• Title/Summary/Keyword: CCPP

Search Result 28, Processing Time 0.027 seconds

Security Evaluation Criteria for Firewalls in Kirea

  • Lee, Cheol-Won;Hong, Ki-Yoong;Kim, Hak-Beom;Oh, Kyeong-Hee;Kwon, Hyun-Jo;Sim, Joo-Geol
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.8 no.3
    • /
    • pp.63-78
    • /
    • 1998
  • Recently, to use the evaluated firewall is recognized as a solution to achieve the security and reliability for government and organizarions in Korea. Results of firewall evaluation using ITSEC(Information Technology Security Evaluation Criteria) and CCPP(Common Criteria Protection Peofile)have been announced. Because there are problems to apply ITSECor CCPP for the firewall evaluation in korea environment, korea government and korea Information security Agency (KISA) decided to develop our own security dvaluation critrtia fir firewalls.As a result of the efforts, Korea firewall security evaluation criteria has been published on Feb. 1998. In this paper, we introduce Korea security evaluation criteria for firewalls. The ceiteria consists of functional and assurance requirements that are compatible with CC Evaluation Assurance Levels(EALs)

Analysis of the Influence of Anti-icing System on the Performance of Combined Cycle Power Plants (가스터빈 결빙방지 시스템이 복합화력발전 시스템의 성능에 미치는 영향)

  • Moon, Seong Won;Kim, Jeong Ho;Kim, Tong Seop
    • The KSFM Journal of Fluid Machinery
    • /
    • v.19 no.6
    • /
    • pp.19-25
    • /
    • 2016
  • Anti-icing is important in gas turbines because ice formation on compressor inlet components, especially inlet guide vane, can cause performance degradation and mechanical damages. In general, the compressor bleeding anti-icing system that supplies hot air extracted from the compressor discharge to the engine intake has been used. However, this scheme causes considerable performance drop of gas turbines. A new method is proposed in this study for the anti-icing in combined cycle power plants(CCPP). It is a heat exchange heating method, which utilizes heat sources from the heat recovery steam generator(HRSG). We selected several options for the heat sources such as steam, hot water and exhaust gas. Performance reductions of the CCPP by the various options as well as the usual compressor bleeding method were comparatively analyzed. The results show that the heat exchange heating system would cause a lower performance decrease than the compressor bleeding anti-icing system. Especially, the option of using low pressure hot water is expected to provide the lowest performance reduction.

Effect of corrosive water quality control and corrosion index monitoring in pilot scale pipeline simulator (파일럿 규모 모의관로에서 부식성 수질제어 효과와 부식지수 모니터링)

  • Kim, Do-Hwan;Kim, Yung-Jin;Son, Hee-Jong;Ryou, Dong-Choon;Ahn, Jun-Young;Kim, Cheolyong;Hwang, In-Seong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.2
    • /
    • pp.183-192
    • /
    • 2018
  • Applicability of corrosion inhibitor was evaluated using pilot scale water distribution pipe simulator. Calcium hydroxide was used as corrosion inhibitor and the corrosion indices of the water were investigated. Corrosion indices, Langelier saturation index (LI) increased by 0.8 and calcium carbonate precipitation potential (CCPP) increased by 9.8 mg/L. This indicated that corrosivity of water decreased by corrosion inhibitor and the effects lasted for 18 days. Optimum calcium hydroxide dose was found to be 3~5 mg/L for corrosion inhibition. We suggest that monitoring of CCPP as well as LI need to be conducted to control corrosivity of water.

Pressuremeter Test in YULCHON Combined Cycle Power Plant (율촌 복합화력발전소 공내 재하 시험)

  • Lee, Yong-Gil;Park, Kyung-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.2 no.1
    • /
    • pp.5-13
    • /
    • 2001
  • The purpose of this paper is to present the pressuremeter test result and analysis for Yulchon Combined Cycle Power Plant(CCPP) site. The CCPP site is old backfill area with the hillcut materials obtained from the borrow sources near the mountains. The geology of this area consists of 6-layers from the ground level such as hillcut material, dredged clay fill, silty sand, original marine clay, weathered rock, soft rock, etc.. The pressuremeter test has been carried out with three different probe, in size and membrane type for all layers except the clay layers. The cone penetration test has been also carried out to collaborate with the pressuremeter test in the hillcut material layer.

  • PDF

Complete Coverage Path Planning for Cleaning robot (청소로봇의 전역 경로계획)

  • Nam, Sang-Hyun;Moon, Seung-Bin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2002.11c
    • /
    • pp.2431-2434
    • /
    • 2002
  • 본 논문에서는 전체 영역 경로 계획인 CCPP(Complete Coverage Path Planning)를 이용해 전 청소 영역을 청소하는 방법을 나타내고 청소영역을 해석 하였다. 그리고, Template방법에 CD(Cell Decomposition)을 접목시킨 방법을 이용해 청소영역을 청소 후 재 경로계획으로 청소 안된 영역을 효율적으로 청소하는 방법을 연구하였다. 또한 청소기의 회전 및 직선 모션에 따른 청소 영역을 비교 해석해 최적 시간과 거리에 따른 경로 계획을 살펴보았다.

