• 제목/요약/키워드: Building inspection

검색결과 613건 처리시간 0.021초

적외선열화상카메라를 이용한 건식벽체에 부착된 타일에 대한 시공상태 점검기준 (Inspection Method Standardization on Conditions Following Attached Tiles on Drywalls Using Infrared Thermal Camera)

  • 한윤정;마승재;최성민;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.144-145
    • /
    • 2015
  • In this study, it is contemporaneously understood that tile attachment on CRC board do not have a regulated standard on quality control and construction. Furthermore, there is also a definite lack of standardization on nondestructive inspection of tiles. This thesis investigates a diagnosis method of spot bonding tile attachment using infrared thermal camera as a way to propose a systematic nondestructive inspection method after tile construction.

  • PDF

건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출 (A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data)

  • 유나영;김하늘;김하림;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

Automated condition assessment of concrete bridges with digital imaging

  • Adhikari, Ram S.;Bagchi, Ashutosh;Moselhi, Osama
    • Smart Structures and Systems
    • /
    • 제13권6호
    • /
    • pp.901-925
    • /
    • 2014
  • The reliability of a Bridge management System depends on the quality of visual inspection and the reliable estimation of bridge condition rating. However, the current practices of visual inspection have been identified with several limitations, such as: they are time-consuming, provide incomplete information, and their reliance on inspectors' experience. To overcome such limitations, this paper presents an approach of automating the prediction of condition rating for bridges based on digital image analysis. The proposed methodology encompasses image acquisition, development of 3D visualization model, image processing, and condition rating model. Under this method, scaling defect in concrete bridge components is considered as a candidate defect and the guidelines in the Ontario Structure Inspection Manual (OSIM) have been adopted for developing and testing the proposed method. The automated algorithms for scaling depth prediction and mapping of condition ratings are based on training of back propagation neural networks. The result of developed models showed better prediction capability of condition rating over the existing methods such as, Naïve Bayes Classifiers and Bagged Decision Tree.

An Augmented Reality System for the Construction Industry and Its Impact on Workers' Situational Awareness

  • Abbas, Ali;Seo, JoonOh;Kim, MinKoo
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.129-136
    • /
    • 2020
  • Augmented reality (AR) technology assists construction workers by superimposing additional virtual information onto their real worksite environments. Ideally, this provides them with a better understanding of their tasks and hence boosts task performance. However, the additional information that AR places in users' field of view could limit their ability to understand what is going on in their surroundings and to predict how conditions may change in the near future. AR-assisted systems on construction sites could therefore expose their users to safety risks due to disturbance from the system. Hence, it is important to understand how AR-assisted systems can block users' understanding of their immediate environments, and in turn, how worksite safety in the construction industry could be improved through better design of such systems. This preliminary research conducted a laboratory experiment that simulated rebar inspection tasks and compared the situational awareness of AR users against that of subjects using traditional paper-based inspection methods, as measured by the Situation Awareness Rating Technique. Based on the results, we discuss the safety impact of head-mounted AR-assisted displays on situational awareness during construction tasks.

  • PDF

이미지 기반 건설현장 수치 측정 모델 기초연구 (Preliminary Study for Image-Based Measurement Model in a Construction Site)

  • 윤세빈;강민균;김창원;임현수;유위성;김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.287-288
    • /
    • 2023
  • The inspection work at construction sites is one of the important supervisory tasks, which involves verifying that the building is being constructed by the numerical values specified in the design drawings. The conventional measuring method for inspection involves using tools or equipment such as rulers directly by the personnel at the site, and it is usually confirmed by vision. Therefore, this study proposes an model to measure numerical values on images of the construction site. Through the case study to measure the installation interval of jack supports, the proposed algorithm was verified the effiect and validity. The results of this study suggest that it can support inspection work even in the office, which may have been overlooked by on-site inspectors, and contribute to the digitization of inspection work at construction sites.

  • PDF

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

3D스캐닝을 이용한 건설공사 스마트 품질점검 방안에 관한 연구 (Smart Quality Inspection Scheme for Construction Project Using 3D Scanning Technology)

  • 이돈수;김광희
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.191-198
    • /
    • 2020
  • 건설산업에도 스마트 건설기술들이 많이 도입되고 있으며, 여러 기술 중 3D 스캐닝과 BIM을 이용한 품질관리를 시도하는 회사가 증가하고 있다. 따라서 본 연구에서 3D 스캐닝과 BIM을 현장 품질점검 사례에 적용하여 활용가능성과 효용성을 확인하였다. 그 결과 3D 스캐닝과 BIM을 활용한 품질점검은 기존에 시행했던 품질점검보다 시간적으로 단축되고 적은 인력으로도 실현이 가능하다는 것을 확인하였다. 따라서 품질점검의 다양한 분야에 3D 스캐닝과 BIM을 활용한 기술을 적용할 수 있을 것으로 사료된다.

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.