative Polarity by Calculation of Ionization Index

  • Nishikori, Yasuo;Kojima, Soji;Kouno, Teruya
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • v.4C no.2
    • /
    • pp.45-50
    • /
    • 2004
  • The field utilization factor (equation omitted) (the mean electric field / the maximum electric field) of standard sphere gaps was calculated by the charge simulation method, taking into account the ground plane and shanks. n changes mainly with g/r and slightly with 1$_1$, 1$_2$ and 1, where D=2r is the sphere diameter, g is the gap length, 1$_1$ and 1$_2$, respectively, are the lengths of the upper and lower shank, and t is the shank diameter. Generally, (equation omitted) increases as 1$_1$,1$_2$ and t each becomes larger. IEC standard 60052(2002) limits t$\leq$0.2D 1$_1$$\geq$1D and prescribes A=1$_2$+D+g where A is the height of the spark point on the upper sphere. Therefore, (equation omitted) is the largest when A=9D and the smallest when A=3D. The simple equation of a straight line, (equation omitted)=1- (g/3r), can generally be used as a representative value of (equation omitted) for a wide variety of sphere diameters that are permitted by the IEC standard. The maximum electric field E$_{m}$ at sparkover of standard air gaps has also been calculated by the relation E$_{m}$=V/(equation omitted)g). E$_{m}$ describes a U-curve for g/r, up to the sphere diameter of 1 m. Moreover, for 1.5-m and 2-m diameters and especially .for negative polarity, sparkover voltages have been calculated by integration of the ionization index.index.

Improved DC-DC Bidirectional Converter (개선된 DC-DC 양방향 컨버터)

  • Kim, Seong-Hwan;Hur, Jae-Jung;Jeong, Bum-Dong;Yoon, Kyoung-Kuk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.76-82
    • /
    • 2017
  • Since the introduction of electronically controlled engines and electric propulsion ships, the need for an uninterruptible power supply for emergency power supply devices that use batteries has gained importance. The bidirectional converter in such emergency power supply devices is a crucial component. This paper proposes, a topology for an improved DC-DC bidirectional converter that is characterized by a high voltage conversion ratio and low voltage stress of switches. To confirm the performance of the converter, a computer simulation was executed with PSIM software. The conversion ratio of the proposed converter was found to be four times higher than the conventional boost converter in step-up mode and one-fourth that of the conventional buck converter in step-down mode, and the voltage stress of the switches was one-fourth of the high-side voltage. Moreover, the proposed converter was confirmed to be able to distribute equal currents between two interleaved modules without using any extra current-sharing control method because of the charge balance of its blocking capacitors.

Numerical Simulation of Tunnel Blasting (수치모형에 의한 터널발파 시뮬레이션에 관한 연구)

  • 박정주;박의섭
    • Tunnel and Underground Space
    • /
    • v.11 no.4
    • /
    • pp.344-351
    • /
    • 2001
  • In the tunnelling by blasting, the calculations of charge weight and the estimations of blasting effect have been simply carried out by empirical formulas. Also, it has been rare to consider the impact energy of blasting in numerical analyses. Thus in this study a numerical modeling technique of blasting load is developed and used with the 2 dimensional distinct element method(DEM) to consider the nonlinear behaviour of discontinuous underground structures. TD examine and verify its applicability of the numerical model to actual problems, a blasting of tunnel under an embankment is numerically analysed with DEM. It is examined that the behavior of circumference structures, the displacements of above- and under-ground structures, and the propagation of particle velocities can be known by this numerical analysis. As a result, the blasting load model, proposed by this study, can be applied to actual problems. This model applied with DEM can be used in the examination of structural stability.

  • PDF