• Title/Summary/Keyword: Building Information Control

Search Result 677, Processing Time 0.032 seconds

A Study on the Selection of Building Registration Method using GIS (GIS를 이용한 건물등록 방법 선정에 관한 연구)

  • 양인태;오이균;유영걸;천기선
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.613-616
    • /
    • 2004
  • Recently, in a field of cadastre, a computerization of cadastral map is in progress with great growth of GSIS field. Also, the needs for the integration of land and building information are widely increasing for integral-management and its application of various land related information. Through a revision of cadastral laws to replace the existing 2D-Cadastre with the 3D-Cadastre, a legal basis to register the position of buildings and facilities is prepared in the governmental or civil fields. This paper presented 3D-Cadastre theory that has been studied on Europe and surveyed building position directly with Totalstation at cadastral control point after choosing pilot test area, Also, the most efficient surveying method of registering building in a cadastral map is presented with comparing and analyzing building position after surveying digital orthophoto and digital map.

  • PDF

Graph-based Building of a Precise Map for Autonomous Vehicles Using Road Marking Information (도로 노면 정보를 이용한 그래프 기반 자율주행용 정밀지도 생성)

  • Cho, Sung-Joon;Im, Jun-Hyuck;Jee, Gyu-In
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.22 no.12
    • /
    • pp.1053-1060
    • /
    • 2016
  • As location recognition for autonomous vehicles develops, the need for a precise map for autonomous driving has increased. A precise map must be built based upon accurate position. Recent studies have accelerated research in this area by using various sensors that calculate the accurate position by comparing and recognizing objects around the roads. However, application of such methods is limited because these studies only take objects with significant verticality into consideration. Thus, new research is needed to overcome the limitations: a method that is not constrained by the existence of certain types of surrounding objects shall be proposed. Most roads contain road marking information, such as lanes, direction signs, and pedestrian crossings. Such information on the road surface is a valuable resource for building a precise map. This paper proposes a method of building a precise map by using road marking information.

Rapid construction delivery of COVID-19 special hospital: Case study on Wuhan Huoshenshan hospital

  • Wang, Chen;Yu, Liangcheng;Kassem, Mukhtar A.;Li, Heng;Wang, Ziming
    • Advances in Computational Design
    • /
    • v.7 no.4
    • /
    • pp.345-369
    • /
    • 2022
  • Infectious disease emergency hospitals are usually temporarily built during the pneumonia epidemic with higher requirements regarding diagnosis and treatment efficiency, hygiene and safety, and infection control.This study aims to identify how the Building Information Modeling (BIM) + Industrialized Building System (IBS) approach could rapidly deliver an infectious disease hospital and develop site epidemic spreading algorithms. Coronavirus-19 pneumonia construction site spreading algorithm model mind map and block diagram of the construction site epidemic spreading algorithm model were developed. BIM+IBS approach could maximize the repetition of reinforced components and reduce the number of particular components. Huoshenshan Hospital adopted IBS and BIM in the construction, which reduced the workload of on-site operations and avoided later rectification. BIM+IBS integrated information on building materials, building planning, building participants, and construction machinery, and realized construction visualization control and parametric design. The delivery of Huoshenshan Hospital was during the most critical period of the Coronavirus-19 pneumonia epidemic. The development of a construction site epidemic spreading algorithm provided theoretical and numerical support for prevention. The agent-based analysis on hospital evacuation observed "arched" congestion formed at the evacuation exit, indicating behavioral blindness caused by fear in emergencies.

The Novel Configuration of Integrated Network for Building Energy System (빌딩 에너지시스템 통합네트워크 구축에 관한 연구)

  • Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.229-234
    • /
    • 2008
  • The new millennium has started with several innovations driven by fast evolution of the technologies in energy sector. A strong impulse towards the diffusion of new economical efficient technologies regulatory incentives related to energy production from renewable source and a small scale building trigeneration and to promotion of more sustainable environmental-friendly generation solutions, the evolution of electricity markets, more and more binding local emission constraints, and the need for improving the security of supply to reduce the energy system vulnerability. The 24 percentage energy quantify of total energy consumption consumes in commercial buildings and residential houses and the 30% portion of total $CO_2$ emissions covers also in the commercial buildings and residential houses sector. To cope with efficiently this energy sinuation in building sector, Building microgrid or building tooling, heating & power(BCHP) system has been interested in recent day due to meeting thermal and electric energy requirements efficiently and with appropriate energy quality. A multi agent system is a collective of intelligent agents that communicate with each other and work cooperatively to achieve common goals. Also, it is to medicate and coordinate communication between Control Areas and Security Coordinators for teal-time control of the BCHP system and the power pid. In this new circumstance, it is very important to integrate the power and energy delivery system and the information system(communication, networks, and intelligent equipment) that controls it. Therefore, development of smart control modules with open communication protocol and seamlessly interchange the data and information between control network and data network including extranet and intranet give a great meanings. We designed and developed the TCP/IP-CAN IED agent modules and ModBus./LonTalk/(TCP/IP) IED agent ones to configure the multi-agent system based smart energy network of commercial buildings and also intelligent algorithms for inverter fault diagnostics which ran be operated in control level or agent level network.

