비용구조분석에 의한 건축단계별 공사비용 절감방법 (The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure)

  • 박근준
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구 (Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method)

  • 이병훈;진현수;김경훈;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF

군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가 (Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project)

  • 김진원;방종대;손정락
    • 대한건축학회논문집:구조계
    • /
    • 제33권12호
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

공동주택 건설공사비지수의 변동추세 분석 (Analysing Construction Cost Index Fluctuation on Apartment Housing)

  • 박원영;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

A Neural Network Model for Building Construction Projects Cost Estimating

  • El-Sawalhi, Nabil Ibrahim;Shehatto, Omar
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.9-16
    • /
    • 2014
  • The purpose of this paper is to develop a model for forecasting early design construction cost of building projects using Artificial Neural Network (ANN). Eighty questionnaires distributed among construction organizations were utilized to identify significant parameters for the building project costs. 169 case studies of building projects were collected from the construction industry in Gaza Strip. The case studies were used to develop ANN model. Eleven significant parameters were considered as independent input variables affected on "project cost". The neural network model reasonably succeeded in estimating building projects cost without the need for more detailed drawings. The average percentage error of tested dataset for the adapted model was largely acceptable (less than 6%). Sensitivity analysis showed that the area of typical floor and number of floors are the most influential parameters in building cost.

건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구 (Forecasting of building construction cost variation using BCCI and it's application)

  • 조훈희;강경인;김창덕;조문영
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

주택원가지수 산정모델 작성 사례연구 (Case Study on Development of Residential Building Cost Index Compilation Model)

  • 조훈희;이유섭;강태경
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.220-226
    • /
    • 2003
  • 주택원가지수는 주택건설사업에 투입되는 각종 자원들의 물가변동을 단일지수 형태로 표현한 자료로 이를 통하여 주택원가의 가격변동 수준에 대한 적정성을 판단할 수 있다. 본 연구에서는 국내 기초 통계자료에 대한 검토결과를 토대로 주택원가지수를 작성할 수 있는 방법을 검토하고 사례연구를 통하여 주택원가지수를 제시하였다 본 연구에서 제시한 지수를 활용함으로써 주택건설 원가의 변동을 용이하게 파악하며 공사비 실적자료의 활용성 제고를 위한 기반을 제공하고자 한다.