• Title/Summary/Keyword: CONSTRUCTION WORKS OF WATER SUPPLY

Search Result 14, Processing Time 0.025 seconds

A Study on the Characteristics of Beach Sand as Fine aggregate of Concrete (해사의 기본성질과 잔골재로서의 이용 방안에 관한 연구)

  • Hwang, Kyung-Koo;Jun, Hyun-Woo
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.4
    • /
    • pp.4265-4273
    • /
    • 1976
  • 1. Fine aggregates of concrete are very important for the construction works and construction cost determination. Most of fine aggregates are from the river sand, but the amount of storage in the river side is steadily decreasing due to continuous construction works. Therefore, another source of fine aggregates is needed to meet increasied demand of sand. 2. Beach sand is a possible source of fine aggregates. But rust of steel bar is caused by CL-chemical of beach sand. Therefore, desalinization of beach sand is requested to get durable reinforced concrete. Economical methods of desalinization are as follows. (a) Flooding and drainage method. (b) Washing of beach sand with water supply and mixing. (c) Spreading of beach sand on the land and leaching by rain water for a few month. 3. Hardening of concrete with beach sand is accelerated due to salt, Thus early stage strength increase leads to make cracks. Also later stage strength decreases and durability becomes worse. By using appropriate admixture, the quality of concrete can be improved.

  • PDF

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction

  • Kim, Min-Gyu;Kang, Hyungjoo;Lee, Mun-Jik;Cho, Gun Rae;Li, Ji-Hong;Yoon, Tae-Sagm;Ju, Jaeheung;Kwak, Han-Wan
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.5
    • /
    • pp.361-370
    • /
    • 2020
  • We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it's trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.

Freshwater Fish Fauna of the Pyongchankang and Expected Impacts of Reduce of Constant River Flood in Youngwolgun, Kangwondo (강원도 평창강 일대의 어류상과 하천유지수량의 감소로 예측되는 영향)

  • 박병상
    • Korean Journal of Environment and Ecology
    • /
    • v.9 no.1
    • /
    • pp.42-48
    • /
    • 1995
  • Freshwater fish fauna in Pyongchangang in which having been constructed to water supply for Chechon city was carried out to clarify the impacts of ecosystem on freshwater fish as rapid reduction of constant river flood both Sep. 25, 1994 and Oct. 7, 1994 ~ Oct. 9, 1994. It was 28 species of 21 genera on 6 Families freshwater fishes including a natural monument at and many endemic species among 6 survey stations in Pyongchang. The Pyongchang that was moved in a zigzag direction having been keep constant flood and high diversity of freshwater fishes. There was a high possibility of serious extinction on freshwater fishes as rapid reduction of constant flood in Pyongchangkang.

  • PDF

A Study on the Improvement Effects of Soft Ground through In-Situ Construction of Quick Lime Pile (생석회파일 현장시험시공 통한 연약지반 개량효과에 관한 연구)

  • 천병식;고갑수;이용한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.41-48
    • /
    • 2000
  • Most land development projects and large scale civil works require a great amount of sand. And sand is also the most favorable material for soft ground improvement. The demand for sand is soaring rapidly due to increased number of projects regardless of its limited supply. Therefore, it is not difficult to predict that sand may become depleted and no longer be available as ground improvement material in the near future. Against this backdrop, developing an inexpensive sand-substitution material with an efficient accessibility will be necessary and urgently called for. So quick lime could be recommended as the substitutional material for sand. Quick lime is now preferred by forward developed nations. If Korea is able to take advantage of its abundant supply, economical efficiency could be achieved through massive production as well as being able to take advantage of utilization of natural resources. In this respect the purpose of this paper was to estimate improvement effect of soft ground though in-situ construction of quick lime pile. In-situ construction was peformed in road construction site of soft clay and in this study quick lime from Dan-yang that was estimated prominently in aspect of engineering characteristics was used. Quick lime piles were installed by 1.5m, 2.0m, 3.0m spacing to confirm improvement effect according to spacing and installed piles are 0.4m in diameter, up to 5m in length and the density of quick piles installed is 1.4 t/㎥. Vibrating wire pore water pressure cell was installed to confirm consolidation characteristics in surrounding of quick lime piles and both laboratory test and field test were carried out to confirm strength increase. In conclusion, soft ground improvement by quick lime piles was confirmed.

  • PDF

A Study on the Revision of Regulation to Develop for Supply of SI Separation in Long-Life Housing (장수명 공동주택의 SI분리공급 활성화를 위한 제도개선 방향설정 연구)

  • Chung, Joon-Soo;Kim, Soo-Am
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.11a
    • /
    • pp.475-478
    • /
    • 2008
  • In Korea, there has been a tendency that multi-family housings are constructed by providers such as constructors or real estate agents for the economical benefits and selling efficiency, using standardized plans, load-bearing wall system, water-based construction method, and uniformized formworks. Especially, the traditional installation works which service equipments are buried into structures cause serious problems such as shortening building life span, increasing times of remodeling during specific period (100 years) and wasting resources. Also the unilateral way of massive distribution by providers for multi-family housings is not appropriate to meet the various social needs of residents. To solve these problems, it is necessary to build long-life housing which can be easily separated installations, interior and exterior finishings from structural parts. Therefore, this paper will examine the present administrative law and the civil law in order to find negative factors that can be obstructions for providing long-life housings and set the direction to revise the regulations.

  • PDF