• Title/Summary/Keyword: Bulldozer

Search Result 20, Processing Time 0.026 seconds

GREENHOUSE GAS EMISSIONS FROM ONSITE EQUIPMENT USAGE IN ROAD CONSTRUCTION

  • Byungil Kim;Hyounkyu Lee;Hyoungbae Park;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.286-291
    • /
    • 2011
  • Onsite usage of construction equipment accounts for a 6.8% of air pollution in Korea. The high concentration of carbon dioxide in such emissions impact not only climate change, but also people's health. However, greenhouse gas emissions from onsite equipment usage have not yet been fully investigated. This study presents a comparative analysis on how much greenhouse gas is generated by various equipment types used in different construction activities. Two ongoing cases which involve a typical road construction project in Korea were selected for the comparison purpose. Greenhouse gas emissions from each onsite equipment usage of the different activities were estimated on the ground of design documents. The estimates were compared and analyzed to derive the main sources of greenhouse gas emissions. The result showed that earthwork constituted the largest part-more than 90%-among work types. Dump truck, bulldozer, and loader were major sources for such emissions. The study results are expected to be used as a basis for reduction of greenhouse gas emission from onsite equipment usage.

  • PDF

A Study on Calculation of Air Pollutants Emission Factors for Construction Equipment (건설기게의 대기오염물질 배출계수 산정을 위한 연구)

  • lim, Jae-Hyun;Jung, Sung-Woon;Lee, Tae-Woo;Kim, Jong-Choon;Seo, Chung-Youl;Ryu, Jung-Ho;Hwang, Jin-Woo;Kim, Sun-Moon;Eom, Dong-Sup
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.25 no.3
    • /
    • pp.188-195
    • /
    • 2009
  • Generally. mobile sources of air pollution were classified in on-road and non-road. Due to increased registration number of construction equipment in Korea. updated emission factors for non-road mobile sources, such as construction machinery. should be developed. NONROAD model of U.S. EPA already has introduced transient adjustment factors and sulfur adjustment factors for emission factors of diesel powered engine. In addition to this. European Environment Agency (EEA) has proposed emission factors for off-road machinery including several types of construction equipment. In this study. six types of construction equipment, such as excavator. forklift, loader, crane, roller and bulldozer, were studied to estimate emission factors based on total registration status in Korea. Total 445 construction equipments between 2004 and 2007 model year were tested with KC1-8 mode and air pollutants (CO, THC, $NO_x$, and PM) were measured. After statistical estimation and calculation, emission factors for CO, THC, $NO_x$, and PM for excavator, forklift, loader, crane, roller and bulldozer were provided and compared with previous emission factors. Moreover, updated emission factors for six types of construction equipment in this study were verified after comparison with emission factors of U.S. EPA. Finally, estimated emission amounts of four air pollutants were suggested according to six types of construction equipment.

Analysis on Change of Construction Type for the Non-national Forest Road in Jeollabuk-do (전라북도 민유임도의 시기별 공종변화에 관한 연구)

  • Son, Jae-Ho;Park, Chong-Min;Lee, Joon-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.6
    • /
    • pp.652-660
    • /
    • 2007
  • The study was intended to investigate the changes of construction types of 216 non-national forest roads, which were completed between 1989 and 2005 in Jeollabuk-do, by analyzing their drawing and specification. It was found that the mean length of yearly construction has been significantly reduced after the Policy of Green Forest Roads compared with before the policy. Soil cut-off of earth work was changed from bulldozer to a combination of bulldozer and excavator. Soils were transported by truck in all design, but establishment of spoil-bank was not designed at all. The design of slope revegetation works was developed from turfing and Bastard indigo planting to seed spray, combination of seed spray and belt-sodding, and mulching with coir net and rice straw. In design of the culvert, the average interval of culvert installation was reduced to 92m in step 3, the dimension of culverts was expanded to over 600 mm after step 2, and all drainpipes were corrugated steel pipes. The design length of concrete pavement increased from 40 m/km of step 1 to 240 m/km of step 3. Thanks to the enormously increased amount of concrete pavement, the stability and functionality of forest roads could be improved. Stone masonry was the main work drawn for slope stability, and concrete retaining wall and gabion have been drawn for same object since 1999.

