• Title/Summary/Keyword: Building Fire

Search Result 1,758, Processing Time 0.029 seconds

Numerical Simulation on Disproportionate Collapse of the Tall Glulam Building under Fire Conditions

  • Zhao, Xuan;Zhang, Binsheng;Kilpatrick, Tony;Sanderson, Iain
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.311-321
    • /
    • 2021
  • Perception of the public to structural fires is very important because there are only a number of tall timber buildings constructed in the world. People are hesitating to accept tall timber buildings, so it is essential to ensure the first generation of tall timber buildings to a very high standard, especially fire safety. Right now, there are no specific design standards or regulations for fire design of tall timber buildings in Europe. Even though heavy timber members have better fire resistance than steel components, many conditions still need to be verified before considering the use of timber materials, e.g. fire spread, post-fire collapse, etc. This research numerically explores the structural behaviours of a tall Glulam building when one of its internal Glulam (Glued laminated timber) columns fails after sustaining a full 120-min standard fire and is removed from the established finite element building model created in SAP2000. The numerical results demonstrate that the failure and removal of the selected internal Glulam column may lead to the local failure of the adjacent CLT (Cross laminated timber) floor slabs, but will not lead to large disproportionate damage and collapse of the whole building. Here, the building is assumed to be located in Glasgow, Scotland, UK.

Post-fire Repair of Concrete Structural Members: A Review on Fire Conditions and Recovered Performance

  • Qiu, Jin;Jiang, Liming;Usmani, Asif
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.323-334
    • /
    • 2021
  • Concrete structures may rarely collapse in fire incidents but fire induced damage to structural members is inevitable as a result of material degradation and thermal expansion. This requires certain repairing measures to be applied to restore the performance of post-fire members. A brief review on investigation of post-fire damage of concrete material and concrete structural members is presented in this paper, followed by a review of post-fire repair research regarding various types of repairing techniques (FRP, steel plate, and concrete section enlargement) and different type of structural members including columns, beams, and slabs. Particularly, the fire scenarios adopted in these studies leading to damage are categorized as three levels according to the duration of gas-phase temperature above 600℃ (t600). The repair effectiveness in terms of recovered performance of concrete structural members compared to the initial undamaged performance has been summarized and compared regarding the repairing techniques and fire intensity levels. The complied results have shown that recovering the ultimate strength is achievable but the stiffness recovery is difficult. Moreover, the current fire loading scenarios adopted in the post-fire repair research are mostly idealized as constant heating rates or standard fire curves, which may have produced unrealistic fire damage patterns and the associated repairing techniques may be not practical. For future studies, the realistic fire impact and the system-level structural damage investigation are necessary.

An Experimental Study on the Behavior of Liquid Fuel Flames in the Confined Space (밀폐공간에서 액체연료 화염의 거동에 관한 실험적 연구)

  • Jeon, Kil Song;Hwang, Ji Hyun;Lee, Tea Won
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.87-93
    • /
    • 2021
  • Modern society shows rapid growth that is different from that of the development of existing technologies. The development of these technologies has led to the tendency of buildings to become dense, large and advancing. Regarding fire hazards, the possibility of large-scale fires causing fatal damage, due to the rapid spread of fire, increases. Therefore, for this reason, fire defense, i.e. detection and fire extinguishing facilities, in buildings are essential and well applied. But there are always limitations to that. Based on this reason, we would like to suggest the introduction of a new concept of a fire safety system. The method presented here is not only to use a single system for fire detection and fire extinguishing systems but to jointly use it in the environment and energy management fields within the building. However, an important step is required before introducing a system of these technologies. The fire extinguishing method proposed by this system is a method of extinguishing by blocking oxygen flowing into the space where the fire occurred. However, a sufficient basis is needed for this system to be applied in practice. Therefore, in this study, we intend to conduct a preliminary experiment to introduce the new concept of fire detection and extinguishing. The experiment used ethanol with a relatively simple combustion reaction and a high possibility of complete combustion. As a result, it was confirmed how the internal values changed during a fire using ethanol. Resultingly, we obtained the internal oxygen concentration and internal environmental changes according to the initial flame size. Lastly, the data accumulated in this study can be used as data for application in an automatic fire extinguishing system.

