• Title/Summary/Keyword: Building structure

Search Result 4,844, Processing Time 0.031 seconds

A Study on Early Strength Estimation of Precast Concrete joint Mortar with Microwave (마이크로파에 의한 PC접합모르타르의 조기강도추정에 관한 연구)

  • 원준연;박일용;백민수;이종균;안형준;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.217-222
    • /
    • 2000
  • A large Pc structure building is system that consisted of bearing wall and slab joint. It has general structure stability from unity thar each members tied at joint. The strength of mortar that packing in joint among panels is important to internal force in entire building system. Do, if we could get early strength estimation with microwave. It would bring good construction planning, reduce construction time, and judge building stability and so on. The purpose of this study is to develop early estimation method for making better quality control and constructing good PC panel structure. The results of this study were as follows :1) With sealed molds, reduced moisture volatilization to more than 60% and enlarged 30% accelerated compressive strength than before one. 2) To get more accelerated strength, we should control maximum temperature difference to $30^{\circ}C$ downward 3)Interrelation with 7-day and 28-day strength were 0.831,0.902, and it is above than before one

  • PDF

A Study on Generation Algorithm of Optimal Support Structure for Effective Building of Stereolithographic Parts (광조형물의 효율적 성형을 위한 최적 지지대 구조 생성 알고리즘에 관한 연구)

  • 김호찬;최흥태;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.11a
    • /
    • pp.572-577
    • /
    • 1996
  • Stereolithography is a process used to rapidly produce stereolithographic parts directly from three dimensional CAD models. However, design methodologies necessary to create components to be built by stereolithography are different from those required by conventional machining processes. A case in point is the nescessity of support structures, which are used to support a component during the building the build but are removed once building and curing are complete. Support structures are required to anchor the component to the platform and to prevent sagging or disortion. This paper deals with the specially maintained SupportMap data structure to find some region which need support structures. Interferences between support structures and parts, as well as among support structures are checked and statically stable regions are searched to remove the surplus support structures. Cross shaped tooth profiles are designed for easy eliminating the support structures.

  • PDF

Vibration Control of Real-Size Steel Structure by Hybrid Linear Motor Damper (혼합형 리니어 모터 댐퍼를 이용한 실규모 철골 구조물의 진동제어)

  • 정정교;김두훈;박해동;박진일;정태영;문석준;임채욱
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.740-745
    • /
    • 2002
  • To control vibration of real-size steel structure, a hybrid-type linear motor damper was designed and applied to 30m steel structure at UNISON. The LMD was tuned to the first mode natural frequency of the building. In order to use for simulation data and control parameters, dynamic response characteristics of building and damper were tested. The response of building was reduced by 10 dB with LMD and H$\infty$ algorithm. This value was similar to the result of simulation.

  • PDF

Deterioration Properties for the Concrete Decks of Bridge Structure Effected Simultaneously on the Chlorides of De-icing Salts and Freeze-Thaw (제설제의 염화물과 동결융해의 영향을 동시에 받는 교량구조물 콘크리트 바닥판의 열화특성)

  • Shin, Seung-Moon;Park, Ju-Kyung;Sun, Yun-Suk;Choi, Sung-Min;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.137-139
    • /
    • 2007
  • Recently, the research on durability of concrete proceed rapidly in the building industry. Deterioration due to do-icing salts occurs in practice in bridge structure, dike, barrier and similar structure. This paper reports the results of effect of chlorides on the freeze-thaw properties of concrete bridge deck in winter. The case fresh water condition where the concrete will receives a freez-thaw effect compared to decrease of durability quotient a lot occurs is a possibility of knowing from brine condition.

  • PDF

An Analysis of 3D Printing Activities for Vertical Structure of Small Building (소형건축물 수직골조 대상 3D 프린팅 액티비티 분석)

  • Park, Hyeong-Jin;Ju, Gi-Beom;Seo, Myeong-Bae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.308-309
    • /
    • 2018
  • Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Monitoring a steel building using GPS sensors

  • Casciati, Fabio;Fuggini, Clemente
    • Smart Structures and Systems
    • /
    • v.7 no.5
    • /
    • pp.349-363
    • /
    • 2011
  • To assess the performance of a structure requires the measurement of global and relative displacements at critical points across the structure. They should be obtained in real time and in all weather condition. A Global Navigation Satellite System (GNSS) could satisfy the last two requirements. The American Global Position System (GPS) provides long term acquisitions with sampling rates sufficient to track the displacement of long period structures. The accuracy is of the order of sub-centimetres. The steel building which hosts the authors' laboratory is the reference case-study within this paper. First a comparison of data collected by GPS sensor units with data recorded by tri-axial accelerometers is carried out when dynamic vibrations are induced in the structure by movements of the internal bridge-crane. The elaborations from the GPS position readings are then compared with the results obtained by a Finite Element (FE) numerical simulation. The purposes are: i) to realize a refinement of the structural parameters which characterize the building and ii) to outline a suitable way for processing GPS data toward structural monitoring.

