Rapid construction delivery of COVID-19 special hospital: Case study on Wuhan Huoshenshan hospital |
Wang, Chen
(College of Civil Engineering, Huaqiao University)
Yu, Liangcheng (College of Civil Engineering, Huaqiao University) Kassem, Mukhtar A. (Department of Quantity Surveying, Faculty of Built Environment & Surveying, Universiti Teknologi Malaysia) Li, Heng (Department of Building and Real Estate, The Hong Kong Polytechnic University) Wang, Ziming (College of Civil Engineering, Huaqiao University) |
1 | Lin, Y., Chen, Y., Huey-Wen, Yien, H., Huang, C. and Su, Y. (2018), "Integrated BIM, game engine and VR technologies for healthcare design: A case study in cancer hospital", Adv. Eng. Inform., 36, 130-145. DOI |
2 | Manning, R. and Messner, J.I. (2008), "Case studies in BIM implementation for programming of healthcare facilities", J. Inform. Technol. Constr., 13, 446-457. |
3 | Mazinani, M. (2020), "The novel zoonotic Coronavirus disease 2019 (COVID-19) pandemic: Health perspective on the outbreak", J. Healthcare Quality Res., In Press. https://doi.org/10.1016/j.jhqr.2020.09.004 DOI |
4 | Merschbrock, C. and Munkvold, B.E. (2015), "Effective digital collaboration in the construction industry: A case study of BIM deployment in a hospital construction project", Comput. Ind., 73, 1-7. DOI |
5 | Mousavi, E.S., Bausman, D. and Tafazzoli, M. (2020), "Renovation in hospitals: Training construction crews to work in health care facilities", Am. J. Infect. Control, 48(4), 403-409. DOI |
6 | Paul J.L. (1987), "Calculating evacuation time for tall buildings", Fire Safety J., 12, 237. DOI |
7 | Segars, J., Katler, Q., McQueen, D.B. and Kawwass, J.F. (2020), "Prior and novel coronaviruses, Coronavirus Disease 2019 (COVID-19), and human reproduction: What is known?", Fertil. Steril., 113(6), 1140-1149. DOI |
8 | Suzuki, J., Sasahara, T., Minami, K. and Yamada, T. (2020), "Impact of infectious disease consultation on patients with Staphylococcus aureus bacteremia at a Japanese tertiary hospital: A retrospective observational study", J. Infect. Chemotherapy, 26(8), 780-784. DOI |
9 | Choi, J., Leite, F. and de Oliveira, D.P. (2018), "BIM-based benchmarking system for healthcare projects: feasibility study and functional requirements", Automat. Constr., 96, 262-279. DOI |
10 | Alizadeh, R. (2011), "A dynamic cellular automaton model for evacuation process with obstacles", Safe. Sci., 49(2), 315-323. DOI |
11 | Enache-Pommer, E., Horman, M.J., Messner, J.I. and, Riley, D. (2010), A Unified Process Approach to Healthcare Project Delivery: Synergies Between Greening Strategies, Lean Principles, and Bim, Construction Research Congress 2010, 1376-1385. |
12 | Choi, J., Yun, S. and De Oliveira, D.P. (2016), "Developing a cost normalization framework for phase-based performance assessment of construction projects", Canadian J. Civil Eng., 43, 1075-1086. DOI |
13 | Davies, R. and Harty, C. (2013), "Implementing 'Site BIM': A case study of ICT innovation on a large hospital project", Automat. Constr., 30, 15-24. DOI |
14 | Ferdous, W., Bai, Y., Ngo, T.D. and Mendis, P. (2019), "New advancements, challenges and opportunities of multi-storey modular buildings: A state-of-the-art review", Eng. Struct., 183, 883-893. DOI |
15 | Ambat, A.S. and Vyas, N. (2020), "Assessment of preparedness against emerging infectious disease among private hospitals in a district of South India", Med. J. Arm. Force. India, In Press, https://doi.org/10.1016/j.mjafi.2020.02.007. DOI |
16 | Choi, J., Leite, F. and de Oliveira, D.P. (2020), "BIM-based benchmarking for healthcare construction projects", Automat. Constr., 119, 103347. DOI |
17 | Isikdag, U. (2012), "Design patterns for BIM-based service-oriented architectures", Automat. Constr., 25, 59-71. DOI |
18 | Kahn, N. (2009), "National healthcare capital project benchmarking-an owner's perspective", Health Environ. Res. Des. J., 3, 5-14. |
19 | Li, H., Lu, W. and Huang, T. (2009), "Rethinking project management and exploring virtual design and construction as a potential solution", Constr. Manage. Econom., 27(4), 363-371. DOI |
20 | Shirowzhan, S., Sepasgozar, S.M.E., Edwards, D.J., Li, H. and Wang, C. (2020), "BIM compatibility and its differentiation with interoperability challenges as an innovation factor", Automat. Constr., 112, 103086. DOI |
21 | Zhou, Y., Zhang, Z. and Wang, W. (2020), "Construction time, cost and testing data of a prefabricated isolation medical unit for COVID-19", Data Brief, 32, 106068. DOI |
22 | Talento, A.F., Fitzgerald, M., Redington, B., O'Sullivan, N., Fenelon, L. and Rogers, T.R. (2019), "Prevention of healthcare-associated invasive aspergillosis during hospital construction/renovation works", J. Hospital Infect., 103(1), 1-12. DOI |