• Title/Summary/Keyword: CDM project

Search Result 67, Processing Time 0.036 seconds

A Possibility for Multilateral CDM Projects in Northeast Asia - The reduction effect in transaction cost by Korean participation - (동북아시아지역의 다국 간 CDM프로젝트에 대한 검토 -한국 참가에 따른 거래비용 삭감효과-)

  • Jung, Woo-Jong;Nakano, Satoshi
    • Journal of Environmental Policy
    • /
    • v.2 no.2
    • /
    • pp.41-63
    • /
    • 2003
  • CDM(Clean Development Mechanism) project is said to be a mechanism, which profits both the investing country and the host country, while additionally contributing to the reduction of greenhouse gases of the earth as a whole. However in reality, most of the proposed projects do not end up in agreement because of the problems related to differences in recognition between the investing country and the host country of the CDM project. This outlines the background for this research which proposes a new design of institutional arrangements of CDM projects in the Northeast Asian region, mainly Japan, China and Korea. In addition, we investigate the feasibility of the proposed design. The research firstly focuses on the reduction in transaction costs that the participation of Korea will have on a Japan-China CDM project. This paper further emphasizes the potential gains that would materialize if a CDM project involved the whole Northeast Asian region, and not only one country. Our research suggests that an approximate reduction of 23% in transaction costs, and about 4% reduction in the total costs of a CDM project can be expected to follow the Korean participation. In addition to decreasing costs we find that a Korean involvement in a CDM project with Japan will lead to efficiency gains illustrated by a higher increase in the IRR(Internal rate of return) in a Japan-Korea project(11.45% to 12.21%) compared to an IRR incresement of 10.57% to 11.27% for a pure Japanese CDM project. Similar results of a rise in the IRR is found for the whole investment period of 20 years. We can hence conclude that Korean participation in a Japan-China CDM project would improve the implementation possibilities of CDM project in the Northeast Asia region.

  • PDF

Study on Gangwon Wind Park CDM project (강원풍력발전 CDM 사업 사례 연구)

  • Park, Keum-Joo;Jung, Jae-Soo;Lee, Moon-Gu;Kim, Doo-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.298-303
    • /
    • 2006
  • CDM(Clean Development Mechanism) is one of three Kyoto mechanisms. As a non-annex I party of UNFCCC, Korea can host CDM projects. Currently eight CDM projects are hosted in Korea under Kyoto protocol. Six of these CDM projects are related to renewable energy power generation. Renewable energy power plants assumes zero GHGs emission and has great potential to become CDM projects which is very environmental friendly energy Gangwon wind park CDM project is the first renewable CDM project in Korea. In this research, emission factors and additionality proving process are studied, which are important procedures of doing CDM project.

  • PDF

Study on Gangwon Wind Park CDM project (강원풍력발전 CDM 사업 사례 연구)

  • Park, Keum-Joo;Jung, Jae-Soo;Lee, Moon-Gu;Kim, Doo-Hoon
    • New & Renewable Energy
    • /
    • v.2 no.1 s.5
    • /
    • pp.66-71
    • /
    • 2006
  • CDM(Clean Development Mechanism) is one of three Kyoto mechanisms. As a non-annex I party of UNFCCC, Korea can host CDM projects. Currently eight CDM projects are hosted in Korea under Kyoto protocol. Six of these CDM projects are related to renewable energy power generation. Renewable energy power plants assumes zero GHGs emission and has great potential to become COM projects which is very environmental friendly energy. Gangwon wind park CDM project is the first renewable CDM project in Korea. In this research, emission factors and additionality proving process are studied, which are important procedures of doing CDM project.

  • PDF

Real Option Analysis on Posco A/R CDM Project under CER Price Uncertainty (CER 가격 불확실성을 고려한 A/R CDM 사업의 실물옵션 분석: 포스코 A/R CDM 사업 분석)

  • Hong, Wonkyung;Park, Hojeong
    • Environmental and Resource Economics Review
    • /
    • v.20 no.3
    • /
    • pp.459-487
    • /
    • 2011
  • A/R CDM project has properties such as irreversibility and uncertainty that Real Option Analysis can be applied to its modelling. This study tries to model A/R CDM using Real Option under CER price uncertainty, and conducts empirical test with the Posco A/R CDM Project case. For precise comparison and decision-making, l-CER's expected present value is calculated from the Spot CER price. As a result, the critical value of the project is lower than the expected l-CER price, which means that the decision to invest made by the project owner is profitable. We can also find out that the level and the range of the discount rate, where is applied to, affect the result; the critical value of the project and the decision-making.