  • PDF

A Study on Improvement of Structural Sliding Method Using AC Induction Motor Servo Control Device (AC유도전동기 서보제어장치를 이용한 구조물 슬라이딩공법)

  • Cho, Young-nam;Han, Jae-woong;Jang, Won-tae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.10a
    • /
    • pp.235-237
    • /
    • 2018
  • In spite of the superiority of the sliding method in the building construction field, the AC induction motor servo control device is used as the power control technology in the building construction field in order to improve the problems of the hydraulic power control method, thereby contributing to the precision control and the productivity improvement. Based on Induction Motor Servo Controller, we proposed the development of a mobile sliding method using a complex combination of PC and MITY (MS) Servo.

  • PDF

The Development of a Map Building Algorithm using LADAR for Unmanned Ground Vehicle (레이저 레이다를 이용한 무인차량의 지도생성 알고리즘 개발)

  • Lee, Jeong-Yeob;Lee, Sang-Hoon;Kim, Jung-Ha;Han, Chang-Soo
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.15 no.12
    • /
    • pp.1246-1253
    • /
    • 2009
  • To be high efficient for a navigation of unmanned ground vehicle, it must be able to distinguish between safe and hazardous regions in its immediate environment. We present an advanced method using laser range finder for building global 2D digital maps that include environment information. Laser range finder is used for mapping of obstacles and driving environment in the 2D laser plane. Rotary encoders are used for localization of UGV. The main contributions of this research are the development of an algorithm for global 2D map building and it will turn a UGV navigation based on map matching into a possibility. In this paper, a map building algorithm will be introduced and an assessment of algorithm reliability is judged at an each environment.

Study on Network Throughput of Power Line Communication System in In-Building Network (전력선 통신 시스템의 구내 네트워크 데이터 처리량 연구)

  • Jang, Ho-Deok
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.14 no.1
    • /
    • pp.43-47
    • /
    • 2021
  • This paper investigates the network throughput of PLC (Power Line Communication) system in the in-building network. The OFDM (Orthogonal Frequency Division Multiplexing) modulation format and adaptive bit loading algorithm is used to minimize the effect of signal loss and noise on transmission performance in the power line channel characterized by frequency selective fading. The network throughput of the PLC system which consists of gateway and CPE(Customer Premise Equipment) PLC modem in the in-building network is measured by network performance measurement tool, iperf and analyzed according to the TCP (Transmission Control Protocol) window size.

Suggesting A Concept of 3D Spatial Event Information Control System for Visitor Flow Control in Multi Complex Building (다중이용시설물 이용객의 흐름관리를 위한 3D 기반 공간 이벤트 정보 관리시스템의 개념 제안)

  • Ahn, Byung-Ju;Yoon, Ja-Young;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.125-135
    • /
    • 2008
  • A controller who is responsible for visiter's safety makes a decision about measures for visiter safety in human-based decision making process. Many potential accidents that are caused by human error lurk in results of the process. The accidents can be decreased by changing the decision making process from human-based into technology-based. Technology-based decision making process can catch a controller's attention through data filtering, alarm filtering, and so on. So, the controller can get information on occurrence of an unforeseen accident pro-actively. The objective of this study is to suggest a concept of 3D spatial information control system for visitor flow control in multi complex building using technology-based decision making process. This study shows utilization of the system and contribution.

A study on humidity control characteristics of inorganic paint (무기질 도료의 조습성능에 관한 연구)

  • Heo, Jung-Yong;Choi, Chang-ho;Lee, Yun-Gyu
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1225-1230
    • /
    • 2008
  • Recently the building material have been developed with the concept of controlling the indoor environment as well as the concept of emitting contaminants less. So, a lot of products with humidity control characteristics put it on the market. However, objective evaluation to these products doesn't work out. Thus consumers cannot obtain accurate information to these products. Therefore, we selected inorganic paint in the functionality materials and evaluated its humidity control characteristic in this research. We divided by four stages and evaluated this inorganic paint. The 1st and 2nd third experiments were executed on a natural condition and the fourth experiment was executed with humidity had been raised by using the humidifier.

  • PDF

An Integrated Information System for Power Distribution Management and Control (통합 배전 관리 및 제어 정보 시스템 구축 모델)

  • Cha, Sang-Kyun;Hwang, Sang-Yong
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.555-557
    • /
    • 1997
  • This paper discusses a set of critical requirements in building and using a shared, integrated information management system for power distribution management and control. It then proposes a modem, object-oriented information system model for building such a system based on the current state of arts in database, GIS, and WWW technologies. The key of the proposal is that the shared database system should be the basis of integration efforts in power distribution management and control. A small-scale prototype is being developed to demonstrate the effectiveness of the proposed model.

  • PDF