  • PDF

Development of Corrosion Evaluation Index Calculation Program of Raw Water and Evaluation on Corrosivity of Tap Water using the Calcium Carbonate Saturation Index (상수원수의 부식평가 지수 산정 프로그램 개발 및 탄산칼슘 포화지수에 의한 수돗물의 부식성 평가)

  • Hwang, Byung-Gi;Woo, Dal-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.1
    • /
    • pp.177-185
    • /
    • 2009
  • In this study, we developed the program to calculate the corrosion evaluation index for examining the corrosivity of raw water. When it was applied to the Han river and Nakdong river system, sulfuric acid ion, which accelerated corrosion, was higher in Nakdong river system than Han river system while calcium and hardness, which restrained corrosion, was the same way. Summarization of the LI and CCPP calculation result by the developed corrosion evaluation model showed that water quality of Han river system had strong tendency to corrode (is strongly corrosive). Moreover, this study evaluated the corrosivity of calcium carbonate saturation index by adding the chemicals to tap water. Saturation status was maintained in the order of $Ca(OH)_2$ > NaOH > ${Na_2}{CO_3}$ > $CaCO_3$ in the case of LI and RI.

Environmental Noise Prediction for Large Power Plant and Desalination Plant (대형 발전/담수 플랜트의 환경소음 해석 및 평가)

  • Song, Keun-Bok;Kim, Dong-Hae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.345-349
    • /
    • 2008
  • In this paper, environmental noise analysis was performed for large power plant and desalination plant. Ray tracing method was used to predict inside noise of turbine building. It is important to design the plant with the allowable noise level. To improve the accuracy, main noise sources were estimated based on the field data. As the results of analysis, it was concluded that noise levels slightly exceed the specified noise limit in turbine building inside. In order to reduce the noise level, adding sound-absorbing materials to inside wall of turbine building was suggested and verified with the confirmed analysis model.

  • PDF

Single-ended Differential RF Circuit Topologies Utilizing Complementary MOS Devices

  • Kim, Bonkee;Ilku Nam;Lee, Kwyro
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.2 no.1
    • /
    • pp.7-18
    • /
    • 2002
  • Single-ended differential RF circuit topologies fully utilizing complementary characteristics of both NMOS and PMOS are proposed, which have inherent advantage of both single-ended and differential circuits. Using this concept, we propose a CCPP (Complementary CMOS parallel push-pull) amplifier which has single-ended input/output with differential amplifying characteristics, leading to more than 30 dB improvement on $IIP_2$. In addition, complementary resistive mixer is also proposed, which provides not only differential IF outputs from single-ended RF input, but much better linearity as well as isolation characteristics. Experimental results using $0.35{\;}\mu\textrm{m}$ CMOS process show that, compared with conventional NMOS resistive mixer, the proposed mixer shows 15 dB better LO-to-IF isolation, 4.6 dB better $IIP_2$, and 4.5 dB better $IIP_3$performances.

Plant Minimum Stable Load (Pmin) Test for Ilijan CCPP

  • Kim, Si Moon;Yun, Wan No;Jang, Cheol Ho;Park, Se Ik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.83-88
    • /
    • 2016
  • This paper describes the test results of plant minimum stable load (Pmin) for Ilijan Power Plant. The test was conducted on May 13 through 14, 2015 to investigate the plant operating and equipment condition in accordance with "Ilijan Plant Performance Test Procedure on Plant Minimum Stable Load" [1]. This paper also contains the assessment of the impact of Pmin to plant operating parameters and possible technical operating issues when operating at lower loads and to recommend the safe minimum load operation of Ilijan per block. In addition, this paper describes the performance calculation results of efficiency and heat rate depending on the load level.

Characteristics of Thermal and Fluid Flows for Different Fire Locations in Underground Combined Cycle Power Plant (화원 위치에 따른 지하 복합 발전 플랜트 내 열유동 특성 연구)

  • Sung, Kun Hyuk;Bang, Joo Won;Lee, Soyeong;Ryou, Hong Sun;Lee, Seong Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.5
    • /
    • pp.716-722
    • /
    • 2017
  • The present study numerically investigates the effect of obstacles located in the trajectory of fire plume flow on heat flow characteristics by using Fire Dynamics Simulation (FDS) software in an underground combined cycle power plant (CCPP). Fire size is taken as 10 MW and two different locations of fire source are selected depending on the presence of an obstacle. As the results, when the obstacle is in the trajectory of fire plume, hot plume arrives at the ceiling about 5 times slower in the upper of the fire in comparison to the results without obstacle. In addition, the average propagation time of ceiling jet increases by about 70 % with the distance from the ceiling in the upper of the fire, and it increases mainly about 4 times at the distance of 10 m. Consequently, it is noted that the analysis of heat flow characteristics in the underground CCPP considering fire scenarios is essential to develop the fire detection system for initial response on evacuation and disaster management.