  • PDF

Applications and prospect of CDM project through recycling of inorganic waste (무기질(無機質) 폐기물(廢棄物)의 재활용(再活用)을 통한 CDM 사업(事業) 적용사례(適用事例) 및 전망(展望) - 시멘트 산업(産業)을 중심(中心)으로 -)

  • Cho, Jin-Sang;Cho, Kye-Hong;Ahn, Ji-Whan;Um, Seong-Il;Yeon, Kyu-Seok
    • Resources Recycling
    • /
    • v.20 no.2
    • /
    • pp.3-15
    • /
    • 2011
  • Current, Registration fields of CDM projects are being conducted in a variety of parts such as mostly energy, chemical processing and manufacturing processes. However, there are not many CDM project registrations by recycling of inorganic waste. In this paper, analysis abroad CDM project and applications in order to review possibility of CDM project registration through the recycling of domestic inorganic waste were investigated. As a results, registered case of CDM project by inorganic waste recycling was researched to registrate in raw material alternative field of cement industry that inorganic waste can be used in large quantities. Application prospects of CDM project in Korea will be possible to analysis industrial scale, industry using inorganic raw materials, green house gas emissions and inorganic waste generated in large quantities.

An Analysis on the Invest Determinants of CDM Project: Evidence from Waste Handling and Disposal Sector (CDM 사업부문별 투자비용 결정요인 분석: 폐기물 부문을 대상으로)

  • Kim, Jihoon;Lim, Sungsoo
    • Korean Journal of Organic Agriculture
    • /
    • v.28 no.4
    • /
    • pp.535-553
    • /
    • 2020
  • In this study, the characteristics of the waste sector CDM project were analyzed through cluster analysis of the waste sector CDM project and the analysis of the CDM investment cost in waste sector using CDM project data registered with UNFCCC since 2008 when EU ETS phase 2 began. As of September 2020, 772 cases of CDM projects in waste disposal and disposal are registered. Biogas technology is the largest, followed by livestock manure processing and biomass production technology. The results of the cluster analysis are summarized as follows: First, on average, projects utilizing AWMS technology are small in size and relatively low in investment costs. This is judged to be relatively low investment costs due to previously attracted foreign investment capital. Second, the average investment cost of CDM projects considered along with waste (No.13), the energy industry (No.1) and agriculture (No.15) was higher than those involving only waste. The analysis of the factors determining the investment cost of the waste sector CDM project showed that, as with cluster analysis, the AWMS technology, which is a livestock manure treatment technology, was lower in the investment cost than those that use other technologies. As a result of multiple regression analysis, the investment cost of the CDM project was analyzed lower in the order of biomass, AWMS, LFG and biogas. Also, the higher the investment cost for CDM projects linked to waste, energy and agriculture, and the better the investment environment, the higher the investment cost. Although no statistical feasibility was obtained, the larger the annual emission reduction, the lower the CDM investment cost.

An Economic Feasibility Study of AR CDM project in North Korea (북한 지역을 대상으로 한 조림 CDM 사업의 경제적 타당성 연구)

  • Han, Ki Joo;Youn, Yeo-Chang
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.235-244
    • /
    • 2007
  • Potentials of AR CDM project in North Korea are assessed and feasible land area for AR CDM project is estimated. According to our estimation, There could be 515,000 hectares of forest lands deforested before 1990 in North Korea and 8,854 hectares at the regional level of Gae-sung City, which are eligible for AR CDM project, based on researches of satellite image analyses conducted from 1980's to 1990's. A baseline scenario assumed 44.73 tones of carbon stored in soil per hectare with no vegetation above ground remained during the project period following the default value of IPCC's Good Practice Guidance for LULUCF considering soil structure, climate and land use of the project area. The scenario also assumes that black rocust (Robinia pseudoacacia) is planted and the CDM project is implemented for 20 years. The costs for producing greenhouse gases CER (certified emission reduction) credits include costs of tree planting and forest management, and costs of project negotiation and transactions for issuing the credits. It is estimated that 376 tones of carbon dioxide per hectare can be accumulated and 503 temporary CER credits per hectare and 265 long-term CER credits per hectare could be produced during the project period. It is estimated to cost US$ 4.04 and US$ 7.67 to provide one unit of temporary credit and long-term credit, respectively. These values can be regarded as the cost of conferring emission commitment of a country or a private entity. However, it is not clear which option is better economically because the replacement periods are different in these two cases.

An Economic Analysis of Industrial Forest Plantation and A/R CDM Project in Indonesia (인도네시아에서의 산업조림과 A/R CDM 사업 경제성 분석)

  • Park, Chongho;Kwon, Kiwon;Kim, Sebin
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.348-356
    • /
    • 2007
  • The purpose of this study is to give the results of economic feasibility of industrial forest plantations, and also A/R CDM project in Indonesia to investors. In order to analyze economic feasibility of the industrial forest plantation and A/R CDM project, this study comparatively analyzes the feasibility based on three following scenarios: industrial plantation type; A/R CDM type; combination type of industrial plantation and A/R CDM project. In the aspect of IRR, the combination type has 11 % while the industrial plantation type has 8%. If the price of timber increases USD $5/m^3$ (from the standard price: USD $30/m^3$ to USD $35/m^3$), IRR of the industrial plantation type will increase from 8% to 14%. This result shows us that the IRR of the industrial plantation type is very sensitive to the price of timber. There is no economic feasibility of A/R CDM project if the price of lCER is under USD 5. In addition, IRR of the A/R CDM project type is the same to IRR of industrial plantation type (8%) when the price of lCER is USD 10. Finally, the total investment expenditure on 12,000ha of the combination type is approximately 13 billion won while the industrial plantation type is 13.6 billion won. It takes 11 year to reach the turning point in terms of profitability of the combination type while the industrial plantation takes 13 year. Thus, the economic feasibility of the combination type is higher than the other types(industrial plantation type and A/R CDM project type).

