Distillery wastewater was used in a thermophilic laboratory-scale two stage anaerobic digester to test the effects of the redox potential of the first acidogenic reactor on the performance of the system. The digester consisted of first a acidogenic reactor and the an upflow anaerobic sludge blanket (UASB) reactor. The digestor was operated at a hydraulic retention time (HRT) of 48 h. Under these conditions, about 90% of the chemical oxygen demand as measured by the chromate method ($COD_{cr}$) was removed with a gas production yield of 0.4 l/g-COD removed. The redox potential of the acidogenic reactor was increased when the reactor was purged with nitrogen gas or agitation speed was increased. The increase in reduction potential was accompanied by an increase in acetate production and a decrease in butyrate formation. A similar trend was observed when a small amount of air was introduced into the acidogenic reactor. It is believed that the hydrogen partial pressure in the acidogenic reactor was decreased by the above mentioned treatments. The possible failure of anaerobic digestion processes due to over-loading could be avoided by the above mentioned treatments.
The aim of this study was evaluated the effects of total rainfall, rainfall intensity and antecedent dry days and identify the correlation analysis with the EMC removal efficiency, in order to provide an understanding of the operation and maintenance factors of constructed wetland in flood pumping station. This study was conducted total of 20 monitoring in a catchment(326.2 ha) of constructed wetland in Ga-un flood pumping station located at the downstream of the Wang-suk stream. The determined EMC removal efficiencies were $36.04{\pm}9.45%$ for BOD, $38.50{\pm}13.50%$ for $COD_{Mn}$, $34.34{\pm}13.05%$ for TN and $34.22{\pm}14.27%$ for TP, respectively. These results showed that the pollutants concentration and EMC were reduced while passing through the constructed wetland. In the correlation analysis, the highly correlations with EMC removal efficiency of BOD and $COD_{Mn}$ were observed for total rainfall and rainfall intensity (P<0.05). However, the correlations were not found with TN and TP for rainfall variables.
This study was performed to increase the removal efficiency of the biofilter packed with granular sulfur in municipal wastewater reclamation facility. Constituent units were influent water tank, denitrification tank, BOD reduction tank and outlet. And, the major operation factor is a biofilter packed with submerged granular sulfur. Actual wastewater and synthetic wastewater were used as influent wastewater. Experimental condition was divided into two phases according to the amount of a phosphorus coagulant. Total phosphorus removal efficiency was insignificant at mode I that phosphorus coagulant was not injected. The average influent and effluent total phosphorus concentrations at mode II were 0.5 ~ 1.0 mg/L and 0.27 mg/L, respectively. As for COD and BOD effluent concentrations, COD was 3.0 mg/L and BOD was 1.0 mg/L. Additionally, nitrogen removal rates were high at low influent DO concentration. In conclusion, a new process, biofilter packed with granular sulfur is expected to treat high-rate nitrogen wastewater and expected to be utilized as an alternative of technological innovation for the nitrogen treatment.
The purpose of this study was to evaluate the effects of different Hydraulic Retention Times (HRTs) on the contaminant removal efficiency using Aerobic Granular Sludge (AGS). A laboratory-scale experiment was performed using a sequencing batch reactor, and the Chemical Oxygen Demand (COD), nitrogen, orthophosphate removal efficiency, AGS/MLSS ratio, and precipitability in accordance with the HRT were evaluated. As a result, the COD removal efficiency was not significantly different with the reduction in HRT, and at a HRT of 6 h, the removal rate was slightly increased owing to the increase in organic loading rate. The nitrogen removal efficiency was improved by injection of influent division at a HRT of 6 h. As the HRT decreased, the MLSS and AGS tended to increase, and the sludge volume index finally decreased to 50 mL/g. In addition, the size of the AGS gradually increased to about 1.0 mm. Therefore, the control of HRT provides favorable conditions for the stable formation of AGS, and is expected to improve the contaminant removal efficiency with the selection of a proper operation strategy.
Sediment works as a resource for electric cells. This paper was designed in order to verify how sediment cells work with anodic material such as metal and carbon fiber. As known quite well, sediment under sea, rivers or streams provides a furbished environment for generating electrons via some electron transfer mechanism within specific microbial population or corrosive oxidation on the metal surfaces in the presence of oxygen or water molecules. We experimented with one type of sediment cell using different anodic material so as to attain prolonged, maximum electric power. Iron, Zinc, aluminum, copper, zinc/copper, and graphite felt were tested for anodes. Also, combined type of anodes-metal embedded in the graphite fiber matrix-was experimented for better performances. The results show that the combined type of anodes exhibited sustainable electricity production for ca. 600 h with max. $0.57\;W/m^2$ Al/Graphite. Meanwhile, graphite-only electrodes produced max. $0.11\;W/m^2$ along with quite stationary electric output, and for a zinc electrode, in which the electricity generated was not stable with time, therefore resulting in relatively sharp drop in that after 100 h or so, the maximum power density was $0.64\;W/m^2$. It was observed that the corrosive reaction rates in the metal electrodes might be varied, so that strength and stability in the electric performances(voltage and current density) could be affected by them. In addition to that, COD(chemical oxygen demand) of the sediment of the cell system was reduced by 17.5~36.7% in 600 h, which implied that the organic matter in the sediment would be partially converted into non-COD substances, that is, would suggest a way for decontamination of the aged, anaerobic sediment as well. The pH reduction for all electrodes could be a sign of organic acid production due to complicated chemical changes in the sediment.
