• Title/Summary/Keyword: Ceiling Height

Search Result 98, Processing Time 0.023 seconds

An Experimental Study of Smoke Movement in Tunnel Fires with Aspect Ratio of Tunnel Cross Section (터널 화재시 터널 단면의 종횡비에 따른 연기 거동에 관한)

  • Lee, Sung-Ryong;Ryou, Hong-Sun;Kime, Choong-Ik
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.115-120
    • /
    • 2003
  • In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.

  • PDF

Improvement In the Serviceability of Floor Slab of Remodeled Building and the Performance of Floor Impact Noise (리모델링 건축물의 바닥슬래브 사용성 및 바닥충격음 성능개선)

  • Lee, Byung-Kwon;Bae, Sang-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1243-1246
    • /
    • 2006
  • As remodeling market is growing and peoples' concern on health and well-being is getting high, there is a need to apply environmentally friendly approach to remodeling an apartment houses. But, in point of the impact noise concerned, the thickness of the concrete slab and the limited ceiling height of the remodelling houses are the main constraints to improve the impact noise performance. In order to investigate the effect of the impact noise isolation as structural treatments for the structural elements, heavy-weight impact noise and tapping noise were measured in an remodeling building. As a result, structural strengthening method by H-beam was successful to enhance the impact noise level at about 3 or 4 class by the sound classification system.

  • PDF

An Analysis of Floor Impact Noise by using Wave Model (Wave 모델을 이용한 바닥충격음 해석)

  • Kim, Hyun-Sil;Kim, Jae-Seung;Kang, Hyun-Ju;Kim, Bong-Ki;Kim, Sang-Ryul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1417-1420
    • /
    • 2006
  • In this paper, floor impact is studied by using 1-D wave model and predicted insertion loss is compared to the measurements done in the mock-up. A mock-up is built by using 6t steel plate, and two identical cabins are made where 25t or 50t panel is used to construct wall and ceiling inside the steel structure. Various floating floor structures are studied, in which mineral wool thickness, height, and stiffness changes are investigated. It is shown that the wave model and measurements are in good agreements in general, although there occur significant discrepancies in the low frequency range below 200 Hz.

  • PDF

A Study of Smoke Spread and Flow in a Long Corridor (복도에서의 연기 확산 및 유동에 관한 연구)

  • 김충익;유홍선;김명배;한용식;김진곤;윤명오;김상욱
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 1998.11a
    • /
    • pp.29-39
    • /
    • 1998
  • 복도는 사무실용 건물, 호텔 등 공중이용 건물에서 중요한 피난경로의 일부이다. 화재로 복도에 연기가 확산되면 그 온도, 연층의 높이, 유해물질의 농도 등에 따라 피난에 심각한 장애를 가져올 수 있다. 본 연구는 이러한 복도에서의 연기의 확산 및 유동에 관하여 연구하기 위하여 길이 40m의 복도에서 pool fire로부터의 연기 유동에 관한 실제크기의 실험과 수치해석을 수행하였다. 화재실과 그에 접해있는 긴 복도가 있는 실험장치에 직경 15, 20, 30cm의 가솔린 pool을 화재실 중앙에서 점화 시켰다. 연기의 온도 및 이동을 측정하기 위해 전장 중앙선을 따라 열전대를 설치하였고 연층의 두께를 측정하기 위하여 수직방향으로 세곳에 열전대가 부착된 수직봉을 설치하였다. 아르곤 레이저 sheet 과 비디오 카메라를 이용해 연기의 유동을 가시화 하였다.

  • PDF

A Study on the Ventilation Effect by Establishment Location of Supply Opening and Exhaust Fan of Bathroom in Apartment House (공동주택 화장실의 급기구 및 배기팬 설치 위치에 따른 환기효과에 관한 연구)

  • 함진식
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.321-326
    • /
    • 2002
  • To design mechanical ventilation for bathroom of apartment houses where air supply and exhaust are taken Into consideration, mock-ups of ventilation systems, widely used in bathroom of apartment houses with an area of 100$m^2$, were made and installed in a laboratory, These ventilation mock-ups were available for control of air supply and exhaust, and the size of supply openings were 40cm$\times$1cm, 40cm$\times$3cm, 40cm$\times$5cm. They were installed at five positions, spaced 40cm at a height of 25cm from the floor. and the position of exhaust fans were four corners and center Exhaust fan established each one on corner of the ceiling and one in center. As result that measure ventilation effect by each condition, size of hole that supply air is big, and ventilation effect took effect to be good establishment location is low, Also, distance of exhaust fan is far with hole that supply air, ventilation effect took effect by superior thing.

  • PDF

The Relationship Between Walking Speed and Available Walking Height (보행 가능 높이에 따른 재실자의 보행속력에 관한 연구)

  • Son, Jong-Yeong;Bae, Young-Hoon;Jeon, Gyu-Yeob;Hong, Won-Hwa;Shin, Young-Min
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.41-48
    • /
    • 2020
  • During fire outbreaks, smoke accumulates from the ceiling and reduces the available walking height of people passing through. In this study, a walking experiment was conducted to investigate the relationship between the walking speed of people and available walking height. Twenty-three participants were enrolled. Based on the results, the lower the available walking height, the lower the average walking speed of the participants. However, a significant difference was noted only in the walking speed when the available walking height was 1.2 m compared to the free walking speed. In addition, there was no significant difference among participants in terms of their BMI index grade. However, in the case of participants with normal BMI, the walking speed at a 1.2 m available walking height was significantly lower than when walking freely. Further, in the case of overweight participants, the walking speed at 1.8 m and 1.7 m available walking height was significantly increased compared to that when walking freely.

