• 제목/요약/키워드: Capacitor banks

검색결과 49건 처리시간 0.036초

분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정 (Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost)

  • 허재행;류재근;이우리;박종영;박종근
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

불평형 배전계통에 있어서 유전알고리즘을 이용한 커패시터의 적정 배치 및 제어 (Optimal Capacitor Placement and Control using Genetic Algorithms in Unbalanced Distribution Systems.)

  • 김규호;유석구
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권7호
    • /
    • pp.839-846
    • /
    • 1999
  • This paper presents an efficient algorithm for determining the location, size and number of capacitors in unbalanced radial distribution system. The objective function formulated consists of two terms: cost for energy loss and cost related to capacitor purchase and capacitor installation. The cost function associated with capacitor placement is considered as step function due to banks of standard discrete capacities. Genetic algorithms(GA) are used to obtain the population is derived. The strings in each population consist of the bus number index and size of capacitors to be installed. In order to determine the number of capacitor placement, the length mutation operator is used. Its efficiency is proved through the application in unbalanced radial distribution systems made of 10 buses with 9 distribution lines and 25 buses with 24 distribution lines.

  • PDF

배전변전소에서 캐패시터 뱅크 투입시 일어나는 전자과도 현상에 관한 연구 (A Study on the Electromagnetic Transients at Switching Capacitor Banks in a Electric Distribution Electric Power Distribution Substation)

  • 김경철
    • 조명전기설비학회논문지
    • /
    • 제16권1호
    • /
    • pp.92-99
    • /
    • 2002
  • 배전변전소에서 과도현상은 주로 스위칭으로 인해 발생한다. 본 논문에서는 스위칭 서지 현상을 분석하고, 과도현상을 저감시키는 방법을 상용화된 EDSA의 EMTAP 프로그램을 이용하였다. 과도현상으로 인한 전압의 크기를 제한하는 방법으로 부하측의 역률개선용 캐패시터 뱅크를 노조파 필터로 변환시켰다. 캐패시터 뱅크에 직렬로 연결된 인덕턴스는 부하측에 적절한 수준의 전압으로 낮출 수가 있었다. 또한 EDSA의 고조파 분석 프로그램으로 시뮬레이션한 결과는 고조파 저감 효과도 검증할 수 있었다.

전열화학추진용 2.4MJ 펄스파워전원의 설계와 동작특성(II) (Design and Operation Characteristics of 2.4MJ Pulse Power System for Electrothermal-Chemical (ETC) Propulsion (II))

  • 진윤식;이홍식;김종수;황동원;김진성;추증호;정재원;문희종
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 C
    • /
    • pp.1603-1605
    • /
    • 2001
  • Eight 300kJ modularized capacitor-banks have been constructed. These modules have been installed and assembled to make a 2.4MJ pulse power system (PPS). This 2.4MJ PPS was developed to be used as a driver of an electrothermal-chemical (ETC) gun. Each capacitor bank has six 22kV, 50kJ capacitors connected in parallel. A triggered vacuum switch (TVS-43) was adopted as a main pulse power-closing switch in each module. The module also contains a crowbar circuit made of three high-voltage diode-stacks, a multi-tap inductor and an energy-dumping resistor. Various current shapes have been formed by a sequential firing of multiple capacitor banks. Resistive dummy load has been used and various combinations of experimental parameters, such as charging voltage, trigger time and inductance, were tested to make flexible current shapes.

  • PDF

ESGA를 이용한 불평형 배전계통의 커패시터 설치에 관한 연구 (A Study on Capacitor Placement Using ESGA Hybrid Approach in Unbalanced Distribution Systems)

  • 김규호;이유정;이상봉;유석구
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권6호
    • /
    • pp.316-324
    • /
    • 2003
  • This paper applied Elite-based Simplex-GA hybrid approach combined with Muptipop-GA (ESGA) to determining the location, size and number of capacitors to improve voltage profile and minimize power losses in unbalanced distribution systems. One of the main obstacles in applying GA to complex problems has been the high computational cost due to their slow convergence rate. To alleviate this difficulty, ESGA approach was developed that combines Elite-based Simplex-GA hybrid approach with Muptipop-GA. The objective function formulated consists of two terms: cost for energy losses and cost related to capacitor purchase and capacitor installation. The cost function associated with capacitor placement is considered as a step function due to banks of standard discrete capacities. Its efficiency was proved through the application in IEEE 13 bus and 34 bus test systems and was compared with several methods using GA.

분산전원이 도입된 배전계통에서 커패시터 스위칭에 의한 과도현상 방지에 대한 연구 (A Study on Preventing Transient Phenomena Due to Capacitor Switching in Distribution System involving Distributed Generation System)

  • 이동구;황진수;주용환;김재언
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.10-12
    • /
    • 2001
  • This paper presents a study of transient overvoltages caused by capacitor switching on the utility distribution system. Capacitor banks used for power factor correction and voltage regulation can improve efficiency of the power system. But transient voltages due to capacitor switching on the utility system affect the sensitive customer load equipments. If Distributed Generation System (DGS) is involved in the system, the problems become more serious. In this paper, effect of transient voltages at the customer load created by utility capacitor switching is analyzed by simulations Solutions to this problem are presented.

