• 제목/요약/키워드: CIP wall

검색결과 28건 처리시간 0.024초

Numerical Study on Characteristics of Ship Wave According to Shape of Waterway Section

  • Hong Chun-Beom;Lee Sang-Min
    • Journal of Mechanical Science and Technology
    • /
    • 제19권12호
    • /
    • pp.2263-2269
    • /
    • 2005
  • The ship wave phenomena in the restricted waterway were investigated by a numerical analysis. The Euler and continuity equations were employed for the present study. The boundary fitted and moving grid system was adopted to enhance the computational efficiency. The convective terms in the governing equations and the kinematic free surface boundary condition were solved by the Constrained Interpolated Profile (CIP) algorithm in order to solve accurately wave heights in far field as well as near field. The advantage of the CIP method was verified by the comparison of the computed results by the CIP and the Maker and Cell (MAC) method. The free surface flow simulation around Wigley hull was performed and compared with the experiment for the sake of the validation of the numerical method. The present numerical scheme was applied to the free surface simulation for various canal sections in order to understand the effect of the sectional shape of waterways on the ship waves. The wave heights on the side wall and the shape of the wave patterns with their characteristics of flow are discussed.

지반 굴착시 지하수위가 벽체에 미치는 영향 분석 (Effect of Ground Water Table on Deep Excavation Performance)

  • 송주상;;유충식
    • 한국지반신소재학회논문집
    • /
    • 제17권3호
    • /
    • pp.33-46
    • /
    • 2018
  • 본 논문에서는 대심도 굴착시 흙막이 벽체에 대한 실내 모형실험 결과를 다루었다. 지반의 지하수위와 벽체의 강성등의 영향인자가 흙막이 벽체 및 지반 거동에 미치는 영향에 대한 정성적 고찰을 위하여 기존 CIP 벽체와 CS-H벽체의 휨강성에 따른 상사법칙을 적용하여 제작 및 사용하여 모형실험을 수행하였으며, 실제 현장을 모사하여 버팀보 설치 및 굴착을 진행하였다. 또한 벽체, 지반 거동 분석을 위하여 PIV 분석을 수행하였으며, 벽체변위, 지반침하 및 지반 수평변위를 분석하여 지하수위가 높아질수록 벽체 강성이 작아질수록 변위가 커지는 것을 확인하였다.

CSB (Confined Socket Bolt) 전단연결재의 전단 성능 평가 (Evaluation of Shear Performance for CSB (Confined Socket Bolt) Shear Connector )

  • 황승현;문주현;홍종국;전종철;심재일
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제27권2호
    • /
    • pp.8-16
    • /
    • 2023
  • 이 연구에서는 흙막이용 CIP(cast in placed pile)를 영구적인 지하외벽으로 활용하기 위해 제시한 CSB(confined socket bolt) 전단연결재의 전단 성능을 평가하였다. CSB 전단 성능 평가를 위한 푸쉬아웃(push-out) 실험의 주요 변수는 CIP의 종류, CSB 전단연결재 종류, L/d, 무근 콘크리트, 방수재 및 철근콘크리트 말뚝의 압축강도로 설정하였다. 실험결과, H-형강 말뚝 실험체들의 파괴모드는 모두 CSB 전단연결재 파단에 의해 지배되었다. 철근콘크리트 말뚝 실험체들의 파괴모드는 철근콘크리트 말뚝의 압축강도가 증가할수록 콘크리트의 파괴보다 CSB 전단연결재의 파단에 의해 지배되었다. 고강도 볼트 및 이형철근의 CSB 전단연결재 실험체의 최대 내력은 일반강도 볼트의 CSB 전단연결재 실험체에 비해 H-형강 말뚝의 경우 약 1.22배 및 1.20배 높았으며, 철근콘크리트 말뚝의 경우 약 1.10배 및 1.16배 높았다. 그리고 푸쉬아웃 실험에서 최대 내력은 CSB 전단연결재의 길이 및 철근 중첩에 대한 영향이 미미하였다. KDS 기준에 의해 산정된 전단내력은 실험결과를 안전측으로 평가하였다.

CWS(Continuous Wall System)II 공법의 특성 및 적용성 (Characteristics and Applicability of CWS(Continuous Wall System)II Method)

  • 임인식;이정배;김재동;이재호;우성우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

SPW 흙막이 벽체의 설계요소별 부재력과 수평변위 및 콘크리트강도 특성 연구 (A Study on the Characteristics of Member Force, Horizontal Displacement and Concrete Strength by Design Elements of SPW Retaining Walls)

  • 김완호;신유석;이영진;장용채;이강일
    • 한국지반신소재학회논문집
    • /
    • 제22권1호
    • /
    • pp.75-85
    • /
    • 2023
  • 굴착공사가 이루어지는 지역에서는 지하수위 변화와 지반침하를 최소화하기 위한 흙막이 벽체 공법 선정이 매우 중요하다. 이러한 측면에서 CIP 공법의 단점을 보완할 수 있는 SPW 공법은 국내 흙막이 벽체 시공 시 점차 증가하는 추세이다. 이러한 여건을 고려하여 본 연구에서는 SPW 공법의 설계요소와 흙막이 벽체의 구조적 안정요소간 상호 특성에 대하여 연구하였다. 여기서, 흙막이 벽체의 설계요소는 말뚝 간 겹침길이, 말뚝직경, H형강 보강재 규격이며 이에 따른 흙막이 벽체의 구조적 안정요소는 흙막이 벽체의 휨응력, 전단응력, 수평변위, 콘크리트 강도이다. 연구 결과 H형강 보강재의 부재력에 큰 영향을 미치는 설계요소는 말뚝직경과 H형강 보강재 규격이며, 수평변위에 큰 영향을 미치는 설계요소는 말뚝직경과 말뚝 간 겹침길이인 것으로 나타났다. 또한, 콘크리트 강도에 큰 영향을 미치는 설계요소는 말뚝직경과 H형강 보강재 규격인 것으로 나타났다.

