• 제목/요약/키워드: Building Control System

검색결과 1,618건 처리시간 0.029초

A Study on Control and Monitoring System for Building Energy Management System

  • Oh, Jin-Seok;Bae, Soo-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권3호
    • /
    • pp.335-340
    • /
    • 2011
  • Building energy saving is one of the most important issues in these days. Control algorithm for energy saving should be designed properly to reduce power consumption in building. Recently, building energy system consists of hybrid energy system coupling with RE (Renewable Energy) source. In this paper, an optimum control algorithm for building energy saving is applied to BEMS (Building Energy Management System) by using an outdoor air temperature prediction strategy. BEMS coupling with renewable energy can control HVAC (Heating, Ventilating and Air-Conditioning) system effectively. In order to verify the effectiveness of building energy saving, BEMS was tested for several months at a laboratorial chamber with an air conditioner, fan and heater. To this end BEMS embedded control algorithm has been tested successfully.

빌딩 제어 및 관리 시스템 개발에 관한 연구 -조명 제어 관리 시스템 구축을 중심으로- (A Study on the Development of Building Control and management System -Focusing on the Lighting Control and Monitoring system-)

  • 조성오
    • 한국실내디자인학회논문집
    • /
    • 제16권4호
    • /
    • pp.110-118
    • /
    • 2007
  • Technology has been viewed at various stages of civilization as leading to future progress. The building, its services systems and management of the work process all contribute to the well-being of people within an organization. Productivity relies on there being a general sense of high morale and satisfaction with the workplace. Now buildings are considered as providing a milieu for human creativity. Flexibility, adaptability, service integration and high standards of finishes offer an intelligence threshold. Building Automation System(BAS) - controlled lighting systems may offer incremental energy saving. Conventional Lighting control systems often control equipment in a single room or over the limited area, because they are centralized control systems, which means that all the controlled circuits must be wired to a single control panel. The computers used by these systems are typically dedicated microprocess that perform only lighting control functions. By comparison, modern Building automation systems are distributed control system, which means that their computing hardware and software are distributed as a network that microprocessor-based control modules and standard PC. PLC(Programmable Logic controller) is extensible virtually without limits, so that all the lighting in a facility can be controlled by single, unified system - the same system that also can control and monitor the building's HVAC, security, and manufacturing processed, elevators, and more. A Building automation system can control light using schedules, manual controls, occupancy sensors, and photosensors, either singly or in combination. Building Lighting control and monitoring system will be for a energy saving and efficient building management system.

빌딩 에너지 관리 최적화 알고리즘 설계 및 구현 (Design and Implementation of Optimal Control Algorithms for Building Energy Management)

  • 진중화;정선태
    • 설비공학논문집
    • /
    • 제16권10호
    • /
    • pp.969-976
    • /
    • 2004
  • Building energy saving is one of the most important issues in these days. Energy saving control strategies should be developed properly to achieve the saving. One of such area we could apply is the HVAC (Heating, Ventilation and Air-Conditioning) system. Through the optimal control algorithm for building energy management system (EMS), you can not only save the cost of building energy, but also protect HVAC system components against the unexpected condition. In order to verify the effectiveness of building energy saving, field test was accomplished for several months at 'A' building. And to get the measured data, remote control was used. If the remote control is used in BAS (Building Automation System), control and monitoring can be done for all of the building systems, such as HVAC, power, lighting, security and fire-alarm etc. anywhere any time. Using the remote control, Control and monitoring is possible for the testing system without going there. As the results of field test, we could reduce $5{\sim}10\%$ of the building energy cost.

지능형 빌딩 시스템을 위한 임베디드 웹 서버와 XML 웹 서비스의 구현 (Implementation of Embedded Web Server and XML Web Services for Intelligent Building System)

  • 김태국;장형준;박귀태
    • 제어로봇시스템학회논문지
    • /
    • 제13권12호
    • /
    • pp.1167-1172
    • /
    • 2007
  • The existing building control and automation systems which have been applied to buildings are provided by many different vendors and each vendor has its own proprietary protocol. There are many problems in system integration since those building control and automation systems belong to each vendor. Also, the problems of cost and space increase, due to the usage of personal computers as the control servers of DDC(Direct Digital Control) in each facility. Those problems mentioned above can be effectively resolved by using XML Web Services and Embedded Web Server. Embedded Web Server and XML Web Services are technologies emerging out of the IT industries and there are many researches to apply them into many fields. In this paper, Embedded Web Server and XML Web Services are proposed to be used in building control and automation system to resolve problems in building system integration.

Numerical and experimental investigation of control performance of active mass damper system to high-rise building in use

  • Park, S.J.;Lee, J.;Jung, H.J.;Jang, D.D.;Kim, S.D.
    • Wind and Structures
    • /
    • 제12권4호
    • /
    • pp.313-332
    • /
    • 2009
  • This paper numerically and experimentally investigates the control performance of the active mass damper (AMD) systems in a 26-story high-rise building in use. This is the first full-scale application of the AMD system for suppressing the wind-induced vibration of a building structure in Korea. In addition, the AMD system was installed on top of the building already in use, which may be the world's first implementation case. In order to simultaneously mitigate the transverse-torsional coupled vibration of the building, two AMD systems were applied. Moreover, the H-infinity control algorithm has been developed to utilize the maximum capacity of the AMD system. From the results of numerical simulation using the wind load obtained from the wind tunnel tests, it was found that the maximum acceleration responses of the building were reduced significantly. Moreover, the control performance of the installed AMD system was examined by carrying out the free and forced vibration tests. The acceleration responses on top of the building in the controlled case measured under strong wind loads were compared with those in the uncontrolled case numerically simulated by using the wind load deduced from the measured data and a structural model of the building. It is demonstrated that the AMD system shows good control performance in reducing the building accelerations.

