• Title/Summary/Keyword: Changwon Industrial Complex

Search Result 53, Processing Time 0.018 seconds

Evaluation of Heavy Metal Contamination for Bongam Tidal Flat Sediments in Masan Bay, Korea (마산만 봉암갯벌 퇴적물의 중금속 오염도 평가)

  • Lee, Chan-Won;Jeon, Hong-Pyo;Lee, Sung-Jin
    • Journal of Wetlands Research
    • /
    • v.12 no.3
    • /
    • pp.15-20
    • /
    • 2010
  • The contamination loadings generated in Changwon City are coming into Masan Bay through the Bongam tidal flat except the loadings collected and transferred by sewer lines to the wastewater treatment plant. The recovery of waterbirds, shellfishes, and fishes has been quite well recognized in recent years after the first implementation of Masan Bay TPLM (Total Pollution Loads Management) in Korea. This tidal flat has been conserved by the cooperation of several stakeholders and utilized as an ecosystem field site for in situ education. A large industrial complex has been operated since 1970's, therefore increasing the level of pollutants in estuary and costal sediments, especially by heavy metals. Zinc, copper, and lesd contamination of sediment was revealed at higher level by Clean-up guideline (MOMAF) or heavily polluted level by SQC (USEPA). There was a significant difference between two sites at the 95% confidence level, which implies no homogeneity in the processes of transport and deposition even at 500 m of distance. The heavy metal concentrations in the Bongam sediments have been gradually decreased with comparing the data of 2006, and 2009.

Structural Analysis of the fcbABC Gene Cluster Responsible for Hydrolytic Dechlorination of 4-Chlorobenzoate from pJS1 Plasmid of Comamonas sp. P08

  • Lee, Jeong-Soon;Lee, Kyoung;Ka, Jong-Ok;Jong-Chan;Kim, Chi-Kyung
    • Journal of Microbiology
    • /
    • v.41 no.2
    • /
    • pp.89-94
    • /
    • 2003
  • Bacterial strain No. P08 isolated from wastewater at the Cheongju industrial complex was found to be capable of degrading 4-chlorobenzoate under aerobic condition. P08 was identified as Comamonas sp. from its cellular fatty acid composition and 16S rDNA sequence. The fcb genes, responsible for the hydrolytic dechlorination of 4-chlorobenzoate, were cloned from the plasmid pJJl of Comamonas sp. P08. The fcb gene cluster of comamonas sp. PO8 was organized in the order fcbB-fcbA-fcbTl-fcbT2-fcbT3-fcbC. This organization of the fcb genes was very similar to that of the fcb genes carried on the chromosomal DNA of pseudomonas sp. DJ-12. However, it differed from the fcbA-fcbB -fcbC ordering of Arthrobacter sp. SU. The nucleotide sequences of the fcbABC genes of strain P08 showed 98% and 53% identities to those of Pseudomonas sp. DJ-12 and Arthrobacter sp. SU, respectively. This suggests that the fcb genes might have been derived from Pseudomonas sp. DJ-12 to form plasmid pJSl in Comamonas sp. P08, or that the fcb genes in strain DJ-12 were transposed from Comamonas sp. P08 plasmid.

A Study on the Calculation of Productive Rate of Return (생산투자수익률 계산방법에 대한 연구)

  • Kim, Jin Wook;Kim, Kun-Woo;Kim, Seok Gon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.95-99
    • /
    • 2015
  • The IRR(internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it has serial flaws: (1) multiple real-valued IRRs may arise; (2) complex-valued IRRs may arise; (3) the IRR is, in special cases, incompatible with the net present value (NPV) in accept/reject decisions. The efforts of management scientists and economists in providing a reliable project rate of return have generated over the decades an immense amount of contributions aiming to solve these shortcomings. Especially, multiple internal rate of returns (IRRs) have a fatal flaw when we decide to accep it or not. To solve it, some researchers came up with external rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return). ARR or MIRR. will also always yield the same decision for a engineering project consistent with the NPV criterion. The ERRs are to modify the procedure for computing the rate of return by making explicit and consistent assumptions about the interest rate at which intermediate receipts from projects may be invested. This reinvestment could be either in other projects or in the outside market. However, when we use traditional ERRs, a volume of capital investment is still unclear. Alternatively, the productive rate of return (PRR) can settle these problems. Generally, a rate of return is a profit on an investment over a period of time, expressed as a proportion of the original investment. The time period is typically the life of a project. The PRR is based on the full life of the engineering project. but has been annualised to project one year. And the PRR uses the effective investment instead of the original investment. This method requires that the cash flow of an engineering project must be separated into 'investment' and 'loss' to calculate the PRR value. In this paper, we proposed a tabulated form for easy calculation of the PRR by modifing the profit and loss statement, and the cash flow statement.