  • PDF

Opposition Based Differential Evolution Algorithm for Capacitor Placement on Radial Distribution System

  • Muthukumar, R.;Thanushkodi, K.
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권1호
    • /
    • pp.45-51
    • /
    • 2014
  • Distribution system is a critical link between customer and utility. The control of power loss is the main factor which decides the performance of the distribution system. There are two methods such as (i) distribution system reconfiguration and (ii) inclusion of capacitor banks, used for controlling the real power loss. Considering the improvement in voltage profile with the power loss reduction, later method produces better performance than former method. This paper presents an advanced evolutionary algorithm for capacitor inclusion for loss reduction. The conventional sensitivity analysis is used to find the optimal location for the capacitors. In order to achieve a better approximation for the current candidate solution, Opposition based Differential Evolution (ODE) is introduced. The effectiveness of the proposed technique is validated through 10, 33, 34 and85-bus radial distribution systems.

23kV급 Capacitor Bank 보호 알고리즘 (A Protection Algorithm of 23kV Shunt Capacitor Banks)

  • 임정욱;권영진;강상희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.443-445
    • /
    • 2004
  • 본 논문에서는 22.9kV급 Shunt Capacitor Bank 내부 고장으로 인한 불평형 요소를 검출하기 위하여 기존의 차동전압의 크기만을 이용한 보호 방식을 검토하고, 이 보호 방식에서 발생되는 여러 문제점들을 해결하기 위한 개선 방안을 제안한다. 기존의 차동전압의 크기를 이용한 보호 방식에서는 인입단 근처에서의 고저항 아크 고장이나 접지단 근처에서의 지락 고장 등에 의해 Capacitor 소자에 손상을 입을 수 있지만, 이에 대한 고장 판정이 용이하지 않다. 따라서 이를 해결하기 위하여 본 논문에서는 차동전압의 주파수 계전 방식 및 접지단 전압 등을 도입하였다. 특히, 주파수 계전 요소를 도입할 경우에 비선형 부하 둥으로부터 발생되는 고조파의 영향이 없다는 것을 입증하여 부하의 종류와는 무관하게 본 논문에서 제안한 방법이 적용될 수 있음을 보였다 본 논문에서 제안한 알고리즘은 사례 연구를 통하여 그 타당성이 입증되었다.

  • PDF

저잡음 증폭기를 위한 프로그램 가능한 고주파 Built-In Self-Test회로 (Programmable RF Built-ln Self-Test Circuit for Low Noise Amplifiers)

  • 류지열;노석호
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2005년도 춘계종합학술대회
    • /
    • pp.1004-1007
    • /
    • 2005
  • 본 논문에서는 저잡음 증폭기 (Low Noise Amplifier, LNA)를 위한 프로그램 가능한 RF (고주파) BIST (Built-In Self-Test) 회로를 제안한다. 개발된 BIST 회로는 온 칩 형태로 DC 측정만을 이용하여 LNA의 RF 변수들을 측정할 수 있다. BIST 회로는 프로그램 가능한 커패시터 뱅크 (programmable capacitor banks)를 가진 test amplifier와 RF 피크 검출기로 구성되어 있다. 이러한 온 칩 회로는 각각 GSM, Bluetooth 및 IEEE802.11g의 응용을 위해 세 가지 주파수 대, 즉 1.8GHz, 2.4GHz 및 5GHz에서 사용할 수 있도록 프로그램 되어있고, LNA가 가지는 RF 사양들, 즉 입력 임피던스 및 전압이득 등을 DC 전압으로 변화시켜주는 역할을 한다.

  • PDF

저잡음 증폭기를 위한 새로운 자동 보상 회로 (A New Automatic Compensation Circuit for Low Noise Amplifiers)

  • 류지열;길버트;노석호
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2005년도 춘계종합학술대회
    • /
    • pp.995-998
    • /
    • 2005
  • 본 논문에서는 시스템 온 칩 (SoC, System-on-Chip) 트랜시버에 적용이 가능하며. 저잡음 증폭기(LNA, Low Noise Amplifier)를 위한 자동 보상 회로 (ACC, automatic compensation circuit)를 제안한다. 개발된 회로는 고주파 내부 자체 검사 (BIST, Built-In Self-Test) 회로, 커패시터 미러 뱅크 (CMB, Capacitor Mirror Banks)와 디지털 처리장치로 구성되어 있다. 자동 보상 회로는 LNA가 정상 동작을 하지 않을 때 SoC 트랜시버의 구성요소인 디지털 프로세서를 이용하여 LNA가 정상 동작을 하도록 자동적으로 조정하는 역할을 한다.

  • PDF