Developing Intelligent Control Modules with LonTalk Protocol for Intelligent Building System & Home Automation

  • Hong, Won-Pyo;Kim, Dong-Hwa;Lee, Sung-Hak
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2002년도 학술대회논문집
    • /
    • pp.355-361
    • /
    • 2002
  • There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires open network with for the standard communication protocol and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the open distributed fire alarm signaling system for the integration of BAS, a new intelligent control modules with LonTalk protocol and a new control modules for power line communication. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation sub-systems and another BAS with low cost. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate integrated building systems.

  • PDF

Integration of health monitoring and vibration control for smart building structures with time-varying structural parameters and unknown excitations

  • Xu, Y.L.;Huang, Q.;Xia, Y.;Liu, H.J.
    • Smart Structures and Systems
    • /
    • 제15권3호
    • /
    • pp.807-830
    • /
    • 2015
  • When a building structure requires both health monitoring system and vibration control system, integrating the two systems together will be cost-effective and beneficial for creating a smart building structure with its own sensors (nervous system), processors (brain system), and actuators (muscular system). This paper presents a real-time integrated procedure to demonstrate how health monitoring and vibration control can be integrated in real time to accurately identify time-varying structural parameters and unknown excitations on one hand, and to optimally mitigate excessive vibration of the building structure on the other hand. The basic equations for the identification of time-varying structural parameters and unknown excitations of a semi-active damper-controlled building structure are first presented. The basic equations for semi-active vibration control of the building structure with time-varying structural parameters and unknown excitations are then put forward. The numerical algorithm is finally followed to show how the identification and the control can be performed simultaneously. The results from the numerical investigation of an example building demonstrate that the proposed method is feasible and accurate.

인텔리전트 빌딩의 제어 시스템 및 네트워크의 통합 시뮬레이션에 관한 연구 (A Study on The Integrated Simulation of The Intelligent Building Control Systems and Network)

  • 신진석;임동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 추계학술대회 논문집 학회본부
    • /
    • pp.106-108
    • /
    • 1997
  • Many new office buildings are being built as intelligent buildings equipped with building automation(HA) systems, office automation(OA) systems, and telecommunication(TC) systems in order to provide pleasant building environment and the ease of maintenance and facility management. Building control systems which are employed in intelligent buildings require varieties of advanced control systems and network systems for efficient integrated management. Design and installation of these types of advanced building control systems take a lot of efforts and also they are costly. In order to design these systems, it is necessary for the designers to have the integrated simulator including proper network system simulation. In this paper, the integrated simulator that consist of HVAC system, lighting system, elevator system, parking system based on the network system is presented. For the development of integrated simulator, AHENA which is the general-purpose software tool for a simulation with reinforced GUI is used.

  • PDF

빌딩청소로봇을 위한 그래픽 사용자 인터페이스 시스템 (Graphic User Interface System for a Building Cleaning Robot)

  • 조원호;이수영;최병욱
    • 로봇학회논문지
    • /
    • 제5권3호
    • /
    • pp.209-215
    • /
    • 2010
  • This paper presents a graphic user interface system consisting of graphic simulator and remote control system for a building cleaning robot. It provides a tool of convenient 3D graphical map construction for real world. The 3D map is reconstructed from existing 2D building CAD data with DXF format by using OpenGL graphic API. Through this system, graphic display of robot's status information, remote control and cleaning scheduling can be done for a building cleaning robot. This proposed system is expected to give efficient way of graphic simulation and remote monitoring and control system for a building cleaning robot.

Semi-active control of seismic response of a building using MR fluid-based tuned mass damper

  • Esteki, Kambiz;Bagchi, Ashutosh;Sedaghati, Ramin
    • Smart Structures and Systems
    • /
    • 제16권5호
    • /
    • pp.807-833
    • /
    • 2015
  • While tuned mass dampers are found to be effective in suppressing vibration in a tall building, integrating it with a semi-active control system enables it to perform more efficiently. In this paper a forty-story tall steel-frame building designed according to the Canadian standard, has been studied with and without semi-active and passive tuned mass dampers. The building is assumed to be located in the Vancouver, Canada. A magneto-rheological fluid based semi-active tuned mass damper has been optimally designed to suppress the vibration of the structure against seismic excitation, and an appropriate control procedure has been implemented to optimize the building's semi-active tuned mass system to reduce the seismic response. Furthermore, the control system parameters have been adjusted to yield the maximum reduction in the structural displacements at different floor levels. The response of the structure has been studied with a variety of ground motions with low, medium and high frequency contents to investigate the performance of the semi-active tuned mass damper in comparison to that of a passive tuned mass damper. It has been shown that the semi-active control system modifies structural response more effectively than the classic passive tuned mass damper in both mitigation of maximum displacement and reduction of the settling time of the building.