Resear cher & Coordinator, Canal Reseach & Development, japan (농업수리시설과 소수로굴착용 Trencher V형의 개발에 대하여)

  • 영목청
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.21 no.2
    • /
    • pp.28-36
    • /
    • 1979
  • One of most important problems in the Monsoon Asia today is the production of rice paddy to meet the needs of the ever increasing population. Diversemeans are being employed to meet this demand, both by increasing productivity of existing farm land and by bringing further areas into cultivation. The primary step in either field is to ensure that there is sufficient moisture in the soil to suit the paddy, and at the same this means that excess moisture has to be drained off the land, while in others irrigat ion has to be employed to bring sufficient water to an area. In view of the fact that the project comprises a huge amount of earthwork, it can be carried out by extensive use of construction machinery in order to shorten the period. As farm ditch has a comparatively small section with shallow cutting depth, inaddition, there is lack of access road in the field, the excavation equipment with bulldozer or tracter-shovel (backhoe) type are not applicable because there are mostly adapted for the excavation of deep and wide section. Mini-backhoe with its bucket width not larger than 0. 3m, and width of blade not larger than 1. 00m seems to be more adaptable. About 80% of excavation of ditch section will be done by the machinery while the other 20% of excavation together with the finishing of the section are supposed to be done by man-power. The embankment of ditch section can be compacted by the crawler of backhoe when it is moving along the ditch for excavation. However, Lowland paddy field in the Monsoon Asia are made particulary in rain season, therefore, heavy machinery is not easy excavation for ditch. It is very important to know exact ground support power of the working site and select machines with corresponding ground pressure. Ground support power is variable subject to quality and water content of soil and therefore selection of machines should be made duly considering ground condition of the site at the time of construction works. Farm ditches dug and compacted by mannual labar are of poor quality and subject to destruction after one or two years of operation. On the other hand, excavation and compaction by bulldozer is not practical for ditches. Backboe is suitable for slope land, but this is required cycle time of bucket excavation and dumped out. If a small-scale farm ditch trencher adaptable to lowland paddy field is invented, such a machine could greatly accelerate the massive construction work envisaged in many countries and thus significantly speed up the most difficult part of irrigation development and management in Monsoon Asia.

  • PDF

A Study on the Embodiment of a Transfer Case with High-Speed Reduction of the Planetary Gear Type Applied to Big Industrial Vehicles (대형 산업 차량에 적용되는 유성기어형 고감속 중간변속기 구현에 관한 연구)

  • Lee, Won-Kyu;Park, Se-Myoung
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.14 no.6
    • /
    • pp.14-20
    • /
    • 2015
  • A high-speed reduction transfer case is usually employed by an excavator, wheel loader, or bulldozer. When powerful torque is required in the case of climbing steep roads or towing heavy equipment, the high-speed reduction mode of the gearbox is used. Generally, a transfer case using a spur gear type with a speed reduction system has a speed reduction ratio of 1 to 1 or 2 to 1. However, the structure of a transfer case achieved at a high speed of 1 to 1 and a low speed of 4.5 or under 5.5 to 1 with the speed reduction by use of a planetary gear type with a speed reduction system was proposed in this study. By employing a planetary gear type with a speed reduction system, the compact structure of the transfer case was achieved, and the impact or the partial defect of gear teeth was eliminated.

Health Hazardous Substances in Construction Work in Korea (건설업 근로자의 유해 작업 환경 노출 실태에 관한 연구)

  • Choi, Jae-Wook;Mun, Jung-Soo;Kim, Jeong-Ah;Won, Jeong-Il;Park, Hee-Chan
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.10 no.1
    • /
    • pp.74-92
    • /
    • 2000
  • This study was performed to evaluate the working conditions In construction workers through measurements of working environments and to improve the working conditions and to design the appropriate environmental and health management system. The results of measurement for working environments in construction work are as following: 1. The excess rate of noise and dust concentration in express highway construction, road construction, building construction and interior painting was 28.6% and 24.5% respectively. 2. The excess rate of mixed organic solvents concentration in interior painting was 39.3%. 3. The chain type bulldozer has the highest level of vibration; the excess rate was 85.7%, and among the vibration instruments, the level of left hand's vibration of all vibrators exceeded the criterion and in the case of drilling all the level of vibration exceeded the criterion in both hands. On the basis of the results in this research the environmental and health management system for construction workers must be considered. Therefore, it is necessary to be introduced the special medical examination and measurement of working environments in construction industry. In defining "the working place" of Article 39 of Enforcement regulations of industrial safety and health act, the word "indoors" should be deleted. Then the eligible industry for measurement of working environment must be extended. And it is also necessary for construction industry to be performed group health management service by agencies such as other manufacturing industry.

