Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2001.11b
/
pp.149-152
/
2001
In this paper, aging diagnosis method of CV cable was investigated. CV cable was designed for the sake of using during 30 years. Therefore it was important to evaluate the cable's remaining life because CV cable used for power transmission line since 1970's. CV cable was mainly installed at the underground owing to the environmental condition. If the cable accident occurred, it needs the much time for the accident recovery and the much damage at the industrial activity. therefore, this paper should study the direct leakage current method, a sort of the cables' aging test method
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2001.11a
/
pp.149-152
/
2001
In this paper, aging diagnosis method of CV cable was investigated. CV cable was designed for the sake of using during 30 years. Therefore it was important to evaluate the cable's remaining life because CV cable used for power transmission line since 1970's. CV cable was mainly installed at the underground owing to the environmental condition. If the cable accident occurred, it needs the much time for the accident recovery and the much damage at the industrial activity. therefore, this paper should study the direct leakage current method, a sort of the cables'aging test method.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
1994.05a
/
pp.46-49
/
1994
In order to investigate possibility of CV cable diagnosis technique, residual insulation characteristics of .long - term serviced 0.6 kV CV Cable are examined by DC leakage current residual voltage tensile strength, cross1inking density and AC & impulse breakdown. Also effect of cable structure and water tree are reported
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2001.07a
/
pp.601-604
/
2001
22.9 kV CV power cable is very important factor of underground distribution power line. Cyclic aging for 14days is performed to remove a large amount of the volatiles found in freshly manufactured cable. In this paper, we examined AC breakdown characteristics of CV power cable before and after cyclic aging for 14days. As the result, even if there were some exceptions, the AC breakdown voltage before aging was lower than that after aging, but most of the results were that the AC breakdown voltage after aging was lower than that before aging.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
1997.11a
/
pp.451-455
/
1997
The partial discharge has been blown as the chief breakdown of power equipments. The analysis and the recognition is much difficult because the partial discharge signal is very small and has complex aging pattern. Recently, insulation aging diagnosis based on pattern of phase(Ф), partial discharge magnitude(q), number(n) has been very important. Owing to depreciate the reappearance of aging progress at the electrical tree pattern and to be difficult to analyze visually, the study on partial discharge pattern is suggested to normalizing analysis method of partial discharge signals. This parer is purposed on prediction of life-time measurement of cv-cable, on decision of risk degree with normalization and real-time measurement of partial discharge signals for aging diagnosis of cv-cable. As normalizing the aging signals of electrical tree in cv-cable, it is able to confirm risk degree of insulation material with the distribution of Ф-q-n and recognize the process of aging pattern using neural network.
Diagnosis of cable insulation degradation has important meaning from a viewpoint of reliability enhancement of CV cable systems. So, we diagnosed 3.3kV & 6.6kV CV distribution cable on live-line which is judged to a most poor installation condition because they have been used in water condition after installation at the Yeochon chemical complex. The paper describes the analysis of the measured data, the problems at diagnosis, and the items which are considered at the development of diagnosis technology and equipment hearafter.
In this paper, we studied on life-decision of underground cable of live-lines state. As all equipments have been wear, underground cables decided design-life on the whole 30 years because underground cable have been occurred aging as time goes. CV cable has been become about 30 years after installation in the South Korea, is come to a important point of time with estimation about life. Study target cable is 22 kV CV cables in this point of view and installation cable is about 10 years before and behind. Measurement method used dc leakage method of live-lines state that applied voltage of 50V in neutral point and data is analyzing result that is measured during 5 years. In this result, insulation resistance could confirm that change according to season and cause is effect of humidity, seasons and load current. Also, according as data is gone aging, insulation resistance by Weibull distribution could confirm functionally its decrease. As a result, the aging speed of cable that water tree is gone could confirm fastness very. Numerical analysis result, cable that water tree is not gone could confirm that life of cable that has passed 10 years remains about $10{\sim}20$ years.
Crosslinked polyethylene (XLPE) insulated cables are now widely used all over the world for extra-high voltage underground transmission systems. Prefabricated type (compression type) joint has developed in order to shorten the assembly time and lower the possibility of contamination at site by many companies in the world. For outdoor termination, to control the electric field distribution as uniform as possible, especially for the use of extra-high voltage system. much of products are adopting the oil-impregnated condensor cone type instead of electric field control element which uses the permitivity of it only (not capacitance). For Gas-immersed termination, dimension of outer insulation bushing was determined by IEC Publication 859. The highest voltage of underground power cable system is 345kV now, in Korea. We have much of experiences of the development of prefabricated type accessories for CV cable systems (154kV, 161kV, 230kV level). So it was possible to inspect the proto type of accessories for 345kV CV cable system and seems that the need time for the development of products is reduced.
Because of the progress of civilization, outdoor electricity facilities as a street light, signal light and standing signboard etc. have being increased rapidly. Therefore the application of underground distributing wires is largely expended. In this paper, capacitance for the kinds of 600V CV cable is measured and leakage current for underground cable is calculated. The measurement of capacitance is done which there are defects of cable sheath or not Calculated leakage current is applied to choose the circuit breaker and the like.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.