가설흙막이의 버팀대 선행하중량과 흙막이 벽체 변형등에 대한 분석

  • 김학청;정광렬
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.35-44
    • /
    • 2006
  • Supporting method of a Temporary retaining wall for underground excavation project are adopted by systems of strut, anchor, nail, raker, etc. Strut system and Raker system of these methods are mostly used preloading jack to minimize deformations of retaining wall. We determinate efficient preloading to analysis these strut-preloadings, deformations of retaining wall, axial forces, and etc.. This study is analysed that preloading applied 0%, 10%, 20%, 30%, ...., 100% for strut and raker installed by CIP temporary retaining wall. This study results that adequate preloadings were determined to analysis correlations of preloading, deformations of wall, maximum bending moment, axial force of strut, and displacement of surrounding.

  • PDF

현장타설 끼움 전단벽 및 철골가새를 활용한 기존 학교 건물의 내진보강 (Seismic Retrofit of an Existing School Building using CIP-Infilled Shear Walls and Steel Braces)

  • 윤길호;김성호;김용철;윤현도
    • 교육시설 논문지
    • /
    • 제19권4호
    • /
    • pp.21-28
    • /
    • 2012
  • This study proposes a procedure for evaluating the seismic performance and retrofit of a typical reinforced building (R/C) school buildings contructed in the 1980s. The procedure is derived from the Japanese Standard for Evaluation of Seismic Capacity of Existing Reinforced Concrete Buildings and Nonlinear Static Procedure (NSP) specified in Federal Emergency Management Agency (FEMA 356). In this study, the Japanese Standard was applied for evaluating the additionally required seismic performance in the existing school building. Cast-in-place (CIP) reinforced concrete infill walls and steel braces were used to seismically retrofit the existing school building located in the region of Hongsung in Chungnam. In the pushover analysis, i.e NSP, the hinge properties of columns, beams, infill walls and steel braces were carefully calibrated based on the existing experiment results in the available literatures. The predicted seismic performance for the retrofitted building was compared to that for the virgin building. Based on the seismic evaluation with the Japanese Standard and the FEMA 356 criteria, the addition of CIP reinforced concrete infill walls and steel braces have superior constructablility and can improve effectively the seismic performance of the existing school buildings constructed in 1980s.

대심도 지반굴착을 위한 벽강관말뚝 흙막이공법의 설계 사례 연구 (The Case Study of Design on Steel Pipe Sheet Pile for Earth Retaining Wall on Deep Excavation)

  • 김병일;이종구;김경태;홍강한;한상재
    • 한국지반신소재학회논문집
    • /
    • 제22권1호
    • /
    • pp.53-66
    • /
    • 2023
  • 본 연구에서는 대규모 지반굴착 조건에서 흙막이 벽체로 적용된 벽강관말뚝의 탄소성보 해석, 유한요소 해석 및 최적화 설계 등의 결과를 제시하였다. 본 연구를 통해 고강도 내해수강 벽강관의 경우 부식에도 유리하고 허용응력이 커 구조적으로 우수하여 흙막이 벽체로써 활용성이 높고, C-Y형 이음부의 경우 기존 P-P형 대비 인장강도와 강성이 크게 개선되었음을 알 수 있었다. 또한, 시공 중 벽체 누수나 결함이 발생하더라도 용접, 덧댐 시공 등으로 확실한 보수가 가능한 장점이 있는 것으로 조사되었다. 벽강관 연속벽의 경우 CIP나 Slurry wall 대비 변위 순응 구조임과 동시에 동일 수평변위에 대하여 허용 휨응력이 매우 커 대심도 흙막이 측면에서 가장 우수한 것으로 평가되었다. 대규모 편토압 조건에서의 지반굴착임을 고려하여 탄소성보해석 및 유한요소 해석을 실시하고, 그 결과를 상호 비교한 결과, 굴착 시 전체적인 거동, 벽체의 변위나 부재력 등 각 항목별 발생 최대값에 대해서도 두 방법간에는 정량적 수치가 유사한 것으로 나타나 추후 설계 시 두 해석방법 모두 적용가능한 것으로 나타났다. 마지막으로, 동일 직경에서 가장 두꺼운 두께의 중공형보다는 가장 얇은 두께에 콘크리트로 속채움하는 방법, 그리고 변위와 부재력의 급격한 변화가 없는 깊이 즉, 정상성 검토를 통한 근입길이 결정 시 경제적인 설계가 가능함을 알 수 있었다.

해안매립지반에서의 토류가시설 시험시공 및 변경사례 (A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land)

  • 황영철;김기림;김연정
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

CWS(Continuous Wall System) II 공법의 개발 및 적응에 관한 연구 (Study on Development and Application of CWS(Continuous Wall System) II Method)

  • 임인식;이정배;최선영;이재호;우성우
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.57-64
    • /
    • 2009
  • CWS I method developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWS II method was carried out in order to accomplish the CWS I method reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWS II method as well as the progress of execution was discussed by comparing with existing methods.