Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구 (A Study for Conflict in Public Construction Projects Based on Online News)

  • 백승원;한승헌;윤성민;임종록;남지현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF

터널 건설 프로젝트 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구 (Risk Factors Analysis and Quantitative Risk Assessment Model for Tunnel Construction Project)

  • 정승아;안성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.363-364
    • /
    • 2023
  • The tunnel construction projects is demanded more efficient risk management measures and loss forecasts to prepare for risk losses from an increase in the trend of tunnel construction. This study aims to analyze the risk factors that caused the loss of material in actual tunnel construction and to develop a quantified predictive loss model, based on the past loss record of tunnel construction projects.

  • PDF

COMPARATIVE ANALYSIS OF BIM ADOPTION IN KOREAN CONSTRUCTION INDUSTRY AND OTHER COUNTRIES

  • Jongsung Won;Ghang Lee;Chijoo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.587-592
    • /
    • 2009
  • Construction companies in Korea have shown interest in BIM (Building Information Modeling) even if late, adopted it, and applied it to several projects. But, it is hard to figure out the status of BIM implementation. Thus, this study is to figure out the status of BIM implementation in Korea by surveying major construction companies in Korea and comparing with similar surveys abroad. The survey result shows that only 11 companies in Korean construction industry adopted BIM. The clash check (73%) was mostly used among various BIM functions and other functions were used less than 30%. As of 2008, only 8 construction companies have used BIM in 27 projects and thus, Korean companies are in the BIM introduction period. Therefore, successful introduction of BIM is required by benchmarking the BIM introduction process of overseas construction industries

  • PDF

리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 - (Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -)

  • 조규만;김태훈
    • 한국건축시공학회지
    • /
    • 제18권4호
    • /
    • pp.385-394
    • /
    • 2018
  • 오피스 건축물의 리모델링 사업에서, 신축과는 다른 리모델링 사업의 다양한 리스크로 인해 공기가 지연되는 사례가 빈번하게 보고되고 있다. 이에 본 연구에서는 리모델링 프로젝트의 리스크 요인들과 리모델링 공사의 작업별 공기지연 발생가능성의 관계를 분석하고자 수행되었다. 리모델링 사업의 경험이 있는 29명의 전문가 면담결과의 과학적 통계적 분석을 통해, 리모델링 사업의 리스크 요인과 그로 인한 작업별 공기지연 가능성을 크게 3가지 측면에서 분석하였다. 즉, (i) 리모델링 공사의 작업별 공기지연 가능성, (ii) 리모델링 공사의 리스크 요인별 중요도, (iii) 리모델링 공사의 공기지연에 영향을 미치는 리스크 요인 등 세가지 분석결과를 제시하였다.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

An Algorithm for Scheduling Repetitive Projects with Resource Continuity and Different Batch Sizes

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.565-578
    • /
    • 2013
  • Batch production is common in repetitive construction projects, and it is not unusual for different batch sizes to be used by contractors in one project. While several scheduling methods, such as the Linear Scheduling Method (LSM) and the Repetitive Scheduling Method (RSM) have been proposed and used, no mathematical method for repetitive construction projects has been developed, and it is difficult to consider different batch sizes with the existing methods. An original mathematical algorithm for scheduling repetitive projects with different batch sizes is proposed in this study. This algorithm is illustrated with assumptions of resource continuity and single path in a project and introduces new terms, control batch and critical batch. The algorithm logics and mathematical equations are validated by comparison with the outcomes from a graphical scheduling approach through a simple and practical hypothetic project. As a result, it is expected that the proposed algorithm can be easily adapted and extended to computer software for scheduling, and can be a starting point for research on batch size management in repetitive construction projects.

A QUALITATIVE SURVEY ON SUCCESS FOR MAINTENANCE PROJECTS

  • Albert P C Chan;Daniel W M Chan;Edmond W M Lam
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.186-195
    • /
    • 2007
  • Key Performance Indicators (KPIs) are the criteria of measuring project performance in order to attain construction excellence. Previous researchers have examined the abstract concept of success for general new construction and identified its relationship with the factors of success. In fact, most buildings exist to satisfy the needs of people. With the passing of time and change in technology, buildings have to be maintained and renovated in order to continue functioning properly for the benefits of users. Therefore, criteria and factors of success have increasingly attracted the attention of both researchers and practitioners, especially in cities where buildings become ageing. However, the topic of project success for maintenance projects is less discussed in previous research, and project participants, including maintenance surveyors should be able to identify the success measurement and its associated factors for performance improvement. This study fills the research gap by investigating the criteria and factors of success for maintenance projects. It first provides a summary of the literature review on the criteria and factors of success for construction projects. An empirical study has also been carried out with ten practitioners in Hong Kong to further identify the criteria and factors critical for the success of maintenance projects in practice. While most criteria and factors of success for new construction projects are also applicable to maintenance projects, participants in maintenance projects believe that effective communication is in particular important to provide quality service to the end-users.

  • PDF

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구 (A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects)

  • 유준혁;김옥규
    • 한국건축시공학회지
    • /
    • 제21권4호
    • /
    • pp.347-359
    • /
    • 2021
  • 최근 건설공사는 초대형화로 단일 공사규모가 복잡해지고 천문학적인 공사비가 소요되는 프로그램 관리 형태의 성격을 지니는 사업이 등장하고 있다. 특히, 대규모 건설사업과 같이 프로그램 수준에서 관리가 절대적으로 필요한 사업은 계획된 일정 및 비용에 대한 전제적인 관리가 필요하다. 하지만 국내의 경우 구체적인 공사지연에 관한 관리기준이 부재한 현실이다. 이에 본 연구에서는 대규모, 장기간 진행되는 프로그램 수준의 대규모 건설사업을 성공적으로 수행하고 공정지연 및 부진사업을 사전에 방지하기 위한 지연관리지수(Delay Management Index, DMI)를 개발하였다. 이를 통해 대규모 복합건설 프로젝트를 대상으로 사례연구를 수행하였으며, 프로그램 수준 건설사업을 위한 지연예방체계를 구축하였다.