• 제목/요약/키워드: Building permit

검색결과 67건 처리시간 0.024초

건축행정 서비스 개선방안 연구 (A Study on the Improvement of Architectural Administration Service Program)

  • 황은경;문수영
    • 한국주거학회논문집
    • /
    • 제16권5호
    • /
    • pp.99-106
    • /
    • 2005
  • According the high growth of Korean economy, there are many changes in our life recently. As life quality is improved, the standard of construction is strengthen and subdivision. However, in many steps through which it passes until a building is planned, designed, constructed and completed, there are lots of problems among the law related architecture. Especially, there are many statutes which must be checked related to building permits and much wastes time and money in review because of overlapping laws related architecture. Furthermore, there are limitation of computerization and shortage of human power of administration in architecture. In this study, we propose six improvement programme of administration service in architecture. Through these program, civil applications like housing and economic condition could be improved consistently.

Modeling of a Building System and its Parameter Identification

  • Park, Herie;Martaj, Nadia;Ruellan, Marie;Bennacer, Rachid;Monmasson, Eric
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권5호
    • /
    • pp.975-983
    • /
    • 2013
  • This study proposes a low order dynamic model of a building system in order to predict thermal behavior within a building and its energy consumption. The building system includes a thermally well-insulated room and an electric heater. It is modeled by a second order lumped RC thermal network based on the thermal-electrical analogy. In order to identify unknown parameters of the model, an experimental procedure is firstly detailed. Then, the different linear parametric models (ARMA, ARX, ARMAX, BJ, and OE models) are recalled. The parameters of the parametric models are obtained by the least square approach. The obtained parameters are interpreted to the parameters of the physically based model in accordance with their relationship. Afterwards, the obtained models are implemented in Matlab/Simulink(R) and are evaluated by the mean of the sum of absolute error (MAE) and the mean of the sum of square error (MSE) with the variable of indoor temperature of the room. Quantities of electrical energy and converted thermal energy are also compared. This study will permit a further study on Model Predictive Control adapting to the proposed model in order to reduce energy consumption of the building.

서울시 생산성지표의 추정 (A Study on the Estimation of Producetivity Measure of the City of Seoul)

  • 서승환;이번송;정의철
    • 지역연구
    • /
    • 제11권2호
    • /
    • pp.41-51
    • /
    • 1995
  • It has been estimated the total factor productivity(TFP)of the city of Seoul. Average TFP growth rate during 1974-1992 has been estimated as 0.0602. TFP growth rate has been decreased from 0.0804 of 1970's to 0.0561 of 1980 and 1990's Factsro affecting the TFP are found to be core infrastructure, capital stock and land price growth rate. High land price growth rate depresses the TFP growth rate. During 1989, due to the high land price growth rate and extremely low building costruction permit TFP rate has been estimated as negative.

  • PDF

건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구 (A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit)

  • 김대원;김영일;정광섭
    • 에너지공학
    • /
    • 제21권3호
    • /
    • pp.265-270
    • /
    • 2012
  • 에너지절약에 대한 규제가 심하고 국민 다수가 에너지절감에 대한 관심이 높은 상태에서 사업계획승인을 받은 건축물이 건축허가가 지연되어 주변 신규 사업건과 함께 입주된 지역에서 관리비가 20~30% 차이가 발생한다면 심각한 민원이 될 것이다. 따라서 사업계획승인 시점에 에너지절약계획서를 작성하되 주택법 시행령 제18조로 인한 공사착수가 연장이 되어 2년이 경과 되거나 지연 될 때에는 건축허가 시점에서 현 기준에 의한 에너지절약계획서를 적용하는 것이 국가 에너지계획이나 민원에 대한 미연에 방지책이 될 것이라 생각한다. 에너지절약계획서의 목적과 요소의 기술들이 그 기능을 다하지 못하고 단순히 인, 허가 수순에 지나지 않는다면 많은 인력을 투입하여 검토하고 자문하는 것이 무의미한 시간 손실일 것이다. 정부나 건축주가 에너지 save측면을 공감하고 건물에너지효율을 개선하여야 할 것이다.

