• Title/Summary/Keyword: Building service

Search Result 1,864, Processing Time 0.024 seconds

A Study on the Development of Information Database for Building Energy Retrofit using Remote Data Service (RDS) Technology (원격 데이터서비스(RDS)를 이용한 건축설비 리모델링 핵심요소 기술의 DB 구축에 관한 연구)

  • 정광섭
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.15 no.12
    • /
    • pp.1060-1069
    • /
    • 2003
  • Our society becomes complex because technology is developing quickly. Especially, building services field deals with the important information that produces a drawing and manages the planning information and manpower. Therefore, the efficient management that connected with the construction information plays the important roles. The study develops a database by organizing systematically the various types of information using hypermedia. And, this study is to build the management system that can serve the various information that operated by DBMS on the web according to the DB structure. The information database was developed using internet web technology for building services field.

A Study on the Improvement of Architectural Administration Service Program (건축행정 서비스 개선방안 연구)

  • Hwang, Eun-Kyoung;Moon, Soo-Yong
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.99-106
    • /
    • 2005
  • According the high growth of Korean economy, there are many changes in our life recently. As life quality is improved, the standard of construction is strengthen and subdivision. However, in many steps through which it passes until a building is planned, designed, constructed and completed, there are lots of problems among the law related architecture. Especially, there are many statutes which must be checked related to building permits and much wastes time and money in review because of overlapping laws related architecture. Furthermore, there are limitation of computerization and shortage of human power of administration in architecture. In this study, we propose six improvement programme of administration service in architecture. Through these program, civil applications like housing and economic condition could be improved consistently.

Study on the Performance Analysis of Building Automation Network (빌딩 자동화 통신망의 성능해석에 관한연구)

  • 홍승호;송원석
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.52 no.6
    • /
    • pp.359-364
    • /
    • 2003
  • BACnet is a standard data communication protocol for building automation and control systems. MS/TP is most widely used LAN protocol for data communication among field devices in the BACnet-based building automation. In this study, the performance of MS/TP protocol is investigated using a simulation model. This study evaluates the delay characteristics of MS/TP being used to deliver a BACnet application service. Analysis of the simulation results was used to identify the network parameters that influence the performance of BACnet application service and to develop recommendatioins that should be considered when designing and operating BACnet systems.

A Study on Building the Digital Information Center (디지털정보센터 구축에 관한 연구)

  • Kim, Suk-Young
    • Journal of Information Management
    • /
    • v.27 no.2
    • /
    • pp.95-121
    • /
    • 1996
  • The purpose of this study is to investigate a theoretical background of digital libraries and current projects on building digital libraries. It begins by describing the shift of paradigm and the concept of digital libraries. The paper continues by summarizing the principles and technology of building digital libraries. It also includes current projects of US, UK, Japan, and National Central Library, KAIST, LG Sangnam Library in Korea.

  • PDF

The Study about a plan to develop an ITSM building framework applied ITIL Continuous Service Improvement Process (ITIL 프로세스 개선 모델을 적용한 ITSM 구축 모형 개발 방안에 관한 연구)

  • Kwon, Sang-Kook;Kim, Jeong-Jung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.134-141
    • /
    • 2006
  • Today, the role of IT is so important that it is regarded as a partner of business, not a simple supporter. The more important the role of IT becomes, the higher the level of business needs rises and the more customers want. In the market of IT, more and more enterprises are establishing ITSM processes based on the ITIL for these environments: however they are experiencing the processes of trial and errors because of the shortage of references To improve these problems, in this study, we developed the ITSM model defined by investigation of the instance to which we have applied the ITIL Continuous Service Improvement Process which contains five phases such as High level Business Objectives. Assessment. Measurable Targets, Process Improvement, Measurement and Metrics. This model is an ITSM building framework to understand the concepts over the length and breadth of ITIL and minimize the trial and errors appearing during the building of the ITSM processes, and this paper presents a plan to develop the frameworks.

  • PDF

A Study on Architectural Characteristics of Community Church in County, VA in U. S. A. (미국동부 카운티 내 지역교회에 관한 건축적 특성에 연구)

  • Chong, Geon-Chai
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.2
    • /
    • pp.79-86
    • /
    • 2011
  • The purpose of this study is to understand a architectural characteristics of local church in Virginia, U. S. This study focuses on not only analyzing the worship and service program inherent in the site planning of local church but also introducing worship service space and chancel elements of it in the village of garden area. We surveyed five protestant churches where are located in suburban and rural area outside of Midlothian city in the early August, 2010. I surveyed church building site and worship service space of churches focused on platform design, interviewed the historical background and program of churches with ministers, and corrected annual calender and newsletter. The results of this study are as follows. First, the characteristics of site plan have a comfortable parking lots and site of churchyard(cemetery) with playground that can take an activities out of chapel. The axis of church building follows to front street. Second, worship services keep two types of traditional and comtemporary worship in order to consider of both adult and youth members. The worship hall has a balance of bilateral symmetry. Third, the form of platform is built that is able to perform a music drama and movement of sermon without only one church, GraceLand Church that church building has over fifty years, and they stick to simple traditional type of Chancel that is established by pulpit, table(altar), baptistery(only baptist church), music instruments, and so on.

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

A Study on the Building of Integrated Service for Science and Technology Knowledge Infrastructure Supporting the Entire R&D Cycle (R&D 전주기 지원형 과학기술 지식인프라 통합서비스 구축에 관한 연구)

  • Lee, Seok Hyoung
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.31 no.3
    • /
    • pp.235-256
    • /
    • 2020
  • The purpose of this study is to define a method of building an integrated service to provide various science and technology knowledge infrastructures that are helpful in R&D activities, and to show the cases that are adapted the methodologies. Knowledge infrastructures scattered throughout the entire R&D cycle, such as generating/development of ideas, finding the R&D project, performing the project, and spreading results, are segmented in terms of services, functions, information, and data, and links and converges to provide the knowledge infrastructure that desired by users in one place. We define the integrated service classification, integration level model, integrated architecture, and integrated user authentication system in consideration of logical linkage and integration rather than physical integration of individual knowledge infrastructures. Also, we considered the extensibility as the reference model for building of similar integrated service.

Exploratory approach to measuring facility performance in public service facilities (공공서비스시설에서의 시설성능 요인에 대한 탐색적 연구)

  • Lee, So-Young;Shin, Hee-Young
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.284-287
    • /
    • 2009
  • In order to plan and manage public facilities effectively and efficiently, it is necessary to diagnose the current status of facilities and decide the objective features. Performance measurement is to provide managers with the information they need to measure competitive advantages. This paper discusses public facility performance in order to establish the conceptual framework for performance measurement for public facilities. In order to develop the measurement of public facility performance, a pilot study was conducted with facilities managers of facilities management corporation of public districts in Seoul. We investigated how public facilities management teams have assessed their performance and collected data regarding financial aspects, service aspects, community aspects, and building aspects. There is no standard format to measure facility performance since building sizes, programs, community needs widely differ. However, it is necessary to have a more consistent system to measure facility performance. In addition, each public municipal district needs to empower each district facilities management corporation to participate in managerial decisions and budget control.

  • PDF