• 제목/요약/키워드: Capital Cost

검색결과 707건 처리시간 0.024초

비용구조분석에 의한 건축단계별 공사비용 절감방법 (The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure)

  • 박근준
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

한국 벤처캐피탈의 현황과 활성화 방안;중소기업창업투자회사를 중심으로 (A Study on the Activation Scheme for the Korean Venture Capitals)

  • 남인현;김용식
    • 벤처창업연구
    • /
    • 제1권2호
    • /
    • pp.157-192
    • /
    • 2006
  • 본 연구는 우리나라 벤처캐피탈 산업의 현황을 점검하고 활성화를 위한 방안을 제시하는데 그 목적이 있다. 벤처캐피탈 선진국인 미국의 사례를 도입해 실천하는 것도 우리나라의 시장상황을 우선 점검한 후 적용가능성을 철저하게 따져본 이후 결정해야 할 것이다. 다만 너무 다양한 문제를 구체적으로 다루다보면 복잡성해지며, 지나치게 거시적인 시각으로 보면 원론 수준에서 벗어나지 못할 가능성이 크다. 제시한 대안들은 사실상 새로운 내용이 아니며, 실무적으로도 필요성이 꾸준히 제기되어 온 문제들이다. 이제 실천의 문제를 생각해야 할 시점이다.

  • PDF

A Study on Economic Operation for Liner-Fleet by Fluctuation of Fuel Oil Price - Focusing on the Case of 'H' Shipping Company -

  • Lee, Soo-Dong;Chang, Myung-Hee
    • 한국항해항만학회지
    • /
    • 제35권9호
    • /
    • pp.765-776
    • /
    • 2011
  • For container shipping company, fuel oil prise is a considerable expense. Since 2008, fuel oil prises have risen dramatically. An increasing fuel oil price in container shipping, in the short term, is only partially compensated through surcharges and may affect earnings negatively. This study discusses the impact of an increasing fuel oil price and capital costs for vessels on the Asia-Europe trade of 'H' Shipping Company. According to the result of 'H' carrier's operation in 2008, there were no cost differences between 8 and 9 vessels operations in case of fuel oil price with USD 169/tons while adopting USD 31,818 as a fixed cost. We can expect that the fuel oil price will not go lower than USD 200/Ton on the basis of current high oil price phenomenon. When the fuel oil price is over USD 200/ton, 9 vessel operation is more economic than 8 vessel operation even if the fixed cost is over USD 35,000.

이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구 (A research on the design parameters for a double-transmission main system for sustainable water supply)

  • 현인환;홍준의;김두일
    • 상하수도학회지
    • /
    • 제27권1호
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

다양한 바이오매스 혼소시 국내 미분탄화력에 미치는 이산화탄소 감축 및 경제성 영향 분석 (Influence of Biomass Co-firing on a Domestic Pulverized Coal Power Plant In Terms of CO2 Abatement and Economical Feasibility)

  • 김태현;양원
    • 한국연소학회지
    • /
    • 제22권1호
    • /
    • pp.14-22
    • /
    • 2017
  • Co-firing of renewable fuel in coal fired boilers is an attractive option to mitigate $CO_2$ emissions, since it is a relatively low cost option for efficiently converting renewable fuel to electricity by adding biomass as partial substitute of coal. However, it would cause reducing plant efficiency and operational flexibility, and increasing operation and capital cost associated with handling and firing equipment of renewable fuels. The aim of this study is to investigate the effects of biomass co-firing on $CO_2$ emission and capital/operating cost. Wood pellet, PKS (palm kernel shell), EFB (empty fruit bunch) and sludge are considered as renewable fuels for co-firing with coal. Several approaches by the co-firing ratio are chosen from previous plant demonstrations and commercial co-firing operation, and they are evaluated and discussed for $CO_2$ reduction and cost estimation.