The First Skyscraper Revisited

  • Ali, Mir M.;Moon, Kyoung Sun
    • 국제초고층학회논문집
    • /
    • 제11권1호
    • /
    • pp.1-14
    • /
    • 2022
  • Debates on what is the first skyscraper have been ongoing from time to time since the construction of the Home Insurance Building in Chicago in 1885, which is generally recognized as the first built skyscraper. This paper attempts to verify this assertion through a detailed investigation after identifying the criteria that characterize a skyscraper. By considering and examining several competing buildings for the title of "first skyscraper" in terms of their levels of satisfying these criteria, the paper reconfirms that the Home Insurance Building in Chicago indeed qualifies as the first skyscraper and is the harbinger of future skyscrapers. By introducing technological and associated architectural innovations in this pioneering building, its designer William Le Baron Jenney paved the way for the construction of future skyscrapers. In traditional construction, heavy masonry walls especially at lower levels did not allow large window openings in exterior walls that would permit ample daylight. For the Home Insurance Building, originally built with 10 stories, Jenney created a metal-framed skeletal structure that carried the building's loads, making the building lighter and allowed for large windows permitting ample natural light to the building's interior. The exterior iron columns were encased in relatively small masonry piers mainly for fireproofing, weather-protection and façade aesthetics. Relying on the structural framing on the building's perimeter, the exterior masonry thus turned into a rudimentary "curtain wall" system, heralding the use of curtain wall construction in future skyscrapers. This building's innovative structural system led to what is known as the "Chicago Skeleton," and eventually produced remarkable skyscrapers all over the world.

초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구 (A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings)

  • 김상환;최원철;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

Risk evaluation of steel frames with welded connections under earthquake

  • Song, Jianlin;Ellingwood, Bruce R.
    • Structural Engineering and Mechanics
    • /
    • 제11권6호
    • /
    • pp.663-672
    • /
    • 2001
  • Numerous failures in welded connections in steel moment-resisting building frames (SMRF) were observed when buildings were inspected after the 1994 Northridge Earthquake. These observations raised concerns about the effectiveness of such frames for resisting strong earthquake ground motions. The behavior of SMRFs during an earthquake must be assessed using nonlinear dynamic analysis, and such assessments must permit the deterioration in connection strength to capture the behavior of the frame. The uncertainties that underlie both structural and dynamic loading also need to be included in the analysis process. This paper describes the analysis of one of approximately 200 SMRFs that suffered damage to its welded beam-to-column connections from the Northridge Earthquake is evaluated. Nonlinear static and dynamic analysis of this SMRF in the time domain is performed using ground motions representing the Northridge Earthquake. Subsequently, a detailed uncertainty analysis is conducted for the building using an ensemble of earthquake ground motions. Probability distributions for deformation-related limit states, described in terms of maximum roof displacement or interstory drift, are constructed. Building fragilities that are useful for condition assessment of damaged building structures and for performance-based design are developed from these distributions.

건설공사의 외국인 근로자 고용 실태 및 작업능력 변화에 대한 연구 (A Study on the Employment Condition and the Change of the Work Ability for the foreign Labors in Construction Field)

  • 박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.7-8
    • /
    • 2011
  • The use of foreign labors was inevitable at the construction site in Korea. Most construction companies are being used them in the workplace due to the cheap labor, but their work ability are insufficient as much as Korean labors. In this paper is expected to confirm the foreign labors' employment conditions and study to analyze the changing of foreign labors' work ability.

  • PDF

BUILDING AMD INTEGRATION OF POLAND WITH THE EUROPEAN UNION

  • Barbuzynski Stasiek;Kim Soo-Yong;Lee Young-Dai
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.315-320
    • /
    • 2001
  • Strategic aim of Poland is an accession to The European Union. This accession means consolidation of democratic transformations and acceleration of economical development. Possibly full and quick execution of preparing works at building domain is one of conditions of Polish membership in the European Union. Poland has to adopt rules and standards, which are required at EU. It will permit to make polish companies more attactive at international market. We should know, that economical, legal whether political reforms, this is not all what consists on membership at the Union European. We must change internally, become open to the world, to represent dynamism, enterprise, knowledge and culture. We must become more tolerant and be able to communicate with people with different culture whether political orientation, we have to accept this dissimilarity and will find way of dialogue and cooperation.

  • PDF

Urban Informatics: Using Big Data for City Scale Analytics

  • Koo, Bonsang;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-43
    • /
    • 2015
  • Urban Informatics, the application of data science methodologies to the urban development and planning domain, has been increasingly adopted to improve the management and efficiency of cities. This paper introduces state of the art use cases in major cities including New York, London, Seoul and Amsterdam. It also introduces recent advances in using Big Data by multi-lateral institutions for poverty reduction, and startups utilizing open data initiatives to create new value and insights. Preliminary research performed on using Seoul's open data such as building permit data and health code violations are also introduced to demonstrate opportunities in this relatively new but promising area of research.

  • PDF