Park, Tae-Yang;Kim, Sung-Jae;Jang, Jeong-Ryeol;Choi, Kang-Won;Kim, Sang-Min
Journal of agriculture & life science
/
v.45
no.5
/
pp.97-103
/
2011
The purpose of this study was to analyze the pollutant reduction effect for non-irrigated crop land by nonpoint source pollution control. For a field scale monitoring, 6 plots (5m width and 22m length) and 3 sediment traps were installed. At the outlet of each plot, the stage gauges were installed for runoff monitoring. For a rainfall monitoring, tipping bucket rain gage was installed within the experiment site. Through the artificial irrigation, runoff from the plots were monitored. The SS, TOC, T-N, T-P, COD, NTU of sampled water were analyzed by standard methods. The SS, TOC, T-N, T-P, COD, NTU concentration of initial runoff were 15.00, 1.54, 5.27, 0.07, 4.72, 0.45mg/L, respectively. Four hours later than the initial runoff, the concentration was changed to 1.00, 0.94, 4.06, 0.01, 0.60, 0.33 mg/L, respectively. As a result of artificial irrigation, three out of four sediment traps were filled with runoff water from the experimental plots. One sediment trap was not filled with runoff water because the artificial irrigation was not supplied for two experimental plots. The stage of sediment traps were gradually lowered. However, the water quality didn't showed a decrease trend as the stage went down because the suspended solid was not equally collected during the water sampling.
For the practical application and development of biopolymer flocculant Biopol32 produced by Pseudomonas sp. GP32, its flocculation effect on wastewater from food processing, slaughter houses, and the dyeing industry was investigated. In the food processing wastewater, Biopol32 led to a chemical oxygen demand (COD) reduction rate of 70% and a suspended solid (SS) removal rate of 49% at pH 6.0. In the slaughter house wastewater at pH 4.0, a COD reduction rate of 61% and SS removal rate of 91% were observed, and in the dyeing wastewater, the rates were 72% and 92%, respectively, at pH 5.0. The size of floc formed during the flocculation process was 10 mm at a final concentration of 20 ppm, and the dehydration efficiency was 62%. In both the bioflocculant Biopol32 group and a PAA synthetic flocculant group, optimal flocculant concentration that yielded the best overall dehydration efficiency was 20 ppm, and, at this concentration, the shortest filtration time to reach the natural critical moisture content of 78.1% was attained.
Journal of the Korean Society of Environmental Restoration Technology
/
v.18
no.5
/
pp.27-36
/
2015
This study was conducted to grasp the effect of afforestation of cut slope using coir blocks on the improvement of scenery and the management of non point pollution source. Total four experimental tanks such as general soil slope, coir blocks, installation slope, slope refilling the inside of coir blocks slope with pebble, slope refilling the inside of coir blocks with soil and plant were installed, pollution source water was supplied and the possibility of reduction management of non point pollution source was analyzed at four items of COD, SS, T-N, T-P and main results drawn from this study are as follows. In conclusion, biodegradable materials like coir blocks and soil and plant layers are judged to be helpful in reduction management of non point pollution source inflowing to water space from land area. Thus, the reduction of non point pollution source occurring at land area is thought to be fully controlled at the cut slope, the space prior to inflowing to water ecological space like a stream or a swamp area.
The river water source of Saidabad Surface Water Treatment Plant at Dhaka, Bangladesh, is deteriorated too much to be treated by conventional treatment process due to excessive ammonia pollution. In order to improve the raw water quality before it enters into the main treatment chain, a pilot study was conducted for pre-treatment of the raw water. The objective is to investigate the rate of reduction of ammonia using the Meteor pilot, a biological pretreatment system, which is a laboratory scale Moving Bed Biofilm Reactor with a nominal volume of hundred liters, filled with 50 L of Meteor 660 media. The reduction of ammonia was quite significant on average 73%, while the reduction of COD was in a range from 20 to 60%. The Meteor pilot was able to treat and nitrify the raw water and produce an effluent that respects the guarantee of ammonia < $4.0mg\;NH_3-N/L$ when the raw water ammonia concentration was < $15mg\;NH_3-N/L$. The study identified operating parameters necessary to achieve the desired goal of adequate ammonia removal. The study results would benefit a range of systems across the country by providing guidance on the design and operation of a biological pre-treatment system for ammonia removal.
Kim, Hyung-Jin;Song, Chang-Soo;Kim, Dong-Wook;Pagilla, Kishna-R.
Environmental Sciences Bulletin of The Korean Environmental Sciences Society
/
v.10
no.S_1
/
pp.35-40
/
2001
Effect of the addition of an enzyme/microbial additive(EMA) to enhance anaerobic digestion of the primary sludge was investigated. Two laboratory scale anaerobic digester were operated with primary sludge taken from a municipal wastewater treatment plant. The digester receiving EMA with the sludge feed performed better than the control digester, when both were operated at 10-days and 15-days Solid Retention Time(SRT). Addition of EMA to the experimental digester provided 7%(10-days SRT) and 16%(15-days SRT) higher gas production compared to the control digester when both were fed with the same amount of volatile solids. The reduction in volatile solids was 24% better in the experimental digester compared to the control ar 10-days SRT, and the improvement 10% at 15-day SRT. Improvement in COD reduction, and fecal coliform density reduction were also seen in the experimental digester due to EMA addition compared to the control both ar 10-days SRT and 15-day SRT operation. Preliminary cost benefit analysis for a wastewater treatment plant showed that approximately $115/day in gas production improvements can be realized upon addition of EMA to primary sludge anaerobic digesters operating at 10-day SRT. The value of increased gas production was $172/day if the same digesters are operated with EMA addition at 15-day SRT.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.