THE RELATIONSHIP BETWEEN PLOT GEOMETRY AND INPUTS REQUIRED FOR FARM MACHINE OPERATION IN KOREA

  • Singh, Gajendra;Ahn, Duck-Hyun
    • 한국농업기계학회:학술대회논문집
    • /
    • 한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
    • /
    • pp.139-147
    • /
    • 1993
  • The rapid industrial growth, the consequent shortage of farm labour and increase in their wage level have facilitated more capitalized agricultural mechanization pattern in Korea. The efficiency of capital intensive machine is highly dependent on farm land structure. This paper describes a model explaining the relationship between farmland structure and required inputs for machine operation and to estimate required inputs for machine operation on the national basis for Korea for its paddy production system. The machine cost is closely related to operation area, but the required labour-hours are more related to machine type adopted . From the technology introduction point of view, if capital intensive machine is introduced, less labour-hours are required but machine kW-hours increase rapidly. From the plot geometry point of view, on good geometry plots, machine kW-hour and labour-hour required are less than that on the poor geometry plots. The kW-jhour per hectare of mechani al energy input id better indicator of mechanization level than kW per hectare or number of machine. If the adopted technology is more capital intensive and plot geometry is good, the cost reduction effect is highly significant.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

The Effect of the Credit Period on Inventory Policy under Trade Credit with Ordering Cost inclusive of a Freight Cost

  • Shinn, Seong-Whan
    • International Journal of Advanced Culture Technology
    • /
    • 제9권3호
    • /
    • pp.271-276
    • /
    • 2021
  • In this paper we analyze the effect of the credit period on inventory policy under trade credit with ordering cost including a fixed cost and freight cost, where the freight cost has a quantity discount. For marketing purposes, some supplier offers credit period to his buyer to stimulate the demand for the product he produces. The delay in payments during the credit period has the effect of reducing the buyer's capital opportunity cost. It is also assumed that the buyer pays the freight cost for the order and hence, the ordering cost consists of a fixed ordering cost and a variable freight cost which depends on the order quantity. As a result, the possibilities of trade credit and discounts on freight costs are expected to play an important role in the buyer's inventory policy. Based on the economic order quantity inventory model, we analyze how the buyer can determine the optimal inventory policy and we examine the effect of the length of credit period on the buyer's inventory policy.

국내 유가증권시장 상장기업들의 산업간 그리고 산업내의 최적자본구조의 존재에 대한 추가적인 실증 분석 (Further Evidence on the Existence of an Inter- and Intra-Industry Optimal Capital Structure for the KOSPI-listed Firms in the Korean Capital Market)

  • 김한준
    • 한국산학기술학회논문지
    • /
    • 제18권6호
    • /
    • pp.110-118
    • /
    • 2017
  • 본 논문은 재무관리 이론에서 현재까지 논의가 지속되고 있는 국내 유가증권시장 상장기업들의 최적자본구조 존재여부에 대한 실증론적 연구이다. 최적자본구조에 대한 주요 이론적 논리인 자금조달이론, 상충이론, 그리고 대리인 이론 등을 전제로, 모수적 그리고 비모수적 방법을 활용한 공분산모형의 분석을 통하여 표본기업들의 최적자본구조 존재 여부를 검정하였다. 구체적으로는, 상충이론과 대리인비용이론과 관련된 통제변수들이 해당모형에서 각각 활용되었으며, 이는 최적자본구조 존재를 위한 산업 간 그리고 산업 내 분석 자금조달이론 통제변수를 활용한 기존의 연구와도 대비될 수 있다. 연구결과 관련, 표본산업을 활용한 산업들 간 분석에서는 최적자본조가 존재하는 것으로 실증적으로 검정된 반면, 산업 내 분석에서는 해당 기업들 간의 통계적인 측면에서 최적자본구조가 존재하지 않는 것으로 나타났다. 이와 부합하여, 본 연구에서 도출된 결과가 잠재적인 투자가들의 측면에서 의미할 수 있는 바는, 향후 국내 기업들이 해당 산업 내의 최적부채비율에 점진적으로 접근할 경우, 기업가치 증대를 위한 재무적 기회가 상존한다는 것이다.

열교환기 네트워크의 자동합성 (Automatic synthesis of heat exchanger networks)

  • 오전근;김경미;윤인섭
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1986년도 한국자동제어학술회의논문집; 한국과학기술대학, 충남; 17-18 Oct. 1986
    • /
    • pp.613-618
    • /
    • 1986
  • In this study a s/w system(HENSPIN) for the automatic synthesis of HEN(heat exchanger network) was developed based on Pinch Design Method. The synthesized HEN by HENSPIN are satisfying performance targets such as minimum utility usage with as few as possible capital items. The invented network is near optimal in capital and operating cost. It will be used as initial structure for evolution to the structure which has optimal operability.

  • PDF