Advanced CBS (Cost Breakdown Structure) Code Search Technology Applying NLP (Natural Language Processing) of Artificial Intelligence (인공지능 자연어 처리 기법을 이용한 개선된 내역코드 탐색방법)

  • Kim, HanDo;Nam, JeongYong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.5
    • /
    • pp.719-731
    • /
    • 2024
  • For efficient construction management, linking BIM with schedule and cost is essential, but there are limits to the application of 5D BIM due to the difficulty in disassembling thousands of WBS and CBS. To solve this problem, a standardized WBS-CBS set is configured in advance, and when a new construction project occurs, the CBS in the BOQ is automatically linked to the WBS when a text most similar to it is found among the standard CBS (Public Procurement Service standard construction code) of the already linked set. A method was used to compare the text similarity of CBS more efficiently using artificial intelligence natural language processing techniques. Firstly, we created a civil term dictionary (CTD) that organized the words used in civil projects and assigned numerical values, tokenized the text of all CBS into words defined in the dictionary, converted them into TF-IDF vectors, and determined them by cosine similarity. Additionally, the search success rate increased to nearly 70 % by considering CBS' hierarchical structure and changing keywords. The threshold value for judging similarity was 0.62 (1: perfect match, 0: no match).

EVMS Database System Implementation for interworking of WBS & CBS based management in Construction Works (건설공사의 활동·내역 연동관리를 위한 기성관리운영시스템(EVMS) 데이터 모델링 및 구현)

  • Park, Hong-Tae;Lee, Bu-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2851-2858
    • /
    • 2011
  • The schedule management in construction project have been performed independently by two method, WBS base management and CBS based management, However, the integrated management model is needed according to efficiency of construction project management and introduction of new EVMS system of KOREA government. For this purpose, interworking database system is designed through efficient modeling of WBS based management data and CBS based management data and relation establishment between entities in this paper. WBS based management DB consists of 4 entities and CBS based management DB consists of 3 entity and one of the 4 WBS DB entities is used to play interworking role between WBS and CBS, Also, attributes of all entities are well defined so that data consistency, integrity and newest are guaranteed. The designed interworking database model was realized using Nex-Pert Pro and the efficiency of data interworking was proved.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

An Aplication Model to Ensure Practical Usage in Construction Management (공사관리의 실용성 확보 전략과 적용 모델의 개발)

  • Chang Young-Bae;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-404
    • /
    • 2002
  • To manage a construction project efficiently, it is essential to ensure the practical usage in construction management. The purpose of this study is to develop a practical model, which will increase the efficiency of management. The followings are the method of this study: (1) Establishing a breakdown structure based on integration of CBS and WBS which is well acquainted (2) Developing and systemizing managerial standards and processes on such activities as calculating and marking progress rates & schedule, summarizing cost by activities level, making out project analysis reports. This study shall contribute to raising the efficiency in construction management after being verified in a pilot project and being developed into construction management system.

  • PDF

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.