A Study on the Evacuation Safety Design laws based on the Fire Risk (화재리스크에 기초한 피난안전설계법에 관한 연구)

  • Huh, Ye-rim;Kim, Hye-Won;Lee, Byeong-Heun;Jin, Seung-Hyeon;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.51-52
    • /
    • 2019
  • Currently in domestic, it is difficult to the evacuation in fire due to the building is higher. Therefore it is necessary to evacuation safety design of building. To conduct the evacuation fire design of building, it should be done the Evacuation Safety Verification. But it is not sufficient the Study about Evacuation Safety Verification in currently domestic. Therefore in this study, we conducted the evacuation safety verification using people who they can't the evacuation themselves. The method of verification, we suggest the comparative that people who they can't the evacuation themselves and available safety evacuation time. Available safety evacuation time is determined by determined method from disaster statistics of casualties or equivalence with current standard requirement. it is doing to objectively judge of evacuation safety design validity in building.

  • PDF

A Study on the Development of Evaluation Methods for Fire Risk Analysis of High-rise Building ((초)고층 건축물의 화재위험성 평가기법 개발에 관한 연구(I))

  • Kwon, Young-Jin;Shin, Yi-Chul
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.223-228
    • /
    • 2008
  • Fire is recognized as a significant hazard in a service life of a structure. Therefore there is a clear need to provide an improved understanding of the performance of material and structures in fire and to provide clear design guidance in order to progress safety design especially high rise building. It is the aim of this study to investigates and analyze the study on the development of evaluation methods for fire risk analysis of high-rise building.

  • PDF

Performance Assessment Model for Fire Safety Protection of Office Building (사무소 건축물의 화재안전 성능 평가모델)

  • Yang, Eun-Bum;Hwang, Young-Sam;Lee, Chan-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.69-74
    • /
    • 2004
  • This study is to suggest a performance assessment model for fire safety protection of office building 34 asessment elements were chosen by interviewing with experts, reviewing several codes and existing relevant models, assessment elements included in this model are comprised of five categories which are 'performace of protected area', 'performance of fire partition', 'safety performance of fire escape', 'performace of smoke control system' and 'performace of fire fighting equipment'. The weight of each element was computed by systematic approach like an AHP (analytical hierarchy process), which was conducted by experts who work in the field of fire protection. This model would be utilized as a part of assessment model for the overall performace of domestic office building.

Fire Performance of 100MPa High Strength Concrete with Fire Protection Cover (100MPa급 내화피복 고강도 콘크리트의 내화성능 인증)

  • Song, Young-Chan;Kim, Yong-Ro;Kim, Ook-Jong;Lee, Do-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.21-22
    • /
    • 2010
  • In this research, the purpose is to share fire resistance method to secure 3 hours fire resistance performance which is regulation noticed by Ministry of Land, Transport and Maritime Affairs for 100MPa high strength concrete which is predicted to apply to high rise building and to propose the guideline for confirmation of fire resistance performance of high strength concrete member to which fire resistance method is applied and field application in advance.

  • PDF

A Study on the Need for Improvement of Fire Resistance Design in Underground Parking Lot due to Electric Vehicle Fire (전기자동차 화재에 따른 지하주차장 내화설계 개선 필요성 검토)

  • Kim, Hae-na;Park, Jun-Seo;Shin, Joung-Hyeon;Hong, Sang-Hun;Jung, Ui-In;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.235-236
    • /
    • 2022
  • Electric vehicle fires in underground parking lots are very dangerous, but it is judged that the current related laws and regulations do not change, which will cause problems. As a result of the analysis for the purpose of providing an electric vehicle in an underground parking lot, fire-resistance coating is essential as it can cause an explosion in the building members made of high-strength concrete when an electric vehicle fire occurs in an underground parking lot. Since a fire occurs, it is necessary to prevent electric vehicles from parking adjacent to each other.

  • PDF

Comparative Study of Beams made up of Fire Resistant Steels (내화강재 적용 단순 보부재의 고온 거동 비교 연구)

  • Kwon, In-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.111-112
    • /
    • 2017
  • Fire is very serious condition in steel based structures. Therefore, to enhance the structural stability of columns and beams in high temperatures, fire resistant steels and TMC fire resistant steels are developed from steel manufacturing companies. In this study to evaluate the structural stability and compare the resistant performance, a fire engineering design method was applied and fire resistant steels showed the better performance than other two materials.

  • PDF

Evaluation of Salt Damage Resistance of Concrete according to Fire Control Time (화재진압시간에 따른 콘크리트의 염해저항성 평가)

  • Lee, Jun-Hae;Park, Dong-cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.109-110
    • /
    • 2020
  • In the event of a fire, fire engines usually arrive within 15 minutes and become a fire suppressor. In this paper, an analytical model was established to evaluate the salt damage resistance of concrete according to fire suppression time, and the concentration of salt inside the concrete after fire was measured and the time to reach the critical concentration was assessed by how short.

  • PDF