A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.597-608
    • /
    • 2011
  • It has been often noted as a problem that as there are no objective and clear criteria for the repair cost estimate of persistent defects, when a claim arises in relation to an apartment construction, significantly different amounts of compensation may be given for similar defects based on the experience and tendencies of the construction experts asked to make a judgment. For this reason, this research aims to present defect managers with a more reasonable and objective estimation criteria and a system to determine the repair cost of defects based on an analysis of relevant factors. The research findings show that the historical cost system is applied first, and then a standard of estimation is used to estimate the cost for the items that are not included in the historical cost system. The criteria for the repair cost for each defect is as follows: the repair cost for defects arising from a regulation violation is determined by calculating the reconstruction cost of the parts in question after demolishing them; the repair cost for progressive defects is determined based on a contribution ratio proportional to the age of the building; the repair cost for repetitive defects is calculated by considering an alternative to maximize the intended function of the defective parts; and the repair cost for value depreciation defects is determined based on the ratio of the warranty period to the lapsed years. However, repair cost estimation for dual value depreciation defects should be studied in future research.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

Development of a Rule-based BIM Tool Supporting Free-form Building Integrated Photovoltaic Design (비정형 건물일체형 태양광 발전 시스템 규칙기반 BIM설계 지원 도구 개발)

  • Hong, Sung-Moon;Kim, Dae-Sung;Kim, Min-Cheol;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.53-62
    • /
    • 2015
  • Korea has been at the forefront of green growth initiatives. In 2008, the government declared the new vision toward 'low-carbon society and green growth'. The government subsidies and Feed-in Tariff (FIT) increased domestic usage of solar power by supplying photovoltaic housing and photovoltaic generation systems. Since 2000, solar power industry has been the world's fastest growing source with the annual growth rate of 52.5%. Especially, BIPV(Building Integrated Photovoltaic) systems are capturing a growing portion of the renewable energy market due to several reasons. BIPV consists of photovoltaic cells and modules integrated into the building envelope such as a roof or facades. By avoiding the cost of conventional materials, the incremental cost of photovoltaics is reduced and its life-cycle cost is improved. When it comes to atypical building, numerous problems occur because PV modules are flat, stationary, and have its orientation determined by building surface. However, previous studies mainly focused on improving installations of solar PV technologies on ground and rooftop photovoltaic array and developing prediction model to estimate the amount of produced electricity. Consequently, this paper discusses the problem during a planning and design stage of BIPV systems and suggests the method to select optimal design of the systems by applying the national strategy and economic policies. Furthermore, the paper aims to develop BIM tool based on the engineering knowledge from experts in order for non-specialists to design photovoltaic generation systems easily.

The study on Analysis of Influence factors on Items in Apartment House Maintenance Cost (공동주택 관리비 항목별 영향요인 분석 연구)

  • Lim, Nam-gi;Park, Chan-jeong;Jung, Sang-jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.155-162
    • /
    • 2002
  • In this research, I finally came to a conclusion analyzing the connection among managing of each items in management expenses, the size of each complex and stories, and the term of using. (1) In the managing cost regarding to the management manner, although the managing cost of self-governing management is less imposed than the one of commission management, there is slight difference between those Costs. And it is more important to consider the effectiveness of management than to emphasize reduction of management cost. (2) The higher the stories, the higher the managing cost of elevator per the unit area. It Is caused by the fact that the father the distance of the elevator operating, the higher the electric charges. (3) The third of one of total management cost goes to pay the personnel expenses. So I found that the effective management of the expenses is available to reduce management cost. (4) The higher the stones, the lower the cost of personnel expenses including the cleaner cost. (5) The sum of costs assigned in repairment and management increases in proportion to the term of using. The costs assigned in special repairment and management are interacting to each other. (6) To reduce the management cost, we have to cut down the personnel in security guard that occupies one third of total management cost with application to the joint security system and operation of the self-governing guard. Through this process, it will be easy to accomplish the rationalization of contract with an outside order. Because the improvement of management service is not only the responsibility of owner but also the one of dwellers. And it Is imperative to realize the importance of cooperation and trust between the owner and dwellers. And the establishment of effective managing system which has convenience and rationality must be settled without delay.

The PHC-Pile Cost Effect on Sale Price for Multi-Family Housing (PHC-pile 공사비가 공동주택 분양가에 미치는 영향)

  • Cha, Yongwoon;Park, Taeil;Park, Wonyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.94-101
    • /
    • 2020
  • This study examined the effect of the sale price by excluding the PHC-pile cost from the construction costs for basic type (CCsBT) as an additional cost. The Ministry of Land, Infrastructure, and Transport excluded the PHC-pile cost in the CCsBT and new method so that only the designed pile quantity was recognized as an additional cost. The effect on the sale price was analyzed by comparing the pile cost of the existing and new methods. For this purpose, seven cases were selected, and the PHC-pile cost was estimated. The existing method was estimated as the ratio of the pile cost to CCsBT. The new method was estimated based on the bill of quantity. As a result, the CCsBT decreased by approximately 2-3% when the PHC-pile cost was calculated in the new method. Furthermore, as a result of comparing the sale price, excluding the PHC-pile cost with the sale price, the CCsBT decreased by approximately 1%. These results are expected to help improve the understanding of the CCsBT. Also, this paper contributes to promoting national housing stability through institutional improvement.

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Life Cycle Cost Analysis about Renewable Energy Facilities Combination of Photovoltaic system, Solar thermal system and Geothermal system (태양광발전, 태양열 급탕, 지열시스템의 신재생에너지설비 조합에 관한 LCC 분석)

  • Chun, Sang Hyun;Ahn, Jang-Won;Kim, Wonwoo;Cho, Seung-Yun
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.105-112
    • /
    • 2012
  • When a building is planned and designed, the design should be able to minimize the cost during the whole life cycle of the building. This study has begun to analyze LCC about the alternative design which is applicable to renewable energy facility construction. It is reviewed domestic and foreign papers about the trend of LCC technology and it is determined the analytical method to analyze the LCC of renewable energy. Regarding the review of alternatives, it is chosen the three alternatives which are able to designed combing the renewable energy facilities and it is performed the LCC analysis about each alternative. Alternative 1 is Photovoltaic + Solar Thermal + Photovoltaic /Wind Power, Alternative 2 is Geothermal + Photovoltaic, and Alternative 3 is Photovoltaic + Solar Thermal. The LCC analysis is present value method, its analytical period is 40 years and it is applied 3.2% of real discount rate. As a result, it is proved that Alternative 1 and Alternative 3 are not able to collectible the early investment cost during the analytical period and Alternative 2 is analyzed that its pay-back period of early investment cost is about 31 years. As the final outcome of this study on case analysis, it is more advantageous to use the combination of Geothermal and Photovoltaic energy than to use the other combination in LCC aspect.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.