  • PDF

The Investigation Study of Compaction Density by Waste Composition Change in Landfill Site (매립장의 반입쓰레기 성상변화에 따른 다짐밀도 조사연구)

  • Jung, Byung-Gil;Choi, Young-Ik;Kim, Jung-Kwon
    • Journal of Environmental Science International
    • /
    • v.17 no.4
    • /
    • pp.397-403
    • /
    • 2008
  • The purpose of this study is to investigate weighted compaction density according to a leading density in truck, a compaction density of solid waste and composition ratios of solid waste fur calculation of a capacity of the landfill sites. The experiments for calculations of in-place density at landfill site have been conducted in S landfill site at B City. The size of vessel for measuring the compaction density was $1m^3(1m{\times}1m{\times}1m)$. The experiment tests have been carried out methods (1 time for bulldozer and 4 times for compactor) that do contain all of specification at the landfill site. Average of the loading density at the landfill site was $0.264\;ton/m^3$ ($0.113{\sim}0.487\;ton/m^3$). When the loading density for each compositions was compared, the composition of the highest average loading density ($0.474\;ton/m^3$) was miscellaneous wastes. The composition of the lowest average loading density ($0.120 ton/m^3$) was general solid waste. The reported results indicated that the compaction density at the landfill site was $0.538\;ton/m^3$, which was calculated with weighted incoming ratios of compositions. The ranges of the density for each composition were from $0.021\;ton/m^3$ to $0.221\;ton/m^3$. When the compaction density for each composition was compared, the composition with the highest average compaction density ($0.221\;ton/m^3$) was miscellaneous wastes. The composition with the lowest average compaction density ($0.021\;ton/m^3$) was general solid wastes.

Impact toughness improvement of an undercarriage track shoe using the Taguchi orthogonal array experiment (다구찌 직교배열 실험을 이용한 무한궤도용 트랙 슈의 충격인성 향상 연구)

  • Kim, Young Suk;Chang, Keun Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.1611-1619
    • /
    • 2015
  • This study examined the toughness improvement of a track shoe used as the undercarriage of excavator and bulldozer parts. The excavator is operated under poor conditions, such as the build-up field and quarry. Therefore, the track shoe requires high strength and impact toughness to endure immense shock while at work. The track shoe was made of heat treated boron steel. The sufficient possibility of hardenability with the theoretical Jominy curve for boron steel was confirmed while quenching. The Taguchi orthogonal array experiment method was used to optimize the process variables, such as area reduction ratio and heat treatment conditions (tempering temperature and holding time), to achieve toughness improvement. The toughness of the track shoe increased with increasing area reduction, and a tempering temperature of $210^{\circ}C$ and a tempering time of 80 min are beneficial for improving the toughness of the track shoe.

A Study on New Working System of Machanical Land Clearing and Development of Rertile Soil (기계 개간의 새로운 작업 체계와 숙지화 촉진에 관한 연구)

