• Title/Summary/Keyword: Building maintenance management

Search Result 543, Processing Time 0.023 seconds

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

IFC test between commercial 3D CAD application using IFC (IFC를 중심으로 한 상용 3D CAD의 호환성테스트)

  • Lim, Jae-In;Kim, Jae-Woo;Kwon, Hyuk-Do;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.85-94
    • /
    • 2008
  • The process of construction industry basically consists of many complicated phase, such as planning, design, construction, MO&R(Maintenance, Operation, and Repair), and deconstruction. And various participants communicate each other during every phase of process. Since construction components have become more complex and diverse recently, many researches on how to exchange and standardization of building. However, in Korea research on IFC(Industry Foundation Classes) which is a standard for international data exchange have been conducted with only study limited Issues, such as studies on the development of 2D extension model for IFC, researches on 3D or 4D based IFC extension, and etc. This stuff covers tests of the compatibility among commercial 3D CAD programs using IFC file format. Several problems of the current IFC model are retrieved as a result.

A Study on the Status and Actual Condition of Suspended Buildings in Gangwon (강원도 공사중단 건축물의 현황 및 실태 조사 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.138-144
    • /
    • 2019
  • To analyze the present state of buildings suspended in Gangwon and estimate the compressive strength by visual inspection and Schmidt hammer method in order to analyze durability etc.. In this study, we analyzed the problems that existed in the location where construction is suspended and efficient management method. Expected construction restoration of construction will be restarted, and important parts of the construction site should be given the best protection measures so that the quality can be maintained thoroughly. The construction of the suspended construction is exposed to the freezing and thawing damage over time. Therefore, it is necessary to take measures such as maintenance, and take protective measures by establishing a plan to improve the durability of buildings that are under construction.

A Research on the Japanese Three-Dimensional Road System for Three-Dimensional Development of Road Space (도로 공간의 입체적 개발을 위한 일본 입체도로제도에 관한 분석)

  • Baek, Seung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.309-316
    • /
    • 2020
  • This study analyzed Japan's three-dimensional road system as part of a study on urban regeneration plans through the three-dimensional use of road space. The three-dimensional road system integrates the Road Act, Urban Planning Act, and the Building Standard Act. The advantage of the three-dimensional road system is that landowners can freely use the space above and below the road so that they can live and operate sustainably, and road managers have the advantage of reducing the land acquisition costs because they only acquire rights to the road. In terms of type, it is applied to a variety of integrated and separated structures in elevated roads, underpasses, free passages, parking lots, and monorails. In addition, in the case of development methods, the degree of freedom of development plans is improved by enabling integrated maintenance of roads and buildings. Management stability is improved by applying management and law-based authority according to the Road Act. In this way, the three-dimensional road system provides support to maximize the use of limited available land through the three-dimensional use of road space, and to develop sustainable and good urban areas in development areas.

The Exploratory Study on IT Investment Management of the Public Sector Based on Forecasting (수요예측기반의 공공정보화 투자관리방안에 대한 탐색적 연구)

  • Lee, Jae-Du;Park, Sae-Gue
    • Journal of Information Technology and Architecture
    • /
    • v.11 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • From 2004 to 2013, the annual investment for the ICT sector in Korea amounted to about 3.2 trillion won. Depending on whether the government policy allowed for budget increases and/or decreases, this impacted the investment in the ICT sector. In particular, the fixed costs of operation and maintenance lead to a reduced chance for a new potential demands in IT programs. Even though a situation may exist that there are insufficient funds available, there is a need for building a sustainable long-term IT investment management system. The purpose of this study is to conduct basic research for the arrangement of preparation to meet IT needs required in the public sector. For this, this paper introduces the concept of IT Investment Management based on prudent forecasting. After both foreign and domestic relevant cases are reviewed, implications will be derived from the aforementioned cases. Through this process, the direction of IT Investment Management based on forecasting for the IT projects decision making will be suggested. These research results could be used for helping to develop better policies and a more efficient management of the public sector IT budget.

A Study on Ways to Improve Safety Management through Analysis of Fire Cases in Multiple-user Buildings (다중이용업소의 화재사례 분석을 통한 안전관리 개선방안 연구)

  • Lee, Jae Wook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.191-201
    • /
    • 2022
  • In this study, we are going to derive problems for fire and safety management in multiple-user Buildings and suggest improvement measures to prevent recurrence through analysis of legal operation status for safety management of multiple-user Buildings and case studies of large-scale fires in multiple-user Buildings. For this study, first, the current state of the industry and fire occurrence status were investigated through theoretical considerations of the multi-use industry, and then the previous research on the multi-use industry was analyzed. and by analyzing the legal and institutional status of multiple-user Buildings, problems were derived through cases such as the Jecheon fire in Chungcheongbuk-do, the Inhyeon-dong fire in Incheon, and the Songpa-gu fire in Seoul. As a result, first, the necessity of strengthening the initial fire response capability. Second, thorough maintenance and management of emergency exits. Third, the need for rational regulation of upholstery. Fourth, reinforcement of fire safety education and training. Fifth, strengthening of installation standards for firefighting and safety facilities. Sixth, we derive the result that it is necessary to raise awareness about safety management, compare and analyze it with legal and institutional contents, and suggest solutions accordingly. When looking at the causes of fires in multi-use buildings, building owners, business owners, and employees think that there is no possibility of a fire occurring in their business premises, so there is a lack of awareness. It is necessary to raise awareness through education and publicity of firefighters and related administrative agencies.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