Subjective Evaluation of Loudspeaker Layouts for a Large Dome (대공간 스피커 배치 방식의 주관적 평가 연구)

  • Jeong, Dae-Up;Choi, Young-Ji;Kim, Jeong-Su
    • Journal of Korean Association for Spatial Structures
    • /
    • v.10 no.3
    • /
    • pp.75-80
    • /
    • 2010
  • The present study tried to provide useful data for the acoustic design of sound amplification system with measuring and analyzing subjective preference and intelligibility by varying the number of speakers and their directivity. The results suggest that the room absorption plays a key role in subjective responses of listeners and the large sound absorption of ceiling contributes to the increase of intelligibility. Also, larger number of speakers with narrow directivity improves perceived intelligibility when speakers were installed at the lower height. However, the highest degree of intelligibility and preference were obtained when speakers were installed close enough to the sound absorptive ceiling. The highest intelligibility and preference were observed when 8 to 10 speakers with the directivity of 60 degree were used.

  • PDF

A Study on the Image-based Automatic Flight Control of Mini Drone (미니드론의 영상기반 자동 비행 제어에 관한 연구)

  • Sun, Eun-Hey;Luat, Tran Huu;Kim, Dongyeon;Kim, Yong-Tae
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.25 no.6
    • /
    • pp.536-541
    • /
    • 2015
  • In this paper, we propose a the image-based automatic flight control system for the mini drone. Automatic flight system with a camera on the ceiling and markers on the floor and landing position is designed in an indoor environment. Images from the ceiling camera is used not only to recognize the makers and landing position but also to track the drone motion. PC sever identifies the location of the drone and sends control commands to the mini drone. Flight controller of the mini drone is designed using state-machine algorithm, PID control and way-point position control method. From the, The proposed automatic flight control system is verified through the experiments of the mini drone. We see that known makers in environment are recognized and the drone can follows the trajectories with the specific ㄱ, ㄷ and ㅁ shapes. Also, experimental results show that the drone can approach and correctly land on the target positions which are set at different height.

The Planning of Temporary Housing for Post Application of Mega Sports Facilities - Focused on the 2018 Winter Olympics - (메가스포츠시설의 사후 활용을 위한 임시주거 계획 - 2018평창동계올림픽을 중심으로 -)

  • Lee, Jong-Chan;Kang, Youn-Do;Kim, Byung-Sean
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.41-46
    • /
    • 2016
  • Purpose: This is a study on the planning of temporary housing for post application of Mega Sports facilities. The subject of the study is 2018 Pyeongchang Winter Olympics, which is to suggest building an alternative temporary housing using shipping containers(high cube), which solve the lack of accommodations and recycle temporary housing after Olympics, save money and be eco-friendly in Olympics. Method: This study includes this ; research on the a fact-finding survey about Mega sports facilities post application and demand survey on 2018 Pyeongchang Winter Olympics accomodations and an analysis about temporary housing plan. Furthermore we decided temporary housing building plan by analyzing residents' needs and traits of the housing etc. Through this, we made a schematic design for household units. Result: As a result, this study is a plan of making space, forms, and structure. The planned size is $38.4m^2$(L:12m, W:3.2m) except balcony, and indoor height is 2.5m. The space consists of entrance, bathroom, bedroom and living room with folding furniture system. Also there's a detailed floor plan of the ceiling, wall, and floor we drew up. The ceiling and wall consist of dampproof film, noncombustible board, fire proof urethane form, and color-designed sheet. The floor is composed of floor tile, cement mortar, light concrete(with heat coil), insulation, and dampproof film. Additionally, this study is a plan of interior dry wall with detail using modular construction method for work efficiency and quality improvement.

A Study on the Design Types and Characteristics of Apartment Entrances - Focus on Whasung Dongtan Apartments - (아파트 동출입구 디자인 유형 및 특성에 관한 연구 - 화성동탄신도시 시범지구 및 1, 2공구 아파트를 중심으로 -)

  • Lee, Ki-Seok
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.6
    • /
    • pp.184-193
    • /
    • 2009
  • In recent years, the architectural interest in the apartment design has been getting focused on qualitative improvement and design differentiation. Especially the facade design differentiation is one of the most important elements in this matter. The purpose of this study is to provide the basic informations that can be referenced when architects are dealing with exterior design by analyzed design types and characteristics of apartment entrances. Target apartment of this study was whasung dongtan the 2nd phase new city districts which was planned to solve a housing shortage in the capital region. Having examined eleven pilot districts, four 1st construction areas, and eight 2nd construction areas, - total 23 complexes - 282 apartment entrances in 212 apartment buildings were carefully researched. Apartment entrance design can be divided into 15 different design elements: design types and combination types, direction, shape, height, approach types, exterior wall finishes of entrance, exterior wall finishes of lower parts of apartment, handrail types of slope, floor finishes of slope, distribution ratio of piloti, ceiling height of piloti, floor finishes of piloti, space use of piloti, window establishment between piloti and elevator hall, landscape elements of piloti. Design characteristics of building entrances were also analyzed in 4 groups (I, II, III, IV) divided by construction contractors ranking. In conclusion, first, design types and combination types can be classified into 15 different kinds, and the group I and II tend to show wider variety of entrance combinations. Secondly, the height and volume of extrude entrance type tend to increase in the group I and II. Third, the spatial configuration of pilotis appears to show more of 'pass + store + break' rather than 'access', as we get closer to the group I.