• Title/Summary/Keyword: CWR

Search Result 135, Processing Time 0.025 seconds

Influence Factors Affecting the Longitudinal Force of Continuous Welded Rail on Railroad Bridges (장대레일 철도 교량의 축력 영향인자 분석)

  • Kim Kyung Sam;Han Sang Yun;Lim Nam Hyoung;Kang Young Jong
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.385-390
    • /
    • 2003
  • Recently, use of Continuous Welded rail(CWR) is increased for structural, economical reason but new problem is caused accordingly and phenomenon that give threat in traveling by ship stability of train is led. According as rail is prolonged, excessive relative displacement and longitudinal force can happen to rail by temperature change and external force. Specially, buckling or fracture of rail can happen in railroad bridges because relative displacement by bridge and properties of matter difference between rail grows and additional axial force happens to rail by behavior of bridge. According to several study, longitudinal force of rail in bridge is influenced with ballast resistance, elongation length, boundary condition, stiffness of framework. Non-linear behavior of ballast acts by the most important factor in interaction between rail and bridge. Therefore, must consider stiffness of bridge construction with non-linear characteristic of ballast and stiffness of base for accuracy with longitudinal force calculation and analyze. In this study, perform material non-linear analysis for longitudinal force of CWR and three dimensional buckling analysis to decide buckling force.

  • PDF

Effects of Vehicle Loads on Thermal Buckling Behavior of Continuous Welded Rail Tracks (장대레일 궤도의 온도좌굴 거동에 미치는 열차하중의 영향)

  • Choi, Dong Ho;Kim, Ho Bae
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.6
    • /
    • pp.727-736
    • /
    • 2000
  • The present study investigates the influences of vehicle induced loads on the thermal buckling behavior of straight and curved continuous welded rail (CWR) tracks. Quasi-static loads model is assumed to determine the uplift region, which occurs due to the vertical track deflection induced by wheel loads of vehicle. The lateral loads of vehicle induced by weight, the speed, the superelevation and curvature of track, and other dynamic vehicle track interaction, are included in the ratio of lateral to vertical vehicle load. Parametric numerical analyses are perfomed to calculate the upper and lower critical buckling temperatures of CWR tracks, and the comparison between the results of this work and the previous results without vehicle is also included.

  • PDF

A study on the refined resetting for the continuous weleded rail (장대레일 재설정 방법 개선 연구)

  • Kim, Woo-Jin;Jung, Chan-Mook;Min, Kyung-Ju
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.386-394
    • /
    • 2007
  • Due to the transportability problems, long rail shall be from base rail unit, which is normally 100m for regular rail and 300m for high speed rail. After these rail units are transported from the fabricator to the site, the field weld would be performed.axial stresses in the long rail is mainly from the temperature differences at various locations the long rail. Also the gaps between each welds cause secondary axial stresses in the rail. In addition to these, re-welds the fractured rails, rail buckling, irregular rail vibration, rail twist also result innonuniform axial stresses in the rail. To obtain the rail buckling stability, the rail stresses shall be released due to the resetting of CWR. Traditionally two resetting of CWR methods have been applied, the one is rail heater and the other is rail tenser. these methods, the latter has been recommended because it has less limitation in the rail length and it is easier to minimized the force differences. But even in this method, the calculation is cumbersome and is not easy to find out the rail stress distribution itself.refined methodsxial stress resetting in the long rail is studied and this study be easily applied in the real construction. From this approach, more rational rail maintenance system can be expected.

  • PDF

A Study on Logicality for the Periodic Replacements of Continuous Welded Rail based on Accumulated Passing Tonnage (누적통과톤수에 의한 레일교체기준의 타당성 분석)

  • Sung, Deok-Yong;Kong, Sun-Yong;Kim, Park-Jin;Shin, Hyo-Jung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1058-1070
    • /
    • 2007
  • Internal and external railway management corporations are using the periodic replacement criteria of rail by accumulated passing tonnage and wear to maintain rails for servicing. However, internal the periodic replacement criteria of continuous welded rail(CWR) by accumulated passing tonnage is the one(50kg/m-5 million gross tonnage, 60kg/m-6 million gross tonnage) presented in Japan before. It was estimated with the fatigue life about 50kg N rail joints applied diesel train load but it wasn't applied to current conditions of track; elimination of rail joint, using the concrete slab track and operation of light train load and effect of welding, manufacturing technique, grinding of rail. Therefore, in this study, it was investigated the types of damage and cause in welded rails and examined standards and information resources. Also, this study presents preliminary data to revise the periodic replacement criteria of CWR by current accumulated passing tonnage in bending test of laid welded rail and a survey of track maintenance history of Seoul metro.

  • PDF

The Characteristics of Rail Temperature for Track Maintenance (궤도 관리를 위한 레일 온도의 특성)

  • 구봉근;서사범
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.1
    • /
    • pp.19-26
    • /
    • 2000
  • The rail temperature is important to preserve the joint gap for standard length of rail and to determine the installation temperature which has direct influence on the rail buckling and failure in welded part for continuous welded rail(CWR), Therefore, we have measured and investigated various characteristics of rail temperature for each kind of rail. As the results of this, the correlation between the atmosphere temperature and the rail temperature which is commonly used by Korean Railway should be reconsidered. Also, the daily highest '||'&'||' lowest rail temperature was occurred when each temperature is higher and when it's lower. For the light rail, the rail temperature by the sun-light increases quickly and decreases late. But the time where the highest temperature is attained is same. There are some differences between the shade and sunny place about 3.0∼4.0$\^{C}$. The temperature of rail web is almost close to the conversion rail temperature for rail expansion. The wind of 1 m/s has an influence on the rail temperature around 5$\^{C}$.