  • Hwang, Eun
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.1
    • /
    • pp.2535-2548
    • /
    • 1972
  • Instead of fertilizing the lands they moved to find other fertile lands and lived a feudal life agriculture and various machincs played a main role in the land reclamation. The best method of land clearing, the time and capacity in the operation and the effect of growing crops should systematically analized prior to the time of 3rd Five-year Economic Development(1972-1976) in order to cultivate 210,000ha of wasteland or the modernization of our country. The present study was investigated to find out a new working-system of mechanical land clearing and development of fertile soil. The results are as follows: 1) The first stage of productive power increases when weeds were mixed soil in the land clearing work in order to supply organic materials and to make soil swollen instead of burning or just removing. 2) The equipments such as bulldozers, harrows, power tillers and so on should be prepared in order to do a systematic work in the land clearing. 3) The work of pulling-up roots is dependent upon the forms of roots spreading under the ground. The work of the pulling-up of the straight roots was most difficult. But before the roots are pulling-up we do not know the forms of roots. 4) The cutting of soil from upside to under side land clearing method (II) Spent 6 hr 7 min 43 sec per 1 Danbo in doing land clearing and control method spent 4 hr 52 min 30 sec per 1 Danbo in doing land cearing. No significant difference could be found between II treatment type and I treatment type. 5) The volume of soil carried by bulldozer $270.38m^3$ per 1 Danbo in I type and in II type, $368.58m^3$ per 1 Danbo or about 36% increased in II type then in I type. But that is not a significant difference when considering the whole productive power of soil. 6) The land clearing of terrace by bulldozers cannot escape making the embankment slope of about $45^{\circ}$, and 25.3% should be decreased in the area. It is recommended to make use of the embankment slope by planting grass for cows. 7) The time of retary tilling increased 2.3 times or 1 hr 42 min 22 sec per 1 Danbo compared to the timesrequired in the harrowing. Because it mixed the Organic matter on ground and the harrowing of subsoil. 8) The havest of pasture growing on the land reclamation in natural slope is as follows. (a) The none fertilizers with reclaimed block of productivity decresed 1/10 than that of the farmland. Therefore the none fer tilizing in the cultivated pasture is unprofitable. (b) The havest of the manured IV treatment block was the best not only in the kinds of fertilizers but also in the kinds of pasture grass.

  • PDF

Research on Mechanized Upland Reclamation Works An Experiment for the Selection of Optimum Teeth Interval and the Analysis of Efficiency of Stumping and Root-Clearing Methods by Rake Dozer. (Report 1) (야산 기계화 개간공법에 관한 연구 -레이크 도저의 적정 이빨 간격의 선택과 발배근작업능률 시험(제1보)-)

  • 류한열;정하우박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.17 no.3
    • /
    • pp.3860-3871
    • /
    • 1975
  • This experiment was carried out to establish the mechanized methods in stumping and root-clearing, which were the most important works in the reclamation of sloping uplands. The determination of optimum teeth interval of rake blades and its operation methods to reduce the quantity of transported topsoil during the works, are the aims of this investigation. A newly designed rake blade, whose net teeth intervals could be regulated by three stages as 15cm, 25cm, and 35cm, was manufactured to attach to the bulldozer of 13ton. The experiments were carried out at Kilsang-Myon, Kwangwha-Gun, from Aug. 9 to Aug. 23, 1975. For each interval, 36 test plots of 50${\times}$10mn in size, which were regulated under three levels of land slopes of 10, 20, and 30% and two different tree stand density of high or medium values, were randomly chosen and arranged by two-replicated split-split plot design. Each stump classified by its diameter was stumped and cleared by the rake dozer to be related between diameter and stumping time. The results obtained in this experiment can be summarized as follows: 1. Stumping times for the diameters ranging from 6 to 18cm of stumps are almost the same and they are not varied by the difference of teeth intervals of rake dozer. 2. By back-ward stumping method, the number of stumps which can be stumped per hour ranges almost from 100 to 170, showing significant difference with respect to the teeth intervals. The working area is sharply varied with not only the stand density of stumps but the teeth intervals. 3. Optimum stumping distance for each teeth interval of rake dozer to minimize the quantity of transported topsoil are varied with such the rates as it is 15m or 20m for 15cm of teeth interval, but 25m for 25cm or 35cm, respectively. The clearing distance could be chosen almost double as long as the operating distance. 4. The working areas per hour of the simultaneous stumping and clearing methods are no significant difference among the various treatments of working conditions, but they are affected by the operating techniques. However, the influencing factors of the working conditions as classified before and the working directions are ranged from 10 to 15 per cent of total working area, respectively. 5. The residual rates of stumps which are not stumped by the rake dozer in each test plot are generally reduced as the teeth interval gets narrower, but there are no significant difference among them. The mean residual rates average to be about 4% for the simultaneous stumping and clearing method. The back-ward stumping method are recommended to be supervised and directed by more than one man, to show the operator where the stumps are located. 6. The results according to the stumping and clearing methods are summarized as Table IV-2. And the selection of working methods is recommended to follow as shown in Fig. IV-9 with respect to the stand density of the field. 7. Generally speaking, the narrower the teeth interval, the better become the working results, but the more the quantity of transported topsoil is increased. Therefore, it is recommended that the teeth interval should be reduced from the present distance of more than 30cm to 25cm or 15cm, by developing suitable working methods through more field works and experiments.

  • PDF