• Title/Summary/Keyword: Cap Construction

Search Result 118, Processing Time 0.033 seconds

Evaluation of Structural Performance of Precast Modular Pier Cap (프리캐스트 모듈러 피어캡의 구조성능 평가)

  • Kim, Dong Wook;Shim, Chang Su
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.1
    • /
    • pp.55-63
    • /
    • 2015
  • Prefabrication technologies are making bridge construction safer and less disruptive to the environment and traveling public, making bridge designs more constructible and, improving the quality and durability by shifting site work to a more controllable environment. Modular bridge substructures with concrete-filled steel tube (CFT) piers and composite pier caps were suggested to realize accelerated bridge construction. The precast segmental pier cap consists of a composite pier table and precast prestressed segments on the table. The pier table has embedded steel section to mitigate stress concentration at the connection by small tubes. Each bridge pier has four or six CFT columns which connect to the pier cap. Shear strength of the pier cap was obtained by extending vertical reinforcing bars from the table to the precast segment. Transverse prestressing was introduced to control tensile stresses by service loadings. Structural performance of the proposed modular system was evaluated by static tests. Design requirements of the composite pier cap were satisfied by continuous reinforcing bars and prestressing tendons. Standardized modular substructures can be effectively utilized for the fast replacement or construction of bridges.

Analysis on the Rigid Connections between the Large Diameter Drilled Shaft and the Pile Cap for the Sea-Crossing Bridges with Multiple Pile Foundations (다주식 기초 해상교량에서 대구경 현장타설말뚝과 파일캡의 강결합에 대한 분석)

  • Cho, Sung-Min;Park, Sang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.343-358
    • /
    • 2008
  • Piles of a bridge pier are connected with a column through a pile cap(footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. This difference causes a change of the design method. Connection methods between pile heads and the pile cap are divided into two groups ; rigid connections and hinge connections. KHBDC(Korea Highway Bridge Design Code) has specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However some specifications prescribe that conservative results through investigations for both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which have very good quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) are unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the very large diameter drilled shaft and the pile cap for Incheon Bridge which will the longest bridge in Korea were investigated through the full modeling for rigid connection conditions.

  • PDF

A Comparative Study on Raglan-Sleeve Patterns According to Construction Factors (구성요인에 따른 래글런 슬리브 패턴의 비교 연구)

  • 이경화;조재희
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.26 no.11
    • /
    • pp.1502-1513
    • /
    • 2002
  • The purpose of this study was to find relations between construction factors and adaptability on the 5 available raglan sleeve patterns through the drafting method. Also it was to suggest a functional sleeve pattern according to appearance and adaptability test. Three women in her twenties who have standard figure was selected as subjects. Raglan sleeves of 5 experimental clothes were rated by the appearance test and adaptability test. The major conclusions of this study are as follows. 1. The construction factors of the raglan sleeve are sleeve slant, sleeve cap height, biceps line, breast width. Bicep lines increased and sleeve cap height decreased as the sleeve slant decreased. The higher adaptability scores of raglan sleeves were, the lower sleeve slants were. 2. According to the appearance evaluation, B type was recorded the highest score 3. According to the adaptability scores, A type was recorded the highest score. In the pulled length of the waist-line, A type was the lowest movements among the pattern type. In the pulled length of the sleeve-line, A type was the lowest movements among the pattern types. Therefore A type was evaluated by the bort functional sleeve pattern type. Through the experiments, it was known that appearance and adaptability of the raglan sleeve patterns were effected by construction factor.

Utilization of Centrifuge Test in Geoenvironmental Engineering: Consolidation and Contaminant Transport at Capped Dredged Sediment (원심모형실험의 지반환경공학적 이용: 캡핑된 준설퇴적토의 압밀과 오염원 이동)

  • Kim, Tae-Hyung;Kang, Ki-Min;Lee, Jeong-Woo;Jung, Su-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1060-1067
    • /
    • 2006
  • Sandy soils are generally used as a capping material to reduce the pollutants transport from the contaminated dredged sediment. However, dredged material capping is not widely used because regulatory agencies are concerned about the potential for contaminants migration through the cap. Movement of contaminated pore water from sediment into cap is mainly related to sediment consolidation during and after cap placement. To evaluate the significance of consolidation induced transport of contaminants from sediment into cap, research centrifuge tests were conducted. Centrifuge test results illustrate that advection and dispersion are the dominant contaminants transport processes and that capping reduces the potential of contaminant migration from the dredged sediment effectively.

  • PDF

Improvement of Flexural Performance for Deep-Deck Plate using Cap Plate (캡플레이트를 이용한 장스팬용 춤이 깊은 데크의 휨성능 개선)

  • Park, K.Y.;Nam, Y.S.;Choi, Y.H.;Kim, Y.H.;Choi, S.M.
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.5
    • /
    • pp.555-567
    • /
    • 2013
  • Slim floor system using deep decks has been developed and employed in Europe to reduce the floor height of steel structures. Although long span buildings involving the issue of reducing floor height are being increasingly built in Korea, employing deep decks in more than 7m long span structures is likely to cause problems associated with excessive deflection. This study is applied to the long-span concrete casting of the deep deck plate usability of deflection due to bending and torsional instability of open cross-section, as a way to improve the problem of cap plates are suggested, and the optimum length of reinforcement and location are derived from theoretic estimation. The cap plates are placed on the deep decks with regular intervals to overcome the instability of open sections, improve the stiffness of the sections and control the deflection at the centers. The improvement in flexural capacity associated with the location of the cap plates and the length of reinforcement are verified through analysis and test.