Predicting the success of CDM Registration for Hydropower Projects using Logistic Regression and CART (로그 회귀분석 및 CART를 활용한 수력사업의 CDM 승인여부 예측 모델에 관한 연구)

  • Park, Jong-Ho;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.65-76
    • /
    • 2015
  • The Clean Development Mechanism (CDM) is the multi-lateral 'cap and trade' system endorsed by the Kyoto Protocol. CDM allows developed (Annex I) countries to buy CER credits from New and Renewable (NE) projects of non-Annex countries, to meet their carbon reduction requirements. This in effect subsidizes and promotes NE projects in developing countries, ultimately reducing global greenhouse gases (GHG). To be registered as a CDM project, the project must prove 'additionality,' which depends on numerous factors including the adopted technology, baseline methodology, emission reductions, and the project's internal rate of return. This makes it difficult to determine ex ante a project's acceptance as a CDM approved project, and entails sunk costs and even project cancellation to its project stakeholders. Focusing on hydro power projects and employing UNFCCC public data, this research developed a prediction model using logistic regression and CART to determine the likelihood of approval as a CDM project. The AUC for the logistic regression and CART model was 0.7674 and 0.7231 respectively, which proves the model's prediction accuracy. More importantly, results indicate that the emission reduction amount, MW per hour, investment/Emission as crucial variables, whereas the baseline methodology and technology types were insignificant. This demonstrates that at least for hydro power projects, the specific technology is not as important as the amount of emission reductions and relatively small scale projects and investment to carbon reduction ratios.

Analysis of Modality and Procedures for CCS as CDM Project and Its Countmeasures (CCS 기술의 CDM 사업화 수용에 대한 방식과 절차 분석 및 대응방안 고찰)

  • Noh, Hyon-Jeong;Huh, Cheol;Kang, Seong-Gil
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.3
    • /
    • pp.263-272
    • /
    • 2012
  • Carbon dioxide, emitted by human activities since the industrial revolution, is regarded as a major contributor of global warming. There are many efforts to mitigate climate change, and carbon dioxide capture and geological storage (CCS) is recognized as one of key technologies because it can reduce carbon dioxide emissions from large point sources such as a power station or other industrial installation. The inclusion of CCS as clean development mechanism (CDM) project activities has been considered at UNFCCC as financial incentive mechanisms for those developing countries that may wish to deploy the CCS. Although the Conference of the Parties serving as the Meeting of the Parties to the UNFCCC's Kyoto Protocol (CMP), at Cancun in December 2010, decided that CCS is eligible as CDM project activities, the issues identified in decision 2/CMP.5 should be addressed and resolved in a satisfactory manner. Major issues regarding modalities and procedure are 1) Site selection, 2) Monitoring, 3) Modeling, 4) Boundaries, 5) Seepage Measuring and Accounting, 6) Trans-Boundary Effects, 7) Accounting of Associated Project Emissions (Leakage), 8) Risk and Safety Assessment, and 9) Liability Under the CDM Scheme. The CMP, by its decision 7/CMP.6, invited Parties to submit their views to the secretariat of Subsidiary Body for Scientific and Technological Advice (SBSTA), SBSTA prepared a draft modalities and procedure by exchanging views of Parties through workshop held in Abu Dhabi, UAE (September 2011). The 7th CMP (Durban, December 2011) finally adopted the modalities and procedures for CCS as CDM project activities (CMP[2011], Decision-/CMP.7). The inclusion of CCS as CDM project activities means that CCS is officially accredited as one of $CO_2$ reducing technologies in global carbon market. Consequently, it will affect relevant technologies and industry as well as law and policy in Korea and aboard countries. This paper presents a progress made on discussion and challenges regarding the issue, and aims to suggest some considerations to policy makers in Korea in order to demonstrate and deploy the CCS project in the near future. According to the adopted modalities and procedures for CCS as CDM project activities, it is possible to implement relevant CCS projects in Non-Annex I countries, including Korea, as long as legal and regulatory frameworks are established. Though Korea enacted 'Framework Act on Low Carbon, Green Growth', the details are too inadequate to content the requirements of modalities and procedures for CCS as CDM project. Therefore, it is required not only to amend the existing laws related with capture, transport, and storage of $CO_2$ for paving the way of an prompt deployment of CCS CDM activities in Korea as a short-term approach, but also to establish the united framework as a long-term approach.