Shenzhen Rural Commercial Bank Headquarters: an Iconic Tower Defined by the Integration of Architecture, Structure and Sustainability Goals

  • Besjak, Charles;Thewis, Alexandra
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.31-39
    • /
    • 2022
  • The seamless integration of the architecture and structure of a tall building plays a key role in establishing a recognizable and iconic design. The structural system developed for Shenzhen Rural Commercial Bank Headquarters (SRCBH) utilizes enhanced structural innovations unique to the tower's geometry to improve structural and sustainability performance. SRCBH utilizes a steel diagrid system pulled outside of the enclosure line with diaphragm forces resolved primarily by corner diagonal beams. During the design process the structural systems underwent performance based design and optimization for wind and seismic loading. Resiliency was prioritized for structural design as well as fire resistance. More closely integrating the structure of a building with its architecture and sustainability goals can lead to unique and innovative towers with a timeless expression.

Seismic and vibration tests for assessing the effectiveness of GFRP for retrofitting masonry structures

  • Michelis, Paul;Papadimitriou, Costas;Karaiskos, Grigoris K.;Papadioti, Dimitra-Christina;Fuggini, Clemente
    • Smart Structures and Systems
    • /
    • v.9 no.3
    • /
    • pp.207-230
    • /
    • 2012
  • Full-scale shake table seismic experiments and low-amplitude vibration tests on a masonry building are carried out to assess its seismic performance as well as study the effectiveness of a new multifunctional textile material for retrofitting masonry structures against earthquakes. The un-reinforced and the retrofitted with glass fiber reinforced polymer (GFRP) strips masonry building was subjected to a series of earthquake excitations of increasing magnitude in order to progressively induce various small, moderate and severe levels of damage to the masonry walls. The performance of the original and retrofitted building states is evaluated. Changes in the dynamic characteristics (lowest four modal frequencies and damping ratios) of the building are used to assess and quantify the damage states of the masonry walls. For this, the dynamic modal characteristics of the structure states after each earthquake event were estimated by performing low-amplitude impulse hammer and sine-sweep forced vibration tests. Comparisons between the modal results calculated using traditional accelerometers and those using Fiber Bragg Grating (FBG) sensors embedded in the reinforcing textile were carried on to investigate the reliability and accuracy of FBG sensors in tracking the dynamic behaviour of the building. The retrofitting actions restored the stiffness characteristics of the reinforced masonry structure to the levels of the original undamaged un-reinforced structure. The results show that despite a similar dynamic behavior identified, corresponding to reduction of the modal frequencies, the un-reinforced masonry building was severely damaged, while the reinforced masonry building was able to withstand, without visual damage, the induced strong seismic excitations. The applied GFRP reinforcement architecture for one storey buildings was experimentally proven reliable for the most severe earthquake accelerations. It was easily placed in a short time and it is a cost effective solution (covering only 20% of the external wall surfaces) when compared to the cost for full wall coverage by GFRPs.

Methodology of Fire Safety IFC Schema Extension through Architectural WBS Hierarchy Analysis (건축 WBS 위계 분석을 통한 소방 IFC 스키마 확장 방법론에 관한 연구)

  • Kim, Tae-Hoon;Won, Jung-Hye;Hong, Soon-Min;Choo, Seung-Yeon
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.70-79
    • /
    • 2022
  • As BIM(Building Information Modeling) technology advances in architecture around the world, projects and industries using BIM are increasing. Unlike previous developments that were limited to buildings, BIM is now spreading to other fields such as civil engineering and electricity. In architecture, BIM is used in the entire process from design to maintenance of a building, and IFC(Industry Foundation Classes), a neutral format with interoperability, is used as an open BIM format. Since firefighting requires intuitive 3D models for evacuation and fire simulations, BIM models are desirable. However, due to the BIM model, which was developed centered on building objects, there are no objects and specific properties for fire evacuation in the IFC scheme. Therefore, in this study, when adding a new object in the firefighting area to the IFC schema, the IFC interoperability is not broken and the building WBS(Work Breakdown Structure) is analyzed with a hierarchical system similar to the IFC format to define the scope for a new object and the firefighting part within of the building WBS to derive a firefighting HBS(Hierarchy Breakdown Structure) with the extension of the object-oriented IFC file. And according to HBS, we propose an IFC schema extension method. It is a methodology that allows BIM users to instantly adapt the IFC schema to their needs. Accordingly, the methodology derived from this study is expected to be expanded in various areas to minimize information loss from IFC. In the future, we will apply the IFC extension methodology to the actual development process using HBS to verify that it is actually applicable within the IFC schema.