• 제목/요약/키워드: Case Manager

검색결과 395건 처리시간 0.026초

선박보검과준의 결정요인에 관한 연구 (A Study on Determining Factors of Hull Insurance Rate)

  • 김경건;민성규
    • 한국항해학회지
    • /
    • 제18권4호
    • /
    • pp.59-81
    • /
    • 1994
  • Korean property and liability insurance companies have underwrited hull insurance without proper undrewriting ability. But after April 1996. in case of Korean insurance market being opened the companies have to make hull insurance rate by themselves. Accordingly, in this study, the writer embodies important factors in making hull insurance rate by an empirical survey. In empirical survey, the writer used a questionnaire, 74 proper data was obtained from 96 officers working in making hull insurance rate in 12 Korean property and liablity insurance companies and 24 the foreign companies at home. Reliability was tested by Cronbach's Alpha and a conceptual validity by Factor Analysis. Hypothesis estabilished in this study was tested by Correlation and Multiple Regression Analysis. Results of testing hypothesis are as follows: Firstly, the traits of insurer and the assured influence significantly(P<0.05) on making hull insurance rate. Secondly, expected loss ratio, ship manager, ship's age, insured amount, level of the cost of repairing and salvage, shipowner, period of insurance, level of overseas rating, profit and expense, trading limits, ship's classification, conditions of insurance, and ship's size influence significantly(P<0.05) on making hull insurance rate.

  • PDF

Towards a "better" University: the Use of the EFQM Model in a UK Higher Education Institution

  • Blackmore, Jacqueline;Douglas, Alex
    • International Journal of Quality Innovation
    • /
    • 제4권2호
    • /
    • pp.1-15
    • /
    • 2003
  • This paper examines the use of the EFQM Model in H.E. Institutions in the UK and offers a case study of how one University used the Excellence Model as a means to change the way it operated. It identifies and discusses the critical success factors for a university utilizing the Model, in particular Leadership (criteria 1), People Management, particularly with regard to performance evaluation (criteria 3), having key processes in place (criteria 5) and the identification of the correct key performance results for its various stakeholders (criteria 9).

MAKING THE CASE FOR SAFE STORAGE OF USED NUCLEAR FUEL FOR EXTENDED PERIODS OF TIME: COMBINING NEAR-TERM EXPERIMENTS AND ANALYSES WITH LONGER-TERM CONFIRMATORY DEMONSTRATIONS

  • Sorenson, Ken B.;Hanson, Brady
    • Nuclear Engineering and Technology
    • /
    • 제45권4호
    • /
    • pp.421-426
    • /
    • 2013
  • The need for extended storage of used nuclear fuel is increasing globally as disposition schedules for used fuel are pushed further into the future. This is creating a situation where dry storage of used fuel may need to be extended beyond normal regulatory licensing periods. While it is generally accepted that used fuel in dry storage will remain in a safe condition, there is little data that demonstrate used fuel performance in dry storage environments for long periods of time. This is especially true for high burnup used fuel. This paper discusses a technical approach that defines a process that develops the technical basis for demonstrating the safety of used fuel over extended periods of time.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

BASIC RESEARCH FOR BUILDING EDUCATIONAL FACILITY MAINTENANCE PROCESS - FOCUSING ON DAEJEON METROPOLITAN CITY -

  • Jung-Whan Oh;Chun-Kyong Lee ;Mi-Hye Lee ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1203-1207
    • /
    • 2005
  • At this point of time that it is required to improve educational environment and the function of educational facilities as well as interests on educational facility business is increasing, it is actual situation that unsystematic maintenance of educational facility is not being able to cope with the change caused by introducing the 7th curriculum. Also, in spite of enormous career in maintenance work, the function is not properly performed because of unsystematic management. In case of educational facility manager, he parallels performing general administrative work and facilities maintenance work not as a maintenance expert but as a member of administration office. So there are difficulties in performing maintenance work, and systematic maintenance work cannot be expected because of lacking maintenance manual. Therefore, in this research, I would like to investigate and analyze the status of educational facilities and to elicit the point of issue as a basic research to save maintenance expenses and to make pleasant educational environment.

  • PDF

Study of Optimization of Ground Vehicles Routes Aiming to Reduce Operational Costs and to Contribute to a Sustainable Development with the Reduction of Carbon Dioxide in the Atmosphere

  • Clecio, A.;Thomaz, F.;Hereid, Daniela
    • 융합경영연구
    • /
    • 제4권1호
    • /
    • pp.1-8
    • /
    • 2016
  • The purpose of this paper is to discuss the methodology of optimizing delivery route scheduling using a capacity integer linear programming problem model developed to a previous case study. The methodology suggests a two-stage decision: the first, automatic, where the manager will obtain guidance generated by the solution of the linear programming model, later they could use post-optimization techniques to fine tune to the best operational solution. This study has the goal to reduce the size of service companies' ground transportation fleets, aiming not only to reduce costs and increase competitive advantages but also to lower levels of air pollution and its consequences, traffic and, therefore, the levels of carbon dioxide, allowing for a reduction in envir onmental disasters.

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF

DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM))

  • 김승호;김상용;전지훈;안성훈
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.151-159
    • /
    • 2016
  • 건설프로젝트에서 요구되는 중요한 장비 중 하나는 타워크레인 이다. 특히, 대부분의 고층건물 공사에서는 자재들의 이동작업들을 수행하기 위해 타워크레인이 더욱 요구되어진다. 따라서 타워크레인의 양중계획은 공사기간과 비용의 측면에서도 중요하다 할 수 있다. 하지만, 건설현장 대부분의 양중계획은 여전히 합리적인 작업의 분석없이 현장 관리자들의 경험과 직관에 의존하여 행해지고 있다. Dependency structure matrix (DSM)는 CPM과 Pert 같은 기존의 툴과는 다르게 작업 활동 순서 계획과 정보관리를 하는데 있어서 유용한 툴이다. 본 연구는 타워크레인의 양중 관리를 향상시키기 위하여 실제 건설 현장의 Case study를 통해 타워크레인 양중관리의 새로운 틀을 DSM을 이용하여 제시 할 것이다. DSM을 이용한 T/C의 양중계획의 Case study를 통해 나타난 결과는 기준층 양중 계획에 있어서 T/C의 양중계획을 최적화 시키는데 매우 유용하다는 결론을 보여주었다.