• 제목/요약/키워드: Building Cost

검색결과 2,760건 처리시간 0.055초

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

분쟁청구비용을 고려한 건설 분쟁의 위험요인 (Construction Conflict Risk Factors based on the Conflict Cost)

  • 신한우;서장우;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

건설공사 공종별 재작업 비용의 정량적 분석 (Quantitative Analysis of Work Type's Rework Cost in Construction Project)

  • 지성준;박정은;차용운;한상원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2016
  • Rework is a major cause that adversely affects the performance of a construction project, such as schedule delay or cost overrun. In order to prevent rework, research has been mainly conducted to analyze the cause of rework, but limited to quantitatively measure cost of rework and analyze its impact on project performance. Therefore, this paper aims to analyze impact of rework cost using 369 rework items collected from 3 construction site. This research is expected to accurately determine control target of rework and to improve efficiency of business operations in construction project.

  • PDF

원가산정을 위한 표준분류체계 활용한 지식체계 개발 (Knowledge Structure for Cost Estimates Based on Standardized Cost Database)

  • 임혜경;강남희;최재현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

시중노임단가 조사방법의 개선을 위한 기초연구 (A Basic Study for Improving of Labor Cost Survey in the Construction Market)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2019
  • This study performs analyzing a status of labor cost policy of public construction project and labor management information system in Korea for improving of labor cost survey in the construction market. The outcome of this study will be helpful to build a labor cost information system included the information of man-hour, regular pay and benefit, total wage. And if these result is integrated with the information of worker's career, qualification, skill level, it is confidently expected that the survey of labor cost is reliable.

  • PDF

설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 - (A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage -)

  • 박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

설계단계 공사비관리 효율성의 주요영향요인 분석 (Key Influence Factors for Efficient Cost Management of Design Stages)

  • 우유미;송종관;조규만;이현종;홍태훈;현창택;구교진
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.176-184
    • /
    • 2007
  • 최근 건설 사업에서 시공이전단계인 설계단계 공사비관리의 중요성이 대두되고 있지만, 설계단계 공사비관리를 위한 제도적 장치나 기술수준은 외국에 비해 매우 낙후되어 있다. 전통적으로 건설 사업에서 공사비관리는 시공단계에 국한되어, 설계단계 공사비관리를 위한 기본 틀과 분류 표준, 공사비 데이터 등 인프라가 부족하여 설계단계 공사비관리 업무를 수행하는데 있어 한계가 있다. 따라서 본 연구에서는 국내 설계단계에서 공사비관리가 효율적으로 수행되기 위해 관리되어야 할 주요 영향요인을 도출하고자 하였다. 설계실무자를 대상으로 설문조사를 통해 설계단계 공사비관리 현황과 문제점을 분석하였고, 설계단계 공사비관리 저해항목에 대해 공사비관리 업무에 미치는 영향도를 조사하였다. 요인분석을 통해 5개의 설계단계 공사비관리 주요 영향요인을 도출하여 향후 설계단계 공사비관리 지원도구 및 제도적 기반 구축에 기여할 수 있도록 하였다.

초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구 (Development and Application of Unit Table Form using Euro Form for High-rise Building Construction)

  • 양성우;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토 (Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic)

  • 김성진;박성진;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

적정 건물 설계를 위한 Target Costing 개념 제안 (A Suggestion of a Target Costing Concept for Optimal Building Design)

  • 안준석
    • 한국건축시공학회지
    • /
    • 제10권6호
    • /
    • pp.137-143
    • /
    • 2010
  • 사용되는 새로운 원가 관리 방안으로 시장 상황에 따라 제품의 가격을 고정하고, 고정된 제품가격에서 기업의 이익과 비용을 차감함으로써 산출하는 시장 지향적 원가산출 방법이다. 본 논문은 프로젝트 개발에서부터 원가 관리의 개념을 도입하는 Target Costing의 개념을 고찰함을 목적으로 한다. "낭비의 최소화, 가치의 최대화"는 프로젝트의 기획 단계에서 건물의 적정 설계 가이드라인을 설정함으로써 얻을 수 있다. 이러한 효과적 예산 관리 방법은 한국의 호화청사 건설 문제를 타개 방안이 될 수 있을 것이다.