Three dimensional finite element analysis of 4 inch smart flange on offshore pipeline

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid
    • Ocean Systems Engineering
    • /
    • v.4 no.4
    • /
    • pp.279-291
    • /
    • 2014
  • Smart flanges are used for pipeline and riser repair in subsea. In a typical case in the gas export pipeline project, the end cap bolts of a 4inch smart flange were broken during operation, and in turn leakage occurred. This work presents the detail of three dimensional finite element analysis of the smart flange to support the observed end cap bolts failure. From finite element analysis it turns out that in the presence of external bending moment, an uneven contact distribution is present between seal and end cap, which in turn changes the uniform load distribution on bolts and threaten the integrity of bolts. On the other hand, 3D finite element analysis of interaction between pipeline and seabed is presented by means of Abaqus to explore the distribution of bending moment along the pipeline route. It is found that lateral buckling occurs in the pipeline which introduces large bending moment.

Quasi-static test of the precast-concrete pile foundation for railway bridge construction

  • Zhang, Xiyin;Chen, Xingchong;Wang, Yi;Ding, Mingbo;Lu, Jinhua;Ma, Huajun
    • Advances in concrete construction
    • /
    • v.10 no.1
    • /
    • pp.49-59
    • /
    • 2020
  • Precast concrete elements in accelerated bridge construction (ABC) extends from superstructure to substructure, precast pile foundation has proven a benefit for regions with fragile ecological environment and adverse geological condition. There is still a lack of knowledge of the seismic behavior and performance of the precast pile foundation. In this study, a 1/8 scaled model of precast pile foundation with elevated cap is fabricated for quasi-static test. The failure mechanism and responses of the precast pile-soil interaction system are analyzed. It is shown that damage occurs primarily in precast pile-soil interaction system and the bridge pier keeps elastic state because of its relatively large cross-section designed for railways. The vulnerable part of the precast pile with elevated cap is located at the embedded section, but no plastic hinge forms along the pile depth under cyclic loading. Hysteretic curves show no significant strength degradation but obvious stiffness degradation throughout the loading process. The energy dissipation capacity of the precast pile-soil interaction system is discussed by using index of the equivalent viscous damping ratio. It can be found that the energy dissipation capacity decreases with the increase of loading displacement due to the unyielding pile reinforcements and potential pile uplift. It is expected to promote the use of precast pile foundation in accelerated bridge construction (ABC) of railways designed in seismic regions.

Low-Cost CAP-type TDR Exploration Techniques for Leak Detection (누수탐지를 위한 저비용 CAP형 TDR 탐사기법)

  • Kim, Jin Man;Choi, Bong Hyuck;Cho, Jin Woo;Cho, Won Beom
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1479-1487
    • /
    • 2013
  • The river levee collapse and flood damages are dramatically increased due to the floods which caused by abnormal weather nowadays. The counterplan like TDR(Time Domain Reflectometry) river levee leaking exploration technique is needed to that levee failure causes of levee failure such as levee failure by penetration, piping, inadequate levee materials selection, poor compaction are almost 52% of the failure. This research practiced various comparing experiments of existing TDR(probe and tube types) and developing CAP type TDR to evaluate acrylic small CAP mould and low-cost TDR levee leaking monitoring system which was used probe type TDR. As the result, evaluated TDR system had 20cm critical exploration performance which was a leaking exploration performance, The functional ratio of TDR exploration sensitivity of dry density was sensitive more than 3 times than dry density, and weathered granite soil foundation water contents(w)-dielectric constant(${\epsilon}$) corelation formula was suggested to measure functional ratio on developing cap type TDR system.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

The Effect of Dynamic Behavior on Changing Pile Cap Size of Pile Group in Sandy Soil (사질토 지반에서 말뚝 캡 크기가 무리말뚝의 동적거동에 미치는 영향)

  • Lee, Hyunkun;Ahn, Kwangkuk;Kang, Hongsig
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.8
    • /
    • pp.5-12
    • /
    • 2019
  • A pile group, that consists of several piles connected by a pile cap, is used as the superstructure. The pile supports vertical and horizontal load to design the pile group, but the effect of bearing capacity of the pile cap has not considered. Various researches have been conducted to reflect the effect of bearing capacity of the pile cap in order to reduce the amount of piles in the range of the stability under the vertical load of the superstructure. However, the effect of bearing capacity under the horizontal seismic load has not been studied adequately. Therefore, a shaking table test was carried out with different-sized pile caps that support the superstructure in this study. This test was to verify the influence of the size of the pile cap in the group pile under the horizontal load. The result shows that the size of the pile cap affects to the dynamic behavior of the superstructure and the pile group. Also, the bigger size of the pile group makes the larger constraint effect of ground, and it results that both the ground and the pile moves as a whole.