Journal of Korean Institute of Industrial Engineers
/
v.32
no.4
/
pp.314-322
/
2006
Despite its brilliant success, Six Sigma has suffered from two shortcomings, namely, the lack of a systematic method to identify the right projects in the "Define" stage and to sustain the improvement in the "Control" stage. The integration of Six Sigma and Business Process Management(BPM) seems to be a promising way to overcome the shortcomings of Six Sigma. This paper first reviews the existing efforts on this issue, and then proposes a framework for an effective integration of Six Sigma and BPM. The framework consists of five phases - DEFINE, EXECUTE, MONITOR, ANALYZE, and IMPROVE(DEMAI). A detailed description on the procedural model is also presented.
The demands for continuous process optimization require a radical rethinking of how information systems are designed and constructed. Information systems must be capable of sustained, graceful change in response to evolving business requirements. This proposition is supported by the fact that information systems have helped increase productivity only when they were built to support new and better ways of conducting the business. In such context, business process engineering (BPF) is recognized the first but most critical stage in developing information systems as well as in launching business improvement and innovation projects. However, more often, there exist great gaps and inconsistencies between the results of BPE and the business itself, which turn into huge maintenance overhead during an information system lifecycle. In order to solve such an ever lasting problem, this paper orthogonal models, procedure, guide, and work flow are constructed in our engineering discussions focus on decentralized organizations, the method is general enough to be applied easily to other types of organizations without difficulties.
Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
International conference on construction engineering and project management
/
2005.10a
/
pp.1150-1153
/
2005
The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.
Information strategy planning (ISP) pursues alignment of business strategy and IT (Information Technology) strategy as well as derivation of feasible and valuable IT projects. However, conventional ISP methodology hardly obtains the objectives because of its intrinsic shortcomings. Diverse ways are proposed for the improvement of the conventional methodology including, for example, combination of EA (Enterprise Architecture) with ISP. Meanwhile, six-sigma methodology which is characterized by quantification, scientific and systematic approach, customer orientation, process orientation has been gaining considerable attention and extending its application scope continuously. In this paper, an innovative ISP methodology is proposed by decomposing activities, methods, and tasks from conventional ISP process and reorganizing them into DMADOV six-sigma framework. In addition, the usefulness and applicability of the newly proposed methodology are provided using an electronics company example. The methodology enhance the possibility of producing future oriented and beneficial IT projects by associating IT strategy and the projects in the form of quantified causal relationship. Besides, it can also increase the objectivity of IT vision and strategy.
Journal of Fisheries and Marine Sciences Education
/
v.28
no.4
/
pp.913-924
/
2016
Re-consultation on Marine Environment Impact Assessment (MEIA) says that business operators are then licensed back from the disposition authorities undergoing a consultation process to change business plans. Marine Environment Management Act has provisions(Article 94) with respect to a case where the scale of business, the period of business, reflects the basic plan, including a plan to change a variety of reasons. But increasingly diverse types of businesses and projects which are the subject of MEIA, As it appears that the vulnerability issues and the problem of the re-consultation. In this study conducted an analysis of the literature review and comment on the re-consultation report four years. In addition, it presents a check to the problem through concrete examples related to the re-consultation and proposes improvement measures.
Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.
Korean Journal of Construction Engineering and Management
/
v.11
no.1
/
pp.16-28
/
2010
Construction companies are fulfilled in according to project, and it is difficult to execute the standardized process in various construction projects. Thus many construction companies is adopting BPM(Business Process Management) that meet business process change and business improvement. However, it is difficult to apply BPM in a lump because of difference of BPM characteristics and company's strategies. For this reason, it is desirable to select business process based on company's priority. This study indicated need of method for selecting business process through studying current researches, and made BPA for construction company by analyzing business process in construction company. Moreover, this study indicated core business process from a point of profitability and growth view through grasping strategic goal priority. And also, it proposed criteria for process evaluation for BPM adoption, evaluated core business process, and indicated prior business process for BPM adoption.
Journal of information and communication convergence engineering
/
v.6
no.3
/
pp.323-326
/
2008
Data Envelopment Analysis (DEA) is a theoretically sound framework for performance analysis that offers many advantages over traditional methods such as performance ratios and regression analysis. Largely the result of multidisciplinary research during the last three decades in economics, engineering and management, DEA is best described as an effective new way of visualizing and analyzing performance data. Besides, overseas information technology companies have aggressively tried to enter the domestic market. In the age of globalization and high competition, it is imperative that the system integration (SI) companies need to introduce the performance evaluation models of SI projects, including Capability Maturity Model and Software Process Improvement and Capability Determination, to gain a competitive advantage. Therefore, it makes our research regarding evaluation of SI projects very opportune. The purpose of the study is not only to evaluate efficiency of each project by DEA but also to gain insight into various factors such as project complexity, team members' man-months structure, and process index(project management index) that link to the projects performance.
Journal of the Korea Institute of Building Construction
/
v.10
no.3
/
pp.39-47
/
2010
The government has routinely made efforts to improve the living environment and infrastructure of less-developed areas through large area urban remodeling projects, which are in themselves attempts to overcome the disadvantages of piecemeal local area development. Such projects are very complex, and various stakeholders are involved. However, the data on such projects has not been well managed, and has not lent itself to being easily adopted to similar projects. In addition, there are numerous fragmented mega-projects that seem to be performed based on "rules of thumb" To address this issue, the work process of many urban and residence project types should be standardized otherwise the participants will be confused to work properly. In particular, typical residents who lack knowledge about building redevelopment, building remodeling, urban environment improvement projects, and the like think that it is difficult to establish the preparation committees and association committees for the projects. Therefore, we examined previous researches related to the urban and building renovation to solve the prescribed present problems. This paper presents the three necessary research performances: first, we analyzed the administrative work process in the related laws; second, we examined the practical work process of the preparation committee and association committee stages; and finally we deduced the problem and presented the required improvements.
Climate technology applied to address climate change requires a comprehensive review such as environmental and social acceptability in addition to economic feasibility. Not only mitigation and adaptation technologies, but also integration of climate technologies into a business model with other relevant technologies including ICT, finance, and policy instruments could enhance technical, economic, and environmental performances to respond to climate changes. However, many climate projects (and business models) are currently not designed to consider adequately complex climate?related issues. In addition, there is a lack of research on assessment systems that can comprehensively evaluate business feasibility of such models. In this study, we developed a system consisting of nine major indicators in four fields to assess climate technology-based business models. Each indicator was weighed using the analytic hierarchy process (AHP) for systematic assessment of business models. The process can be utilized as a tool to guide improvement of climate technology business models.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.