A Study on Obtaining Feedback Function of Disaster Information Management using Information & Communication Technology (ICT기술을 이용한 방재정보 관리의 환류기능 확보에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.1
    • /
    • pp.73-88
    • /
    • 2015
  • Due to the cases of recent global warming and unusual weather etc., large-scale natural disasters such as typhoons, floods, snow damage occur frequently across the continents such as Southeast Asia and North America, South America etc. and risks of earthquakes and tsunami are also increasing gradually in Korea which has been regarded as a safe zone and disaster types are also being diversified such as typhoons, floods, heat waves, heavy snow and damage scale is also enlarged. In addition, due to geographical characteristics or lack of infrastructure, disasters tended to occur intensively around a specific region or city in the past but disasters occur throughout the country in recent years so preparation for disaster prevention has emerged as an urgent challenge issue. Therefore, considering that the plan of obtaining the effective feedback function of disaster Information is very important in the proactive and software aspects for disaster reduction, this paper analyzed this three aspects of contents, procedural and contextual aspects and proposed the plan. First, in the content aspect, building disaster prevention information communication Infrastructure, building urban and regional disaster prevention system, obtaining concurrency and sharing of information and second, in the procedural aspect, active utilization of ICT(Information and Communication Technology) of the prevention stage, disaster prevention information collection and analysis reinforcement of the preparation stage, improvement of decision-making structure and field command system of the response stage, recovery system related information promotion of the recovery stage were proposed as alternatives and finally, in the contextual aspect, if disaster prevention information is effectively managed through maintenance of disaster prevention information related systems, obtaining domainality by disaster prevention work, improvement of the ability to judge the situation, obtaining comprehensive and feedback function etc, it is considered to significantly contribute to reducing natural disasters.

Remodeling Process Model Applying Service Life and Functionality Evaluation for Military Facilities (내용연수와 기능성 평가를 활용한 군 시설물 리모델링 대상 선정 프로세스 모델)

  • Cho, Jongwoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Jaegon;Moon, Hyo-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.41-52
    • /
    • 2015
  • The number of military facilities has been rapidly increased due to growing requirement of modernization and military welfare. However, adequate maintenance has not implemented to these facilities. As a result, they are deteriorated quickly and require performance enhancement treatments. There are two ways of performance enhancement, reconstruction and remodeling. Despite the research result that remodeling within the standard remodeling range is more economical, remodeling of military facilities is not considered equivalent to reconstruction as an option of performance improvement. Therefore, derived from the relationship between performance change during life cycle of building and range of remodeling needs, this study tries to propose Remodeling Process Model(RPM) which uses a method to choose remodeling in a Specific Point of Time(SPT) when remodeling is considered more economical than reconstruction. In addition, this study suggests practical service life and functionality evaluation standard together which require to realize the RPM. This RPM make it possible to avoid the cases that facilities which do not have any problem on structural reliability but have low level of functionality miss appropriate remodeling timing and inevitably choose reconstruction as a performance improvement option. It also present the possibility of simple reconstruction / remodeling decision-making for facility managers who administrate building having various type, compilation and elapsed time. Consequently, this process model focusing on remodeling more may contribute to reduce resource waste caused by reconstruction.

A Study on the Analysis of Current Situation of Safety Inspections cost in Apartment houses (공동주택 안전점검대가 현황분석에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Yun, Yeong-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.62-70
    • /
    • 2014
  • An apartment house, a private facility, is a house built for many persons to live independently in a building. An apartment house is a building where life damage can happen most in case of a safety accident due to insufficient inspections. However, formal inspections are being realized due to awareness shortage of managing bodies about safety inspection and low-price order-receiving of diagnosing enterprises via the lowest bidding method. This is because it is judged that remarkable costs are inputted in repairs and reinforcement such as maintenance of a structure and that there is a large possibility of human damage in case of a safety accident in a structure. So, this paper aims to derive the points to improve in the current criterion to execute an efficient detailed inspection. As its method, the design price and execution price situation of 66 buildings inspected in detail for recent 3 years for the class 2 facilities in Gwangju Metropolitan City and Jeonranam-do are examined and analyzed. The state2 object buildings to inspect are selected through this. And this paper aims to present the points to improve through the analysis of current problems by evaluating the detailed inspection report and the detailed inspection execution price calculation criterion for the selected 10 apartment houses.