  • PDF

Sensitivity of Track Components on the Linear Thermal Buckling (선형온도좌굴에 대한 궤도 구성요소의 민감도)

  • 임남형;강영종;성익현
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.207-212
    • /
    • 2002
  • The actual buckling of the railroad track structure is suspected to be a complex interaction between the vertical, lateral and torsional modes. To make the analysis tractable, however, most studies restrict themselves to either the vertical or the horizontal plane. Based on a comprehensive and realistic three-dimensional track model developed in the previous study, three dimensional buckling analysis of CWR track subjected to temperature load was performed. Using the study on buckling temperature and mode, sensitivity of track components such as tie spacing, ballast resistance, stiffness of pad-fastening system and rail size were investigated.

  • PDF

Logicality Estimate for Domestic the Periodic Replacement Criteria of CWR based on Accumulated Passing Tonnage (누적통과톤수에 의한 국내 레일교체기준의 타당성 평가)

  • Park, Yong-Gul;Suh, Sang-Kyo;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.326-333
    • /
    • 2008
  • This study is objected by presenting preliminary data to revise the periodic replacement criteria of continuous welded rail (CWR) in using. In this study, it is investigated information resources for foreign standards, the cause and types of damage in welded rails and the track maintenance history of Seoul metro to analysis the correlation between rail failure and accumulated passing tonnage. Also, it is performed bending test for the laid welded rail reaching the periodic replacement criteria. In result, the correlation between rail failure and accumulated passing tonnage is not obvious and it is a lot of cases for the construction error of welded rail. Also, as a result of bending test of laid welded rail, according to reducing about $17{\sim}18%$ the bending fracture strength of rail, the laid welded rail reaching the periodic replacement criteria is well enough ensured for the load carrying capacity of rail.

Analysis of Argumentation in the Inquiry Discourse among Pre-service Science Teachers (탐구 토론에서 예비과학교사들의 논증 분석)

  • Lee, Bong-Woo;Lim, Myung-Sun
    • Journal of The Korean Association For Science Education
    • /
    • v.30 no.6
    • /
    • pp.739-751
    • /
    • 2010
  • The research reported in this study focused on an analysis of argumentation in the inquiry discourse among pre-service science teachers. For about 3 months, 7 groups of 24 pre-service science teachers participated in an open-ended inquiry and performed 10 inquiry discourses. All discourses were collected by video-recording and transcribed. To analyze features of argumentation discourse, analytic tools derived from Toulmin's argument pattern and cognitive argumentation scheme were applied to discussion transcripts. The results were as follows: First, the order of frequency in the analysis of 'meaning unit' was 'claim-warrant-data-rebuttal-backing.' Second, the order of frequency in the analysis of 'dialogue unit' was 'CW-CD-CDW-CWR-CR'. Third, more rebuttals were found than other discussions. Fourth, the second argumentative discussion showed a higher level than the first.

Safety Evaluation on Interaction between Track and Bridge in Continuous Welded Railway Bridge Considering Seismic Load (지진하중을 고려한 장대레일교량의 궤도-교량 상호작용에 대한 안전성 평가)

  • Shim, Yoon-Bo;Kim, Yun-Tae;Kim, Sang-Chel
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.2
    • /
    • pp.40-48
    • /
    • 2016
  • To observe the rail-slab interaction in continuous welded railway(CWR) bridge when earthquake occurs, additional axial rail stresses and relative longitudinal displacements between rail and bridge deck were calculated with input of various load combinations and 3 different types of seismic loads to an analytical model. As results of analysis, it can be found that standard response spectrum proposed by Korea Rail(KR) network authority for earthquake design showed less additional axial rail stresses than allowable levels, but greater relative longitudinal displacement between rail and bridge deck, which means that adjustment of relative longitudinal displacement within a standard level is much more difficult than axial train stress. Additionally, if a large-scaled earthquake as occurred at Kobe, Japan comes up, then both of additional axial rail stress and relative displacement in rail-bridge deck may exceed allowable levels, which indicates to make proper design guides against sudden earthquake occurrence.

Simulation of IWR Based on Different Climate Scenarios

  • Junaid, Ahmad Mirza;Arshad, M.;Choi, Kyung-Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.519-519
    • /
    • 2016
  • Upper Chenab Canal (UCC) is a non-perennial canal in Punjab Province of Pakistan which provides irrigation water only in summer season. Winter and summer are two distinct cropping season with an average rainfall of about 161 mm and 700 mm respectively. Wheat-rice is common crop rotation being followed in the UCC command area. During winter season, groundwater and rainfall are the main sources of irrigation while canal and ground water is used to fulfil the crop water requirements (CWR) during summer. The objective of current study is to estimate how the irrigation water requirements (IWR) of the two crops are going to change under different conditions of temperature and rainfall. For this purpose, 12 different climatic scenarios were designed by combining the assumptions of three levels of temperature increase under dry, normal and wet conditions of rainfall. Weather records of 13 years (2000-2012) were obtained from PMD (Pakistan Meteorological Department) and CROPWAT model was used to simulate the IWR of the crops under normal and scenarios based climatic conditions. Both crops showed a maximum increase in CWR for temperature rise of $+2^{\circ}C$ i.e. 8.69% and 6% as compared to average. Maximum increment (4.1% and 17.51% respectively) in IWR for both wheat and rice was recorded when temperature rise of $+2^{\circ}C$ is coupled with dry rainfall conditions. March & April during winter and August & September during summer were the months with maximum irrigation requirements. Analysis also showed that no irrigation is needed for rice crop during May and June because of enough rainfall in this area.

  • PDF