• Title/Summary/Keyword: Building Infrastructure

Search Result 1,205, Processing Time 0.024 seconds

Effects of Hospital Location Strategy and Internal Competence on Reintegration Intention -Adjustment of Hospital Types- (병원의 입지전략과 내부역량이 재이용의도에 미치는 영향 -병원유형의 조절효과-)

  • Kim, Duck Ki;Kim, Woo-Jong
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.11
    • /
    • pp.75-86
    • /
    • 2018
  • This study analyzed the relationship between re-applications and the degree of re-applications under the assumption of a complex interaction between the location strategy and the internal capacity of a nursing home. The results of the study are as follows. First, although the relative influence on re-use is greater in hospital internal capacity (${\beta}=0.303$) than in hospital location strategy (${\beta}=0.313$) both factors have a statistically significant effect on the degree of re-use. Second, the importance of location strategy was found to be more important for rehabilitation-enhanced nursing hospitals than for general care (${\beta}=0.43$). It is suggested that detailed preparations should be made based on factors such as location marketability, traffic infrastructure, building sales, and medical concentration. Third, internal hospital capacity did not show any adjustment effects due to hospital type, and it was confirmed that both were important factors for general care and rehabilitation-enhanced hospitals.

Monitoring on Compressive Strength and Carbonation of Reinforced Concrete Structure with 100% Recycled Aggregate (순환골재를 100% 사용한 철근콘크리트 구조물의 압축강도 및 탄산화 진행 모니터링)

  • Lee, Sang-Yun;Kim, Gyu-Yong;Yoon, Min-Ho;Na, Chul-Sung;Lee, Sang-Kyu;Shin, Sung-Gyo;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.383-389
    • /
    • 2019
  • The supply of natural aggregate for concrete has been difficult, and the amount of construction waste has been continuously increasing. Therefore, the necessity of using recycled aggregate made of construction waste as aggregate is rised. Therefore, many studies on the characteristics of concrete using recycled aggregate have been made and positive studies have been reported mainly in recent studies. A study on the chlorides binding effect of the mortar with recycled coarse aggregate has been reported. However, due to the user's perception of waste, most of the recycled aggregate currently produced is used only for low value-added products. In order to improve the recognition of recycled aggregate and the user's perception of recycled aggregate concrete, long-term monitoring of the structure with 100% recycled aggregate was conducted to confirm the applicability of the recycled aggregate concrete.

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

Development of A Model for Diagnosing Management Capabilities of Public Facility (공공시설물관리 역량 진단 모델 개발)

  • Sung, Yookyung;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.555-566
    • /
    • 2020
  • Recently, the aging of public facilities in Korea have accelerated, and the existing framework for facility management is shifting toward to facility asset management in terms of performance-based proactive control. Therefore, the operation of public facility involves both safety assurance from the deteriorated facilities and management capabilities for sustainable maintenance in the required valuation and level of service, such as valuation of facility assets, life-cycle management plans, financing, and so on. In this study, the Facility Asset Management Indicator(FAMI) has been developed for public facility asset management, and it provides the quantitative management grade, based on international standards, such as ISO 55000 series and International Infrastructure Management Manual(IIMM). The FMMI includes 10 key areas to apply a diagnosis model into management capabilities, 113 detailed elements, and 5 maturity grades. As the importance of public facility asset management is increasing constantly, this is expected to identify previously the strengths and weaknesses of public facility operating institutions. Eventually, they can obtain the effective ways to improve their own capabilities, minimize the public funds, establish the strategies for innovating the current management structures, and operate stably the facilities in the required performance.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

Architectural Product and Formwork Manufacture using 3D Printing - Applicability Verification Through Manufacturing Factor Prediction and Experimentation - (3D 프린팅을 통한 거푸집 제조 및 건축 상품 구현 - 제조인자예측과 실험을 통한 적용가능성 검증 -)

  • Park, Jinsu;Kim, kyung taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.113-117
    • /
    • 2022
  • Additive manufacturing (AM, also known as 3D printing) technology is digitalized technology, making it easy to predict and manage quality and also, have design freedom ability. With these advantages, AM technology is applied to various industries. In particular, a method of manufacturing buildings and infrastructure with AM technology is being proposed to the construction industry. However, the application of AM technology is restricted due to problems such as insufficient history and quality of technology, lack of construction management methods, and certification of manufacturing products. Therefore, the manufacture of architectural products is implemented with indirect AM technology. In particular, it manufactures formwork using AM and injecting building materials to implement the architectural product. In this study, hybrid type material extrusion AM is used to manufacture large-sized formwork and implement building products. Moreover, we identify factors that can predict productivity and economic feasibility in the additive manufacturing process. As a result, design optimization results are proposed to reduce the production cost and time of architecture buildings.

Zero Trust-Based Security System Building Process (제로 트러스트 기반 보안체계 구축 프로세스)

  • Ko, Min-Hyuck;Lee, Daesung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.12
    • /
    • pp.1898-1903
    • /
    • 2021
  • Recently, the need to be wary of internal access such as internal access as well as external attackers' access to work has increased due to network expansion, cloud infrastructure expansion, and changes in working patterns due to COVID-19 situations. For this reason, a new network security model called Zero Trust is drawing attention. Zero Trust has a key principle that a trusted network does not exist, and in order to be allowed access, it must be authenticated first, and data resources can only be accessed by authenticated users and authenticated devices. In this paper, we will explain these zero trust and zero trust architectures and examine new security application strategies applicable to various companies using zero trust and the process of building a new security system based on the zero trust architecture model.

Study of Satellite Image Analysis Techniques to Investigate Construction Environment Analysis of Resource Development in the Arctic Circle - Alberta, Canada (북극권 자원개발 건설환경 조사를 위한 위성 영상 분석 기법 연구 - 캐나다 앨버타주 대상)

  • Kim, Sewon;Kim, YoungSeok
    • The Journal of Engineering Geology
    • /
    • v.31 no.4
    • /
    • pp.549-559
    • /
    • 2021
  • The Arctic Circle's huge amounts of fossil fuels and mineral resources are being developed and subjected to active construction projects. Global efforts are continuing to actively respond to climate change, but the dependence on fossil fuels remains high. This study reports a preliminary survey conducted in Alberta, Canada, where oil sand resources are actively developed. A land cover map was prepared using satellite imagery to reduce the cost and time of surveying a wide area. Results likely useful to resource development projects such as ground surface temperature and snow cover distribution were derived by using the obtained image classification results. It is expected that the results of the present research and analysis will be used to establish strategies for the successful promotion and operation of projects to develop resources in the Arctic.

Experimental Study for Thermal Characteristics of Frozen Soil Samples (동토 시료의 열적 특성 분석을 위한 실험적 연구)

  • Sewon, Kim;Sangyeong, Park;Jongmuk, Won;YoungSeok, Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.31-40
    • /
    • 2022
  • Recently, the Arctic resource development project, where undeveloped energy resources (oil, natural gas, etc.) are deposited, is actively being promoted for the perspective of diversifying the construction market and developing future energy resources. However, the frozen ground always has problems such as sinking and frost-heaving due to extreme weather. Therefore, it is necessary to analyze the thermal characteristics of the frozen soil to secure the stability of the ground structure. In this study, a series of laboratory tests were performed to evaluated the thermal characteristics of frozen soil samples in the oil sand field in Alberta, Canada. In additon, it was compared with the results of domestic(Gangwond-do) sample performed under the same conditions. As a comparison results of the experiments, it was clarified that the different frozen water content and thermal conductivity characteristics by temperature after completion of freezing could affect the frozen soil behavior.